Berikut sebagian screen capture file ini. Geser ke kiri pada layar.
|
KEGIATAN |
|
|
: PEMBANGUNAN GEDUNG KANTOR |
|
|
|
|
|
|
PEKERJAAN |
|
|
: PEMBANGUNAN GEDUNG ARSIP DAN PENATAAN LINGKUNGAN SETWAN |
|
|
|
|
|
|
LOKASI |
|
|
: KAB. BATANG |
|
|
|
|
|
|
TAHUN ANGGARAN |
|
|
: 2016 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NO. |
URAIAN PEKERJAAN |
VOLUME |
SAT. |
ANALISA |
HARGA SATUAN (Rp.) |
JUMLAH BIAYA (Rp.) |
I |
PEMBANGUNAN GEDUNG ARSIP |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A |
PEKERJAAN PERSIAPAN |
|
|
|
|
|
|
|
|
1 |
Pembongkaran Bangunan Lama & Sewa Direksi |
1.000 |
Ls |
Taksir |
|
|
2 |
Uetzet dan Bowplank |
|
1.000 |
Ls |
Taksir |
|
|
3 |
Papan Nama Kegiatan |
|
|
|
1.000 |
Ls |
Taksir |
|
|
|
TOTAL A |
|
|
|
|
|
|
|
|
B |
PEKERJAAN TANAH & PASANGAN |
|
|
|
|
|
|
|
|
1 |
Galian Footplat |
|
|
|
24.960 |
m3 |
A.2.3.1.1. |
|
|
2 |
Urugan Tanah Kembali |
|
|
|
6.240 |
m3 |
A.2.3.1.3. |
|
|
3 |
Urugan tanah baru |
|
|
|
26.075 |
m3 |
A.2.3.1.2. |
|
|
4 |
Urugan pasir di bawah pondasi |
|
|
|
1.524 |
m3 |
A.2.3.1.11. |
|
|
5 |
Urugan pasir di bawah lantai |
|
|
|
3.275 |
m3 |
A.2.3.1.11. |
|
|
6 |
Pas. Lantai Kerja 5 cm bawah Footplat |
|
|
|
0.384 |
m3 |
A.4.1.1.1 |
|
|
7 |
Pas. Anstamping |
|
|
|
4.080 |
m3 |
A.3.2.1.9. |
|
|
8 |
Pas. Pondasi Batu Belah 1 Pc : 5 Ps |
|
|
|
11.100 |
m3 |
A.3.2.1.3. |
|
|
9 |
Pas. Bata ½ camp. 1 : 5 |
|
|
|
223.025 |
m2 |
A. 4.4.1.10 |
|
|
10 |
Plesteran 1 PC : 5 PS tebal 15 mm |
|
|
|
428.800 |
m2 |
A.4.4.2.5. |
|
|
11 |
Pas. Acian |
|
|
|
428.800 |
m2 |
ls |
|
|
12 |
Pas. Lantai Keramik 40x40 |
|
|
|
124.230 |
m2 |
A.4.4.3.34. |
|
|
13 |
Pas. Granit Tile 60x60 dinding |
|
|
|
17.250 |
m2 |
taksir |
|
|
14 |
Pas. Ralling Tangga Stainlees |
|
|
|
6.900 |
m2 |
taksir |
|
|
15 |
Pas. Pipa PVC AW 3" Talang |
|
|
|
18.000 |
m1 |
A.5.1.1 31. |
|
|
16 |
Pas. Saluran U-30 |
|
|
|
51.510 |
m1 |
A.5.1.1 35. |
|
|
17 |
Pas. Tutup Saluran Plat Beton t= 10 cm |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
0.75 |
m3 |
A. A.4.1.1.5 |
|
|
|
b. besi tulangan |
|
|
|
72.01 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
4.50 |
m2 |
A.4.1.1.24 |
|
|
|
TOTAL B |
|
|
|
|
|
|
|
|
C |
PEKERJAAN BETON |
|
|
|
|
|
|
|
|
1 |
Pas. Footplat 80x80 |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
3.27 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
706.94 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
21.60 |
m2 |
A.4.1.1.20 |
|
|
2 |
Pas. Sloof 20/30 |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
2.04 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
197.21 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
20.40 |
m2 |
A.4.1.1.21 |
|
|
3 |
Pas. Sloof 15/20 |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
0.36 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
60.22 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
4.80 |
m2 |
A.4.1.1.21 |
|
|
4 |
Pas. Kolom 30/30 |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
7.92 |
m3 |
A. A.4.1.1.5 |
|
|
|
b. besi tulangan |
|
|
|
1363.36 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
105.60 |
m2 |
A.4.1.1.22 |
|
|
5 |
Pas. Kolom Praktis 15/15 |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
0.47 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
100.54 |
kg |
A.4.1.1.17 |
|
|
|
. begesting 3x pakai |
|
|
|
6.30 |
m2 |
A.4.1.1.22 |
|
|
6 |
Pas. Balok 30/50 |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
6.27 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
378.12 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
58.30 |
m2 |
A.4.1.1.23 |
|
|
7 |
Pas. Balok Latiu 15/15 |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
0.79 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
128.03 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
15.75 |
m2 |
A.4.1.1.23 |
|
|
8 |
Pas. Balok 20/30 |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
1.92 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
242.46 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
25.60 |
m2 |
A.4.1.1.23 |
|
|
9 |
