180x Filetype XLSX File size 0.14 MB Source: www.xoserve.com
Sheet 1: Issues
Customer Issue ID | Status | Incident No. | Incident Priority (P1 or P2) | Defect No. | CR Reference | Comms Reference | Issue Title | Customer Impact | Issue Description | Primary Process Impacted | Customer Segments Impacted | Cause | Date Detected | Planned Issue Resolution Date | Resolution RAG Status | Resolution/Deployment date |
1 | Closed | N/A | N/A | N/A | Mod 0658 / XRN4695 | Levels & volatility of Unidentified Gas (UIG) | Unpredictable UIG gas nominations & gas allocations | Levels & volatilty with UIG between D-5 of the gas day to GFD+5 and beyond D+5 close-out in extended reconciliation periods which create the need for Shippers to account for UIG until eventually reconciled. |
UIG | All Shippers | Various: Incorrect DM reads used to calculate energy, estimated DM reads to calculate energy, issues with data that feeds UIG (CVs, weather data). | 6/1/2017 | N/A | Closed | Link to latest update on Xoserve.com: https://www.xoserve.com/media/7581/uig-task-force-update-14th-november.pdf | |
2 | Open | N/A | N/A | Multiple | N/A | Amendment Invoice supporting information (AML & ASP files) | Incorrect reconciliation charges and unable to validate the invoice due to mismatches on the supporting information files Cash flow for Distribution Networks |
A number of functional defects and integration issues are causing presentation and charge calculation issues within the AMS invoice. | Invoice - Amendment | Shippers & Networks | Various: system functionality, manual workarounds. Defects raised. | 7/1/2017 | Ongoing until defects & exceptions are manageable | Backlog of SSP Exceptions & 3 exceptions where we do not have a plan for resolution | Latest updates provided on Xoserve.com: https://www.xoserve.com/services/issue-management/amendment-invoice/ and on Joint Office under Contract Management Committee (CoMC) meetings: https://www.gasgovernance.co.uk/DSC-Contract |
|
3 | Closed | N/A | Network Reports - providing aggregate AQ, SOQ & CSEP portfolio information (BOPRI & SCH606) | The BOPRI & SCH606 reports are issued to DNs monthly (BOPRI on 28th & SCH606 on the 1st). There have been issues with both reports including the December report which DNs use to set their transportation rates for the 12 months commencing 1st April. BOPRI shows all 'rolling' AQs, SCH606 all CSEP SOQs. Updated reports issued on the 11th January however, due to the difference in the reports Networks were not confident with the reports issued in January. |
Reporting | DN's | 11/12/2017 | Closed | ||||||||
4 | Closed | 807068 | N/A | 1491 |
N/A | Data issues relating to transfer of ownership process | Incorrect data submitted to Shippers on the transfer of ownership notification / response files. Defect 1491: Incorrect rejection code issued in the Confirmation response file |
1491: CNF00003 rejection code has been decommissioned as part of Nexus but the CFR file is being issued in error when the Offer is not in correct status. OFF00016 rejection code should be send in place of CNF00003 |
Transfer of Ownership | Shippers & Networks | TBC | Nov-19 | Nov-20 | Closed | Defect 1491/60983: Deployed 13th November 2020 |
|
5 | Closed | 950723 | P2 | N/A | N/A | Daily Read file (.MDR) not issued before 14:00 hrs. | Delay in submitting the daily reads file to Shippers (.MDR) file for Class 1 meter points. | Read process | All Shippers | Issue caused due to defect deployment performed affecting daily reads process. | 19/01/2018 | Closed | ||||
6 | Closed | N/A | Missing Read files where the meter exchange takes place on same date as transfer date | Transfer read files are not issued to the Shipper where there has been a meter exchange on the same day as a shipper transfer | Read process | All Shippers | 12/02/2018 | Closed | ||||||||
7 | Closed | N/A | N/A | N/A | The number of Must Reads has increased significantly | - DNs raised the issue that the value on the invoices that we produce on their behalf to the Shippers has reduced since Nexus. At the same time, the invoices from the MRAs for procuring reads on their behalf has not reduced. - Analysis identified that the technical elements of the process are working correctly. However, there are reasons for the reduced value of the invoice (not all reasons affect all DNs) |