Pas. Balok 15/20 |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
0.29 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
48.22 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
3.36 |
m2 |
A.4.1.1.23 |
|
|
10 |
Pas. Plat Lantai t=12cm |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
6.72 |
m3 |
A. A.4.1.1.5 |
|
|
|
b. besi tulangan |
|
|
|
1315.44 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 2x pakai |
|
|
|
63.00 |
m2 |
A.4.1.1.24 |
|
|
11 |
Pas. Plat Tangga t=12cm |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
1.03 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
188.72 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 2x pakai |
|
|
|
8.60 |
m2 |
A.4.1.1.24 |
|
|
12 |
Pas. Plat Talang t=10cm |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
0.81 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
73.55 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
8.10 |
m2 |
A.4.1.1.24 |
|
|
13 |
Pas. Plat Topi- Topi t=10cm |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
3.63 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
327.94 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
36.30 |
m2 |
A.4.1.1.24 |
|
|
|
TOTAL C |
|
|
|
|
|
|
|
|
D |
PEKERJAAN ATAP |
|
|
|
|
|
|
|
|
1 |
Pek. Rangka Atap Baja Ringan |
|
|
|
75.15 |
m2 |
taksir |
|
|
2 |
Pek. Lapis Alumunium Foil |
|
|
|
75.15 |
m2 |
taksir |
|
|
3 |
Pek. Atap Genteng Metal Perpasir |
|
|
|
75.15 |
m2 |
taksir |
|
|
4 |
Pek. Bubungan Genteng Metal |
|
|
|
24.00 |
m1 |
taksir |
|
|
5 |
Pek. Woodplank |
|
|
|
36.00 |
m1 |
taksir |
|
|
|
TOTAL D |
|
|
|
|
|
|
|
|
E |
PEKERJAAN PINTU & JENDELA ALUMINIUM |
|
|
|
|
|
|
|
|
1 |
Pek. Kusen Alumunim 4" |
|
|
|
151.90 |
m1 |
A.4.2.1.11. |
|
|
2 |
Pek. Daun Pintu & Jendela Alumunium |
|
|
|
7.70 |
m2 |
A.4.2.1.13. |
|
|
3 |
Pas. Kaca Tebal 5mm |
|
|
|
11.60 |
m2 |
A.4.6.2.17. |
|
|
4 |
Kunci tanam 2 slag |
|
|
|
1.00 |
unit |
A.4.6.2.2. |
|
|
5 |
Engsel pintu |
|
|
|
6.00 |
unit |
A.4.6.2.5. |
|
|
6 |
Engsel Jendela |
|
|
|
12.00 |
unit |
A.4.6.2.6. |
|
|
7 |
Grendel pintu |
|
|
|
2.00 |
unit |
A.4.6.2.11. |
|
|
8 |
Grendel Jendela |
|
|
|
6.00 |
unit |
A.4.6.2.11. |
|
|
9 |
Kait Angin |
|
|
|
12.00 |
unit |
A.4.6.2.9. |
|
|
10 |
Pek. Door Closer |
|
|
|
2.00 |
unit |
taksir |
|
|
|
TOTAL E |
|
|
|
|
|
|
|
|
F |
PEKERJAAN LANGIT-LANGIT |
|
|
|
|
|
|
|
|
1 |
Pas. Rangka Hollow 40 x40 x 0.2mm |
|
|
|
120.00 |
m2 |
A.4.2.1.21. |
|
|
2 |
Pas. Gypsum board (120x240x9) mm, tebal 9 mm |
|
|
|
120.00 |
m2 |
A.4.5.1.7. |
|
|
3 |
Pas. List Gypsum 10 cm |
|
|
|
110.00 |
m1 |
taksir |
|
|
|
TOTAL F |
|
|
|
|
|
|
|
|
G |
PEKERJAAN PENGECATAN |
|
|
|
|
|
|
|
|
1 |
Pengecatan Dinding Baru Exterior |
|
|
|
275.81 |
m2 |
A.4.7.1.9. |
|
|
2 |
Pengecatan Dinding Baru Interior |
|
|
|
275.81 |
m2 |
A.4.7.1.10. |
|
|
3 |
Pengecatan Plafond |
|
|
|
120.00 |
m2 |
A.4.7.1.10. |
|
|
4 |
Pengecatan Woodplank |
|
|
|
7.20 |
m2 |
A.4.7.1.4. |
|
|
|
TOTAL G |
|
|
|
|
|
|
|
|
H |
PEKERJAAN INSTALASI LISTRIK |
|
|
|
|
|
|
|
|
1 |
Bok MCB |
|
|
|
1.00 |
unit |
taksir |
|
|
2 |
MCB |
|
|
|
2.00 |
unit |
taksir |
|
|
3 |
instalasi listrik |
|
|
|
22.00 |
unit |
taksir |
|
|
4 |
Stop Kontak |
|
|
|
5.00 |
unit |
taksir |
|
|
5 |
Stop Kontak AC |
|
|
|
4.00 |
unit |
taksir |
|
|
6 |
Saklar Ganda |
|
|
|
2.00 |
unit |
taksir |
|
|
7 |
Saklar Tunggal |
|
|
|
3.00 |
unit |
taksir |
|
|
8 |
lampu TL 28 Watt + Batten |
|
|
|
9.00 |
unit |
taksir |
|
|
10 |
lampu DL 18 Watt + Cover Silver |
|
|
|
13.00 |
unit |
taksir |
|
|
11 |
Penyambungan Jaringan dari Bangunan Lama |
|
|
|
1.00 |
ls |
LS |
|
|
|
TOTAL H |
|
|
|
|
|
|
|
|
|
JUMLAH I |
|
|
|
|
|
|
|
|
II . |
PENATAAN LINGKUNGAN SEKERTARIAT DEWAN |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A |
PEKERJAAN TANAH & PASANGAN |
|
|
|
|
|
|
|
|
1 |
Galian Tanah Pondasi & Footplat |
|
|
|
1.728 |
m3 |
A.2.3.1.1. |
|
|
2 |
Urugan Tanah Kembali |
|
|
|
0.432 |
m3 |
A.2.3.1.3. |
|
|
3 |
Urugan Pasir Bawah Pondasi & Footplat |
|
|
|
0.192 |
m3 |
A.2.3.1.11. |
|
|
4 |
Urugan Pasir Bawah Lantai |
|
|
|
5.892 |
m3 |
A.2.3.1.11. |
|
|
5 |
Pas. Lantai Kerja 5 cm bawah Footplat |
|
|
|
0.072 |
m3 |
A.4.1.1.1 |
|
|
6 |
Pas. Pasang Batu Bata 1 pc : 5 ps (parkir) |
|
|
|
6.000 |
m2 |
A. 4.4.1.10 |
|
|
7 |
Pas. Plesteran 1 pc : 5 ps Tebal 15 mm (parkir) |
|
|
|
12.000 |
m2 |
A.4.4.2.5. |
|
|
8 |
Pas. Acian |
|
|
|
12.000 |
m2 |
ls |
|
|
9 |
Pas. Pasang Batu Expose 1 pc : 3 ps (doorlop) |
|
|
|
8.400 |
m2 |
taksir |
|
|
10 |
Pas. Lantai Keramik 40x40 TERAS GEDUNG SEKWAN |
|
|
|
75.840 |
m2 |
A.4.4.3.34. |
|
|
11 |
Pas. Talang U-15 Teras Mes & Gedung Sekwan |
|
|
|
25.000 |
m1 |
taksir |
|
|
12 |
Pas. Rabat Beton t= 10 cm |
|
|
|
4.800 |
m3 |
A.4.1.1.1 |
|
|
13 |
Pas. Lantai Keramik Warna Pecah 3-5 cm |
|
|
|
12.000 |
m2 |
taksir |
|
|
14 |
Pas. Batu Serit |
|
|
|
10.500 |
m2 |
taksir |
|
|
|
TOTAL A |
|
|
|
|
|
|
|
|
B |
PEKERJAAN BETON BERTULANG |
|
|
|
|
|
|
|
|
1 |
Pas. Footplat 60x60 |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
0.930 |
m3 |
A. A.4.1.1.5 |
|
|
|
b. besi tulangan |
|
|
|
92.139 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
7.200 |
m2 |
A.4.1.1.21 |
|
|
2 |
Pas. Sloof 15/20 (door lop & parkir) |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
0.570 |
m3 |
A. A.4.1.1.5 |
|
|
|
b. besi tulangan |
|
|
|
74.845 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
7.600 |
m2 |
A.4.1.1.22 |
|
|
3 |
Pas. Kolom 30/30 |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
1.260 |
m3 |
A. A.4.1.1.5 |
|
|
|
b. besi tulangan |
|
|
|
109.473 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
16.800 |
m2 |
A.4.1.1.22 |
|
|
4 |
Pas. Kolom 20/20 (parkir) |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
0.400 |
m3 |
A. A.4.1.1.5 |
|
|
|
b. besi tulangan |
|
|
|
42.824 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
8.000 |
m2 |
A.4.1.1.22 |
|
|
5 |
Pas. Balok 15/20 |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
0.660 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
86.377 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
7.700 |
m2 |
A.4.1.1.23 |
|
|
6 |
Pas. Balok 10/20 (parkir) |
|
|
|
|
|
|
|
|
|
a. beton K-175 |
|
|
|
0.180 |
m3 |
A. A.4.1.1.5. |
|
|
|
b. besi tulangan |
|
|
|
33.055 |
kg |
A.4.1.1.17 |
|
|
|
c. begesting 3x pakai |
|
|
|
4.500 |
m2 |
A.4.1.1.23 |
|
|
|
TOTAL B |
|
|
|
|
|
|
|
|
C |
PEKERJAAN RANGKA & PENUTUP ATAP |
|
|
|
|
|
|
|
|
1 |
Pasang Atap Polycarbonatet Twinlite 8mm Rangka |
|
|
|
36.000 |
m2 |
taksir |
|
|
|
Hollow 40,60,2 |
|
|
|
|
|
|
|
|
2 |
Pas. Gording Kayu Kampas 6/12 (parkir) |
|
|
|
0.392 |
m3 |
A.4.6.1.15 |
|
|
3 |
Pas. Atap Asbes Gelombang Kecil (parkir) |
|
|
|
35.000 |
m2 |
A.4.5.2.11 |
|
|
|
TOTAL C |
|
|
|
|
|
|
|
|
D |
PEKERJAAN PENGECATAN |
|
|
|
|
|
|
|
|
1 |
Pengecatan Dinding |
|
|
|
36.480 |
m2 |
A.4.7.1.10 |
|
|
|
TOTAL D |
|
|
|
|
|
|
|
|
|
JUMLAH II |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL I + II |
|
|
|
|
|
|
|
|
|
PPN 10% |
|
|
|
|
|
|
|
|
|
JUMLAH TOTAL |
|
|
|
|
|
|
|
|
|
DIBULATKAN |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DAFTAR ANALISA PEKERJAAN |
|
|
|
|
|
|
|
|
|
|
|
SUMBER DATA |
|
|
|
|
|
|
|
|
|
DAERAH |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
HARGA BAHAN/UPAH |
JUMLAH |
No. |
SNI |
KODE |
KOEF |
SAT. |
URAIAN PEKERJAAN |
|
|
|
|
|
|
|
|
Rp |
Rp |
|
|
|
|
|
|
|
|
|
|
II |
A.2.3.1 |
|
|
|
HARGA SATUAN PEKERJAAN TANAH |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
A.2.3.1.1 |
|
1 |
m3 |
Menggali Tanah Biasa Sedalam 1 m |
|
|
|
|
|
|
|
|
A |
TENAGA |
|
|
|
|
|
|
L.01 |
0.75 |
OH |
Pekerja |
|
|
|
|
|
|
L.04 |
0.025 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
BAHAN |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
A.2.3.1.2. |
|
1 |
m3 |
Pengurugan 1 m3 dengan Tanah urug |
|
|
|
|
|
|
|
|
A |
TENAGA |
|
|
|
|
|
|
L.01 |
0.25 |
OH |
Pekerja |
|
|
|
|
|
|
L.04 |
0.025 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
BAHAN |
|
|
|
|
|
|
|
1.2 |
|
Tanah urug |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
0 |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
A.2.3.1.3. |
|
1 |
m3 |
Pengurugan Kembali 1 m3 dengan Tanah Galian |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A |