Must Read process | DN's | 01/03/2018 | Closed | ||||||
8 | Closed | N/A | 945 | N/A | Incorrect functionality of a Meter Read validation routine affecting circa 3,000 meter reads | An issue was identified in March following a number of exceptions raised from UK Link. A validation routine in UK Link was creating exceptions in certain scenarios when processing the meter read. It was found that the validation job was incorrect. On the 9th March 2018 the validation was stopped. Analysis has identified that 3,652 MPRNs have been affected. |
Read process | All Shippers | 20/03/2018 | Closed | ||||||
9 | Closed | N/A | N/A | XRN4671 | Energy for Class 2 sites incorrect in Gemini where a read replacement is received or a consumption adjustment within GFD+5. | Energy mismatch in Gemini where a read is replaced with a read or a consumption adjustment for Class 2 sites as the energy calculated is not being sent to Gemini correctly. | Read process | All Shippers | 01/04/2018 | Closed | ||||||
10 | Closed | 843169 (Problem ID 1636) | P2 | N/A | N/A | Issues with the Allocation run in Gemini affecting UIG | Issue encountered with the first run of Energy Allocation for Gas Day 2nd & 6th May 2018. NDM Allocation failed to calculate for this gas day, for all LDZs, This was corrected within the day. | Gas Allocation processes | All Shippers | The cause of this issue is due to a code fault | 03/05/2018 | Closed | ||||
11 | Closed | N/A | 969 | N/A | Incorrect AQ/SOQ values issued in transfer of ownership files | At D-2 the TRF (transfer of ownership file) is issued to the Shipper and provides the values that will be effective on the transfer effective date, including AQ and SOQ values. Due to a code change for a defect deployed on September 27th 2017, incorrect Rolling SOQ data has been sent for all Class 3 and 4 sites transferring ownership, equating to 1.75 million Meter Points with incorrect SMP rolling SOQ values. The rolling SOQ being issued is the value as at EUC effective date (either 1st October or 1st of the month if a rolling AQ change has taken place).The transportation rates sent in the same file are correct. | AQ process | All Shippers | 15/05/2018 | Closed | ||||||
12 | Closed | 848559 | P2 | N/A | N/A | Gas Nominations batch job failure affecting UIG | Unidentified Gas nominations batch job failure within Gemini at approximately 11:00 on 17th May. Issue repeated on 21st May. All shippers with active Unidentified Gas meters in Gemini would have had a blank value within the Gemini demand screen for the next gas day nominations. Between 11:00 and 14:20 no forecasting figures shown |
Gas Nomination processes | All Shippers | TBC | 17/05/2018 | Closed | ||||
13 | Closed | 858471 979484 |
N/A | 1313 1050 |
N/A | Incorrect charges relating to Capacity | 1. Duplicate adjustments in UK Link are not crediting back all charge types to the Shipper correctly. In certain scenarios, Shippers are receiving multiple refunds for Capacity Charges only 3. In a number of instances, where there has been a ratchet SOQ charge applied, they have either been incorrectly billed or have missing bill documents |
Invoice - Capacity | Shippers & Networks | TBC | 01/06/2018 | April 2019 | Closed | Defect 1050 deployed on 05/04/2019 Issue closed as Defect 1313 is now being monitored under the AML Taskforce. Please refer to https://www.xoserve.com/services/issue-management/amendment-invoice/ for updates |
||
14 | Closed | 843903 | P2 | N/A | N/A | Workflow did not complete in SAP potentially resulting in incorrect data held in UKLink & Gemini | Workflow did not complete for 4,000 meter points resulting in potential incorrect data being held in UKLink & SAP affecting gas nominations, allocations, DEs & invoicing. May also impact read estimation & read processing. | Gas Nomination processes | All Shippers | Fix deployed at the weekend affected the process. | 04/06/2018 | Closed | ||||