TENAGA |
|
|
|
|
|
|
L.01 |
0.50 |
OH |
Pekerja |
|
|
|
|
|
|
L.04 |
0.050 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
BAHAN |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
A.2.3.1.11 |
|
1 |
m3 |
Urugan Pasir |
|
|
|
|
|
|
|
|
A |
TENAGA |
|
|
|
|
|
|
L.01 |
0.30 |
OH |
Pekerja |
|
|
|
|
|
|
L.04 |
0.01 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
BAHAN |
|
|
|
|
|
|
|
1.20 |
m3 |
Pasir Urug |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
III |
A.3.2.1. |
|
|
|
HARGA SATUAN PEKERJAAN PONDASI |
|
|
|
|
|
|
|
Overhead & Profit |
|
|
|
|
1 |
A.3.2.1.3. |
|
1 |
m3 |
Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP |
|
|
|
|
|
|
|
|
OH |
Tukang Batu |
|
|
|
|
|
|
L.01 |
1.5 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.750 |
OH |
Tukang Batu |
|
|
|
|
|
|
L.03 |
0.075 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.075 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
BAHAN |
|
|
|
|
|
|
|
1.2 |
m3 |
Batu belah |
|
|
|
|
|
|
|
136 |
Kg |
Semen Portlan |
|
|
|
|
|
|
|
0.54 |
m3 |
Pasir Pasang |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
A.3.2.1.9 |
|
1 |
m3 |
Pemasang Batu Kosong/Anstamping |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.78 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.39 |
OH |
Tukang Batu |
|
|
|
|
|
|
L.03 |
0.039 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.039 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1.2 |
m3 |
Batu Blonos |
|
|
|
|
|
|
|
0.432 |
m3 |
Pasir Urug |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A+B+C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
IV |
A.4.4.1 |
|
|
|
HARGA SATUAN PEKERJAAN PASANGAN DINDING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
A. 4.4.1.10 |
|
1 |
m2 |
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5PP |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.30 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.1 |
OH |
Tukang Batu |
|
|
|
|
|
|
L.03 |
0.01 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.015 |
OH |
Mandor |
|
|
|
|
|
|
|
|
Buah |
Bahan |
|
|
|
|
|
|
|
70 |
Buah |
Bata merah |
|
|
|
|
|
|
|
9.68 |
Kg |
Semen Portlan |
|
|
|
|
|
|
|
0.045 |
m3 |
Pasir Pasang |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
V |
A.4.4.2 |
|
|
|
HARGA SATUAN PEKERJAAN PLESTERAN |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
A.4.4.2.5. |
|
1 |
m2 |
Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.3 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.15 |
OH |
Tukang batu |
|
|
|
|
|
|
L.03 |
0.015 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.015 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
5.184 |
Kg |
Portland Semen |
|
|
|
|
|
|
|
0.026 |
m3 |
Pasir Pasang |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
VI |
A.4.6.1 |
|
|
|
HARGA SATUAN PEKERJAAN KAYU DAN DINDING PEMISAH |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14 |
A.4.6.1.15.3 |
|
1 |
m3 |
Pemasangan konstruksi Gording, Kayu Kampas |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
6.7 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
20.1 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
2.01 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.335 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1.1 |
m3 |
Balok kayu |
|
|
|
|
|
|
|
15 |
Kg |
Besi strip tebal 5 mm |
|
|
|
|
|
|
|
3 |
Kg |
Paku 12 cm |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
A.4.6.1.21 |
|
1 |
m' |
Pemasangan 1 m’ lisplank ukuran (2 x 20) cm, Woodplank |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.1 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.2 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.020 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.005 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1.0000 |
m' |
Woodplank |
|
|
|
|
|
|
|
0.10 |
kg |
Paku Payung |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
10% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
VII |
A.4.1.1 |
|
|
|
HARGA SATUAN PEKERJAAN B E T O N |
|
|
|
|
|
|
|
|
|
Overhead & Profit |
|
10% |
|
|
1 |
A.4.1.1.1 |
|
1 |
m3 |
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87 |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
1.65 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.28 |
OH |
Tukang Batu |
|
|
|
|
|
|
L.03 |
0.03 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.08 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
247 |
Kg |
Portland Semen |
|
|
|
|
|
|
|
869 |
kg |
Pasir Beton |
|
|
|
|
|
|
|
999 |
kg |
Kerikil (maksimum 30 mm) |
|
|
|
|
|
|
|
215 |
ltr |
Air |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
A.4.1.1.5 |
|
1 |
m3 |
Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
1.65 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.275 |
OH |
Tukang Batu |
|
|
|
|
|
|
L.03 |
0.028 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.083 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
326 |
Kg |
Portland Semen |
|
|
|
|
|
|
|
760 |
Kg |
Pasir Beton |
|
|
|
|
|
|
|
1,029 |
Kg |
Kerikil (maksimum 30 mm) |
|
|
|
|
|
|
|
215 |
ltr |
Air |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
A.4.1.1.17 |
|
1 |
Kg |
Pembesian dg Besi Polos atau Besi Ulir |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.0070 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.0070 |
OH |
Tukang Besi |
|
|
|
|
|
|
L.03 |
0.0007 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.0004 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1.050 |
Kg |
Besi Beton (polos/ulir) |
|
|
|
|
|
|
|
0.015 |
Kg |
Kawat Beton |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
A.4.1.1.20 |
|
1 |
m2 |
Memasang Bekisting untuk Pondasi |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.520 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.260 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.026 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.026 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
0.040 |
m3 |
Kayu kelas III |
|
|
|
|
|
|
|
0.300 |
Kg |
Paku 5 – 10 cm |
|
|
|
|
|
|
|
0.100 |
Ltr |
Minyak bekisting |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
A.4.1.1.21 |
|
1 |
m2 |
Pemasangan 1 m2 bekisting untuk sloof |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.520 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.260 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.026 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.026 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
0.045 |
m3 |
Kayu kelas III |
|
|
|
|
|
|
|
0.300 |
Kg |
Paku 5 cm – 10 cm |
|
|
|
|
|
|
|
0.100 |
Ltr |
Minyak bekisting |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11 |
A.4.1.1.22 |
|
1 |
m2 |
Pemasangan 1 m2 bekisting untuk kolom |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.660 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.330 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.033 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.033 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
0.040 |
m3 |
Kayu Klas III (Terentang) |
|
|
|
|
|
|
|
0.400 |
Kg |
Paku Biasa 2" - 5" |
|
|
|
|
|
|
|
0.200 |
Ltr |
Minyak Bekisting |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
A.4.1.1.23 |
|
1 |
m2 |
Pemasangan 1 m2 bekisting untuk balok |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.660 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.330 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.033 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.033 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
0.040 |
m3 |
Kayu kelas III |
|
|
|
|
|
|
|
0.400 |
kg |
Paku 5 cm – 12 cm |
|
|
|
|
|
|
|
0.200 |
Liter |
Minyak bekisting |
|
|
|
|
|
|
|
0.018 |
m3 |
Balok kayu kelas III |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14 |
A.4.1.1.24 |
|
1 |
m2 |
Pemasangan 1 m2 bekisting untuk Lantai Dak |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.66 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.33 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.033 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.033 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