15 | Closed | P2 | Incorrect file loaded into Gemini affecting Allocations in Gemini & UIG | Issued experienced on 5th & 6th June due to incorrect file loaded for 5th June, delay with processing the file caused issues with allocation run on the 6th June. This was corrected within the day. Delayed publication of the UIG data for the 5th of June has meant that customers would have seen their UIG screens showing a blank value until the UIG job (as part of the Allocation Suite) had completed. |
Gas Nomination & Allocation processes | All Shippers | This was due to a system issue by Aggregator systems experiencing a technical issue when transferring the file between systems. | 05/06/2018 | Closed | |||||||
16 | Closed | 856558 (Problem ID 1708) | P2 | N/A | N/A | Incorrect demand forecast received affecting Gas Nominations & UIG | Separate issue affecting UIG for Gas Nominations on 8th June due to incorrect demand forecast received. All shippers with active Unidentified Gas meters in Gemini would have had a blank value within the Gemini demand screen for the next gas day nominations. Between 11:00 and 14:20 no forecasting figures shown |
Gas Nomination processes | All Shippers | June issue caused by an incorrect demand forecast had been sent to Gemini . | 08/06/2018 | Closed | ||||
17 | Closed | 856162 (Problem ID 1713) | P2 | N/A | N/A | Issues with the Allocation run in Gemini affecting UIG | Issue identified on the 15th June. The UIG values are very high for LDZs NW, NO, WM for Gas Day 13/06/2018 | Gas Allocation processes | All Shippers | This is due to low Daily Metered (DM) values being used as part of the UIG calculation within the allocation suite job. | 15/06/2018 | Closed | ||||
19 | Closed | N/A | 1022 | Read issued in the Transfer of Ownership files (TRF) | At transfer of ownership the TRF file is issued on D-2 of the Confirmation effective date confirming the effective date of the Confirmation. The MRI file is also issued which contains asset information. The ‘Last Actual Read’ recorded on UKLink is submitted in both the TRF file (S15) and the MRI file however the read in the MRI is not the correct read. Defect 1022 raised. This has been since 01/06/2017. | SPA - Transfer of Ownership | All Shippers | 28/06/2018 | Closed | |||||||
20 | Closed | 865213 | P2 | N/A | N/A | Line Pack not published | A Control Room User raised a ticket as Line Pack had not been published for 00:00 hour bar. | Gemini processes | GTs | Gemini Application Support began investigating and found that Gemini had received two Line Pack files at 23:00; this meant that the 23:00 hour bar loaded successfully with the first file but the second file got stuck in processing. The batch job was triggered and the 00:00 hour bar Line Pack file was published successfully. | 02/07/2018 | Closed | ||||
21 | Closed | P2 | N/A | N/A | Data Enquiry Service is at D-2 | There has been a delay in completing the daily data load for the Data Enquiry Service (DES). As a result the system is displaying data for 2nd July 2018 but data for 3rd July 2018 is not visible. The data for 3rd July 2018 is currently being loaded which means users may be experiencing slow performance on some of the screens |
Data Enquiry System (DES) | All Shippers | Service review or Portal, Offline services & Data Enquiry Service being carried out June 2019. | 04/07/2018 | Closed | |||||
22 | Closed | P2 | N/A | N/A | Technical issue with Data Search telephone service | technical issue with our Data Search telephone service, 0121 713 4901 and Contact Management Helpline, 0121 713 4903 | Helpline | All Customers | TBC | 12/07/2018 | Closed | |||||
23 | Closed | N/A | DPS file sequencing | DPS files issued to Shippers have not followed the sequence of the last release (e.g. .PN002332.DPS’ to .PN002354.DPS’ ) | SPA - files | All Shippers | 12/07/2018 | Closed | ||||||||
24 | Closed | 873558 | P2 | N/A | N/A | UIG not visible in Gemini | Shippers and GNCC are unable to view the UIG Nominations balance for 15th and 16th Gas day & UIG allocations for 14th | UIG | All Shippers | A column in one of the table has size 8 digits which is causing the UIG job failures. Database have restructured the table column size from 8 to 10 in the production environment | 16/07/2018 | Closed | ||||
25 | Closed | 874837 | P2 | N/A | N/A | UIG mismatch in Gemini | Mismatch due to the UIG allocation job took time to complete for the gas day (11th ,12th,13th,14th,15th) which delayed the process. | UIG | All Shippers | Job overrun due to defect 873558 | 20/07/2018 | Closed | ||||
26 | Closed | N/A | DM Reports | DM reports issued to Shippers were incorrect for 30/06/2018 to 06/07/2018 | Reporting | All Shippers | 20/07/2018 | Closed | ||||||||
27 | Closed | N/A | 999 | Incorrect FYAQ values issued in transfer of ownership files (TRF). | At D-2 the TRF (transfer of ownership file) is issued to the Shipper and provides the values that will be effective on the transfer effective date, including FYAQ and FYSOQ values. Incorrect FYSOQ data has been sent for all Class 3 and 4 sites transferring ownership, | SPA - Transfer of Ownership | All Shippers | 25/07/2018 | Closed | |||||||
28 | Closed | N/A | UIG Rec Invoice includes kWh for SSP pre go live | The kWh presented in the supporting information is not as expected as it includes the kWh associated to SSP reconciliation pre go-live (which has no financial value). However this does not impact the invoice value as the smear is based on the monetary value (GRE) and we do not re-value the reconciliation using SAP and kWh. | Invoice - Amendment | All Shippers | 27/07/2018 | Closed | ||||||||
29 | Closed | N/A | N/A | N/A | Delay is publishing the Performance Assurance Report Register (PARR) reporting | The publication of the Performance Assurance Report Register (PARR) reporting for August 2018 will be delayed and will not be published on Monday 30 July 2018 as expected. | Reporting | All Shippers | 27/07/2018 | Closed | ||||||
30 | Closed | 884278 | P2 | N/A | N/A | Gemini-Demand Attribution not published for 10th hour bar | P2 raised at 10:30. Shippers unable to place gas nominations. | Gas Nomination processes | All Shippers | Scheduling team have identified that the demand attribution jobs were on hold | 29/07/2018 | Closed | ||||
31 | Closed | 886370 | P2 | N/A | N/A | IX - Unable to connect to multiple shipper sites | AML file delivery to 3 shippers impacted. | IX | All Shippers | IX team have updated that the connectivity issue is due to huge file transfer (400MB files); | 05/08/2018 | Closed | ||||
32 | Closed | 888227 | P2 | N/A | N/A | UIG Allocations | The Unidentified Gas (UIG) batch job failed to complete in Gemini yesterday evening (August 8th). This has affected the following: The UIG allocation values for Gas Days 3rd to 6th August were not updated and are out of date for all LDZs. The UIG allocation values for Gas Day 7th August were not calculated and appear as zero for all LDZs for all Shippers | UIG | All Shippers | This was due to the allocation suite overrunning on 8th August hitting the maintenance window. | 09/08/2018 | Closed | ||||
33 | Closed | 888227 | P2 | N/A | N/A | UIG Allocations | The Unidentified Gas (UIG) batch job failed to complete in Gemini yesterday evening (August 9th). This has affected the following: The UIG allocation values for Gas Days 4th to 7th August were not updated and are out of date for all LDZs. The UIG allocation values for Gas Day 8th August were not calculated and appear as zero for all LDZs for all Shippers This is linked to 888227 |
UIG | All Shippers | This was due to the allocation suite overrunning on 9th August hitting the maintenance window. | 10/08/2018 | Closed | ||||
34 | Closed | 888227 | P2 | N/A | N/A | UIG Allocations | The Unidentified Gas (UIG) batch job failed to complete in Gemini yesterday evening (August 12th). This has affected the following: The UIG allocation values for Gas Days 4th to 7th August were not updated and are out of date for all LDZs. The UIG allocation values for Gas Day 11th August were not calculated and appear as zero for all LDZs for all Shippers This is linked to 888227 |
UIG | All Shippers | This was due to the allocation suite overrunning on 11th August hitting the maintenance window. | 13/08/2018 | Closed | ||||