0.0 |
m3 |
Kayu kelas III |
|
|
|
|
|
|
|
0.4 |
kg |
Paku 5 cm – 12 cm |
|
|
|
|
|
|
|
0.200 |
Liter |
Minyak bekisting |
|
|
|
|
|
|
|
0.015 |
m3 |
Balok kayu kelas II |
|
|
|
|
|
|
|
0.35 |
Lbr |
Triplek 4mm |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
VIII |
A.4.5.2 |
|
|
|
HARGA SATUAN PEKERJAAN PENUTUP ATAP |
|
|
|
|
|
|
|
|
|
0 |
|
|
|
|
7 |
A.4.5.2.11. |
|
1 |
m2 |
Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.14 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.07 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.007 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.007 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
0.8 |
Lbr |
Asbes gel 92x250 |
|
|
|
|
|
|
|
0.12 |
Kg |
Paku pancing 6x23 |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A+B+C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
10% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14 |
A.4.5.2.39 |
|
1 |
m' |
Pemasangan Atap Nok Seng |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.15 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.07 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.007 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.006 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
0.3 |
Lbr |
Seng plat 3”x6”bjls28 |
|
|
|
|
|
|
|
0.04 |
Kg |
Paku biasa ½”-1” |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A+B+C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
IX |
A.4.5.1 |
|
|
|
HARGA SATUAN PEKERJAAN LANGIT-LANGIT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
A.4.5.1.7.2 |
|
1 |
m2 |
Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.100 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.050 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.005 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.005 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
0.364 |
Lbr |
Gypsum Board |
|
|
|
|
|
|
|
12.00 |
bh |
Paku Sekrup |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
10% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
X |
A.5.1.1 |
|
|
|
HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG |
|
|
|
|
|
|
|
|
|
Overhead & Profit (contoh 10%) |
|
|
|
|
15 |
A.5.1.1.21 |
|
1 |
m' |
Pemasangan Pipa Galvanis Ø 1" |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.054 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.090 |
OH |
Tukang Batu |
|
|
|
|
|
|
L.03 |
0.009 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.027 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1.20 |
m' |
Pipa Galvanis Ø 1" |
|
|
|
|
|
|
|
0.35 |
Ls |
Perlengkapan 35% x pipa |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
16 |
A.5.1.1.22 |
|
1 |
m' |
Pemasangan Pipa Galvanis Ø 1½ " |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.108 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.180 |
OH |
Tukang Batu |
|
|
|
|
|
|
L.03 |
0.018 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.005 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1.20 |
m' |
Pipa Galvanis Ø 1½" |
|
|
|
|
|
|
|
0.35 |
Ls |
Perlengkapan 35% x pipa |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
17 |
A.5.1.1.23 |
|
1 |
m' |
Pemasangan Pipa Galvanis Ø 3" |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.135 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.225 |
OH |
Tukang Batu |
|
|
|
|
|
|
L.03 |
0.023 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.007 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1.20 |
m' |
Pipa Galvanis Ø 3" |
|
|
|
|
|
|
|
0.35 |
Ls |
Perlengkapan 35% x pipa |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0.075% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
24 |
A.5.1.1.31 |
|
1 |
m' |
Pemasangan Pipa PVC tipe AW Ø 3" |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.081 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.135 |
OH |
Tukang Batu |
|
|
|
|
|
|
L.03 |
0.0135 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.004 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1.20 |
m' |
Pipa PVC Ø 3" |
|
|
|
|
|
|
|
0.35 |