35 | Closed | 971341 | N/A | 1107 | N/A | MUR response not sent for Prime sites | For Prime sites (Class 2 & 3) Must Read responses are not being sent to Shippers in CMS | CMS | Shippers & Networks | TBC | 8/24/2018 | 4/5/2019 | Closed | Defect deployed on 05/04/2019 | ||
36 | Closed | 893054 | P2 | N/A | N/A | Amendment Invoice | The UGR charge in the Amendment Invoice is incorrect. The total national Unidentified Gas reconciliation value is correct, but the allocation to individual Shippers is incorrect. | Invoice - Amendment | All Shippers | Manual error in the brought forward Shipper throughput values for market shares of UIG reconciliation allocation from the previous month | 24/08/2018 | Closed | ||||
37 | Open | 983387 | N/A | Incorrect AQ and / or Formula Year AQ (FYAQ) calculated | Please refer to the Open AQ Issues tab within this spreadsheet. | Please refer to the Open AQ Issues tab within this spreadsheet. | AQ - Incorrect value | Shippers & Networks | Various | 9/1/2018 | Ongoing until defects are manageable | Defect deployment dates delayed | Plan to fix all outstanding defects, complete data corrections and AQ calculations in place and published on second 'Open AQ Issues' tab. Updates on Joint Office under Contract Management Committee (CoMC) meetings: https://www.gasgovernance.co.uk/DSC-Contract |
|||
38 | Closed | 896574 | P2 | N/A | N/A | IX file transfer service unavailable | Inbound and outbound file flow for Shippers impacted | IX | All Shippers | TBC | 05/09/2018 | Closed | ||||
39 | Closed | N/A | Estimated Transfer of Ownership Read Failure | Estimated Read not issued in MBR file following Transfer of Ownership . The two days affected were 15/06/2018 and 30/06/2018 and applied to 78 MPRN's (12 Shippers) | SPA - Transfer of Ownership | All Shippers | 07/09/2018 | Closed | ||||||||
40 | Closed | N/A | 1150 | Supplier details missing in the transfer of ownership (TRF) file | Issue with the Transfer of Ownership process where there is no asset on UK Link, the incoming Shipper has not received and will continue not to receive previous Supplier details in the TRF file (S75 file record). | SPA - Transfer of Ownership | All Shippers | 07/09/2018 | Closed | |||||||
41 | Closed | 899761 | P2 | N/A | N/A | Gemini - Demand Attribution Failed for 16:00hrs | Demand did publish for 16:00 hrs. Latest NDM nomination and UIG nomination will not be visible on the screen, this will impact shipper's gas buying decision |
Gas Nomination processes | All Shippers | Demand Attribution failed for 16:00 hrs. | 14/09/2018 | Closed | ||||
42 | Closed | N/A | 1162 | .UPI (User Pays Index) File not incrementing when new file is issued | The August User Pays Index (UPI) file was issued with the same file name as the July a file name, e.g. PN00000X5. | Files | All Shippers | 01/10/2018 | Closed | |||||||
43 | Closed | N/A | N/A | Domestic M Number Helpline Incorrect Data | Since March the Domestic M Number Helpline service has not been providing accurate data in all cases | Helpline | All Customers | 01/10/2018 | Closed | |||||||
44 | Closed | N/A | 1172 | Class 1 or 2 Sites populating Incorrect Run ID as SSP instead of LSP | Class 1 & 2 meter points are being assigned as 'SSP' instead of 'LSP' on the Amendment invoice supporting information files. | Invoice - Amendment | All Shippers | 02/10/2018 | 08/02/2019 | Closed | ||||||
45 | Closed | 907330 | P2 | N/A | N/A | Data Enquiry Service currently unavailable | When trying to access the data enquiry portal, the system is timing out and not allowing users to access the portal | Data Enquiry System (DES) | All Customers | Service review or Portal, Offline services & Data Enquiry Service being carried out June 2019. | 04/10/2018 | Closed | ||||
46 | Closed | 911178 / 918851 | P2 | N/A | N/A | Delay in issuing some of the CFR files on 8th October | Small number of Confirmation response files not submitted to Shippers. 14 Shippers affected. | SPA - Transfer of Ownership | All Shippers | Files failed to process in AMT Marketflow. | 08/10/2018 | Closed | ||||
47 | Closed | 911345 | P2 | N/A | N/A | Delay in issuing some of the CFR files on Thursday 4th October | Incoming Shipper - For impacted Shippers, a response to their confirmation request was not sent within two Supply Point Systems business days. Outgoing Shipper - For impacted Shippers, withdrawal notifications and confirmation cancellation notifications were also delayed. |
SPA - Transfer of Ownership | All Shippers | TBC | 09/10/2018 | Closed | ||||
48 | Closed | 911345 | P2 | N/A | N/A | Multiple confirmation responses in the Confirmation Response File (CFR) for the same confirmation request sent on 4th October. | Incoming Shipper - For impacted shippers, multiple confirmation reference numbers were issued for the same confirmation request. This means you have received two unique confirmation responses for the same transaction (meter point), one of which will be invalid. Outgoing Shipper - For impacted shippers, you have received two withdrawal notifications for your own confirmation. |
SPA - Transfer of Ownership | All Shippers | TBC | 09/10/2018 | Closed | ||||
49 | Closed | N/A | 1179 | Class change from incumbent Shipper issue | Where a class change request is received from an incumbent shipper, there is currently no rejection which is causing AQ mismatch between UKLink and Gemini. Confirmed this is not an issue. |
SPA - Class change | All Shippers | 10/10/2018 | Closed | |||||||
50 | Closed | N/A | 1188 | Incorrect rejection for Interconnector request (RCI file) | Request to register on the Interconnector is rejecting incorrectly stating Contact Job Details not provided (CTT00012) even though the Contact Job Title has been provided in the file | SPA - Supply Point Updates | All Shippers | 12/10/2018 | Closed | |||||||
51 | Closed | N/A | 1191 | Connection max AQ & SOQ incorrect in the Q44 record for iGT sites | Connection max AQ and SOQ values are incorrect in Q44 segment for the MPRNs that belong to CSEPs which are part of a nested configuration. This should have values for the parent CSEP, currently child CSEP AQ and SOQ values provided in this field. |
AQ process | All Shippers | 12/10/2018 | 11/01/2019 | Closed | ||||||
52 | Closed | N/A | 1190 | Formual Year SOQ not provided in TRF File | Formula year SOQ value not provided for the TRF flows where confirmation effective date is 02nd Oct 2018. | AQ process | Shippers & Networks | 12/10/2018 | 29/01/2019 | Closed | ||||||
53 | Closed | 907423 | P2 | N/A | N/A | 43 files not processed in Marketflow, files stuck in Marketflow due to database issue, affected 15 Shippers. | 43 files submitted on the 4th October were not processed. Files affected: Supply Point update files, RGMA files and Class 3 & 4 read files. | SPA - multiple processes | All Shippers | TBC | 22/10/2018 | Closed | ||||
54 | Closed | N/A | UIG share & charges incorrect for since October 2017. | The UIG share & charges since October 2017 have been issued on the Amendment invoice incorrectly. This is due to the wrong UIG weighting factors being applied to two End User Category (EUC) bands. | UIG Adjustments | All Shippers | Incorrect weighting factors were uploaded into UKLink tables and seperately the UIG share was triggered before activities carried out by IS Ops were completed.; | 26/10/2018 | Closed | Original plan to deliver adjustments by 22/12/18. Final adjustments issued 02/04/19 | ||||||
55 | Closed | 923446 | P2 | N/A | N/A | Two Confirmation files not processed. | Manual processing required to following a connectivity issue on 28th October. Two files were missed. | SPA - Transfer of Ownership | All Shippers | Manual error, 2 files were overlooked and not processed until Shipper raised a query. | 28/10/2018 | Closed | ||||
56 | Closed | 922156 | P2 | N/A | N/A | Gemini - Hourly capacity data is not published for IP auction | Gemini hourly capacity data not published for IP auctions from 23:00 on 28/10/28 to 04:00. on 29/10/18. | Gemini processes | GTs | An outage from 16:00 till 23:00 affected Gemini as files were not received. Team have restarted the auctions and Gemini received the hourly auction data for 04 hour bar at 23:32. | 28/10/2018 | Closed | ||||