Ls |
Perlengkapan 35% x pipa |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
10% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
32 |
A.5.1.1 35. |
|
1 |
m' |
Pemasangan Pipa Beton Ø 30 cm |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.140 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.070 |
OH |
Tukang Batu |
|
|
|
|
|
|
L.03 |
0.0070 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.007 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1.000 |
Bh |
Saluran Buis U-30 |
|
|
|
|
|
|
|
0.600 |
m2 |
Bata merah |
|
|
|
|
|
|
|
3.920 |
Kg |
Semen portlan |
|
|
|
|
|
|
|
0.056 |
M3 |
Pasir pasang |
|
|
|
|
|
|
|
0.024 |
M3 |
Pasir urug |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Overhead & Profit |
|
|
|
|
|
|
|
|
E |
Harga Satuan Pekerjaan (D+E) |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
X |
A.4.2.1 |
|
|
|
HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
A.4.2.1.11.1 |
|
1 |
m' |
Pemasangan Kusen Pintu/jendela Allumunium polos |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.043 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.043 |
OH |
Tukang Besi |
|
|
|
|
|
|
L.03 |
0.0043 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.0021 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1.1 |
m' |
Profil Allumunium |
|
|
|
|
|
|
|
2 |
buah |
Skrup Fixer |
|
|
|
|
|
|
|
0.06 |
Tube |
Sealant |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
A.4.2.1.13.1 |
|
1 |
m2 |
Pemasangan Pintu / jendela Kaca Rangka Allumunium polos |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.085 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.085 |
OH |
Tukang Besi |
|
|
|
|
|
|
L.03 |
0.009 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.005 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
4.4 |
m' |
Pintu/jendela Allumunium |
|
|
|
|
|
|
|
4.5 |
m' |
Profil Kaca |
|
|
|
|
|
|
|
0.27 |
tube |
Sealant |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
A.4.2.1.21. |
|
1 |
m2 |
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.18 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.35 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.035 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.018 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
4.00 |
m' |
Rangka metal hollow 40.40.2 mm |
|
|
|
|
|
|
|
0.4 |
m' |
Assesoris (perkuatan, las dll) |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
PERALATAN |
|
|
|
|
|
|
|
|
E |
Jumlah A + B + C |
|
5% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
XI |
A.4.6.2 |
|
|
|
HARGA SATUAN PEKERJAAN KUNCI dan KACA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
A.4.6.2.2 |
|
1 |
Buah |
Pemasangan Kunci Tanam Biasa |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.01 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.5 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.01 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.005 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1 |
Buah |
Kunci Tanam Biasa |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
Overhead & Profit |
|
|
|
|
2 |
A.4.6.2.5 |
|
1 |
Buah |
Pemasangan Engsel Pintu |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.015 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.15 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.015 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.001 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1 |
Buah |
Engsel pintu |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0.0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
A.4.6.2.6 |
|
1 |
Buah |
Pemasangan Engsel Jendela Kupu-kupu |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.01 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.1 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.01 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.001 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1 |
Buah |
Engsel Jendela |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0.0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
A.4.6.2.9 |
|
1 |