57 | Closed | 922161 | P2 | N/A | N/A | EU nominations placed by the shippers will not be confirmed until we receive files from BBL and IUK TSOs | EU nominations placed by the shippers were confirmed late as we received the acknowledgement files late in Gemini. | Gemini processes | GTs | Gemini support team identified the files are stuck in system, service restarted to process the files. | 29/10/2018 | Closed | ||||
58 | Closed | 927554 | N/A | 1280 1236 |
N/A | Issues relating to processing of daily metered reads and read notification files | For class 1 meter points, daily read information incorrect in the notification read files and Site Visit information recorded against the wrong meter for Twinstream sites. Low volume of MPRNs affected |
1280: Where a better estimate read is calculated and sent to Shippers/ DMSP, the read fields within the Daily Data Logger Readings (MDR) and DMSP Readings (DDR) file are being populated with incorrect data 1236: Where a DMSP inputs a site visit read for a Twin Stream Site via Portal, the read is being recorded against the incorrect Meter Serial Number than the one being selected |
Read process | Shippers & Networks | TBC | 15/11/2018 | Jun-2019 | Closed | Defect 1280: Deployed on 10th May 2019 Defect 1236: Deployed on 21st June 2019. |
|
59 | Closed | 966533 | N/A | 1164 1205 1193 1319 1325 1398 1421 1485 |
N/A | Incorrect Formula Year SOQ & AQ values issued in notification or response files | Incorrect AQ/FYAQ values being issued in multiple notification files to Shippers and Networks. Defect 1325 affects a very small number of supply Points. |
1164: Issue where AQ & NDM SOQ are not getting updated correctly in UKLink and not populated in AQ notification (NRL) file where there is a Class change & AQ correction effective for the same day. Linked to defect 1205 1205:Formula year SOQ value is incorrect in the transfer (TRF) file when a Class change received through CNF and AQ correction goes live for the same effective date. Same issue has also occurred when Class change and EUC change happening on the same date. SOQ values in TRF / CFR and NMR files sent incorrectly 1193: Where a class change from 2 to 4 and effective date for 1st October 2018, EUC values are not being processed correctly where the NDM SOQ is derived Same issue has also occurred when Class change and EUC change happening on the same date. SOQ values in TRF / CFR and NMR files sent incorrectly 1319: Incorrect Formula Year AQ Value has been incorrectly populated in the .NRL file where an AQ correction has taken place between April 2018 - February 2019. 1325: The Monthly NRL file (AQ Notification file) is not being sent to shippers on the the NTS Interconnector notifying them of the change in AQ value as part of the Monthly AQ Roll process. 1398: Incorrect EUC details are being sent out in the NRL file for the WC correction when it is processed on M-2 where M is the effective date. 1421: When a shipper submits AQ Correction file (AQI) the read is incorrectly accepting as the system is not validating the read and read date to ensure it matches 1485: When processing an AQ Correction file (.AQI), the system is calculating energy using Calorific Value (CV) of D-2 when it should use D-1 |
AQ - Notification | Shippers & Networks | TBC | 11/15/2018 | Jan-2020 | Closed | Defect 1164: Deployed 29th March 2019 Defect 1205: Deployed 29th March 2019 Defect 1193: Deployed 29th March 2019 Defect 1319: Deployed 19th April 2019 Defect 1325: Deployed 28th June 2019 Defect 1398: Deployed 11th November 2019 Defect 1421: Deployed 6th September 2019 Defect 1485: Deployed 4th January 2020 |
|
60 | Closed | N/A | Incorrect Read Reason (READ_REASON) sent on the read file (MBR) notifying of an estimated opening read | Following registration of a meter point by a Shipper, if an opening meter reading is not submitted by D+10 of the transfer effective date an estimated read is calculated and issued to both incoming & outgoing Shipper. The read issued to the Incoming Shipper gave 'Read Reason' as 'CYCL', it should be 'OPNT'. This has affected 51, 000 meter points between 24/11/18 and 27/11/18. | Read process | All Shippers | 28/11/2018 | Closed | ||||||||
61 | Closed | 963811 | N/A | 1241 | N/A | Incorrect values in Gemini | Incorrect SOQ value in Gemini for Class 1 meter points. No impact to energy or UIG. No workaround in place, however data correction to be completed once the defect is deployed. |