Buah |
Pemasangan Kait Angin |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.015 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.15 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.015 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.008 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1 |
Buah |
Kait Angin |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0.0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
A.4.6.2.11 |
|
1 |
Buah |
Pemasangan 1 buah grendel |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.02 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.2 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.02 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.001 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1 |
Buah |
Grendel |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0.0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
A.4.6.2.17 |
|
1 |
m2 |
Pemasangan Kaca tebal 5 mm |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.015 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.15 |
OH |
Tukang Kayu |
|
|
|
|
|
|
L.03 |
0.015 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.00100 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
1.1 |
m2 |
Kaca tebal 5 mm |
|
|
|
|
|
|
|
0.1 |
Kg |
SEalant |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0.0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
XII |
A.4.4.3 |
|
|
|
HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
A.4.4.3.34 |
|
1 |
m2 |
Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.70 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.35 |
OH |
Tukang Batu |
|
|
|
|
|
|
L.03 |
0.035 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.035 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
6 |
Buah |
Ubin keramik |
|
|
|
|
|
|
|
10.000 |
Kg |
Semen Portland |
|
|
|
|
|
|
|
0.045 |
m3 |
Pasir pasang |
|
|
|
|
|
|
|
1.500 |
Kg |
Semen warna |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
10% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
XII |
A.4.7.1 |
|
|
|
HARGA SATUAN PEKERJAAN PENGECATAN |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
A.4.7.1.4.1 |
|
1 |
m2 |
Pengecatan Bidang Kayu lama Kw A |
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.070 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.009 |
OH |
Tukang Cat |
|
|
|
|
|
|
L.03 |
0.006 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.003 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
0.2000 |
Kg |
Cat menie |
|
|
|
|
|
|
|
0.1500 |
Kg |
Plamir |
|
|
|
|
|
|
|
0.1700 |
Kg |
Cat Dasar |
|
|
|
|
|
|
|
0.2600 |
Kg |
Cat Penutup |
|
|
|
|
|
|
|
0.0100 |
Bh |
Kuas |
|
|
|
|
|
|
|
0.0300 |
Kg |
Pengencer |
|
|
|
|
|
|
|
0.2000 |
Lbr |
Amplas |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A+B+C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
A.4.7.1.9. |
|
1 |
m2 |
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar,2 lap. Cat Penutup) Kw A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.02 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.063 |
OH |
Tukang Cat |
|
|
|
|
|
|
L.03 |
0.0063 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.0030 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
0.1 |
Kg |
Plamuur |
|
|
|
|
|
|
|
0.1 |
Kg |
Cat dasar |
|
|
|
|
|
|
|
0.26 |
Kg |
Cat penutup |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
A.4.7.1.10. |
|
1 |
m2 |
Pengecatan 1 m2 tembok baru Interior ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A |
Tenaga |
|
|
|
|
|
|
L.01 |
0.02 |
OH |
Pekerja |
|
|
|
|
|
|
L.02 |
0.063 |
OH |
Tukang Cat |
|
|
|
|
|
|
L.03 |
0.0063 |
OH |
Kepala Tukang |
|
|
|
|
|
|
L.04 |
0.0030 |
OH |
Mandor |
|
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
|
0.1 |
Kg |
Plamuur |
|
|
|
|
|
|
|
0.1 |
Kg |
Cat dasar |
|
|
|
|
|
|
|
0.26 |
Kg |
Cat penutup |
|
|
|
|
|
|
|
|
C |
PERALATAN |
|
|
|
|
|
|
|
|
D |
Jumlah A + B + C |
|
|
|
|
|
|
|
|
E |
Overhead & Profit |
|
0.0% |
|
|
|
|
|
|
F |
Harga Satuan Pekerjaan (D+E) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|