The Current Year Maximum Supply Offtake Quantity (CYM SOQ) value is not being revised in Gemini when there is a change in the energy value | Gemini processes | Shippers & Networks | TBC | 11/28/2018 | Jun-2019 | Closed | Defect 1241: Deployed on 28th June 2019 | |
62 | Closed | 936152 | P2 | N/A | N/A | Gemini - UIG Nomination Job Overrunning | There has been a delay in publishing the UIG nomination values in Gemini. The 10:00am UIG nomination process is still running. This has caused the 11:00am UIG nominations to not start. |
UIG | All Shippers | The monthly Annual Quantity (AQ) update has overrun due to a large number of records. This has caused a delay to the 10:00am UIG nomination job in Gemini. The AQ job completed at 11:45am but the UIG nomination process is still in progress. The next UIG job was due to start at 11:00am, however this will be put on hold and the nomination job at 1:00pm will be run instead. |
30/11/2018 | Closed | ||||
63 | Closed | 937188 | P2 | N/A | N/A | Users unable to query Data Enquiry Servoce (DES) | Users unable to access DES due to high system utilisation. DES not available from 04:17 to 05:37 | Data Enquiry System (DES) | All Customers | Formula year AQ/SOQ extraction and the monthly NLSP load were running in parallel and causing the high utilisation. Service review or Portal, Offline services & Data Enquiry Service being carried out June 2019. | 03/12/2018 | Closed | ||||
64 | Closed | 938847 | P2 | N/A | N/A | Connectivity issue with NG Metering | Daily reads file (.DLC) not received from DMSP at usual time due to a connectivity issue with the IX. | IX | Shippers & Networks | router fault as the circuit tests showed no issues | 08/12/2018 | Closed | ||||
65 | Closed | N/A | 1247 | Winter Consumption process not using all reads types during calculation | Winter Consumption calculation process in not using all read types to calculate the WC. | Read process | Shippers & Networks | 20/12/2018 | 22/03/2019 | Closed | ||||||
66 | Closed | 945238 | P2 | N/A | N/A | Daily Read file (.MDR) not issued before 14:00 hrs. | Delay in submitting the daily reads file to Shippers (.MDR) file. | Read process | All Shippers | UK Link – AMT Market flow slowness / performance issue | 31/12/2018 | Closed | ||||
67 | Closed | N/A | 1256 Problem ID 1996 | Opening Reads Sent via the U03 file in Error to Previous Shipper | For Class 3 meter points, where a cyclic read is received from the Outgoing Shipper (via the .UBR file), for a read date, which is the same as the registration effective date (transfer date), the system is accepting the read, it should reject the meter reading. The read is being recorded as the Opening read (U03) and is being sent to the Shipper who submitted the read, and to the current Shipper as a Final read (U04) indicator |
Read process | All Shippers | 04/01/2019 | 08/03/2019 | Closed | ||||||
68 | Closed | 947237 | P2 | N/A | N/A | Issue with sending the NTS Exit Capacity Invoice | The NTS Exit Capacity Invoice (.NXC) for the December 2018 billing period failed to send due to the CHARGE_ITEM_REF_NUMBER being 10 digits. Previously it has always been a maximum of 9 digits but due to incrementation it is now 10 digits. This is a mandatory field in the file formats with a numeric field length of 9 digits. | Invoice - NTS Capacity | All Shippers | This is due to the incrementation of the charge item reference number from 9 digits to 10 digits | 07/01/2019 | Closed | ||||
69 | Closed | N/A | 1265 | NDMSOQ Incorrect due to Winter Consumption process | The Winter Consumption calculation process does not create records in the correct table in UK Link, this results in the NDMSOQ value being incorrect for the annual FYAQ calculation. | AQ process | Shippers & Networks | 16/01/2019 | 08/03/2019 | Closed | ||||||
70 | Closed | N/A | 1264 | Incorrect data provided in AQ notification file T98 file record | The monthly AQ Roll process is populating the incorrect EUC number, EUC description and confirmation reference number in the T98 file record of the NRL file (AQ notification) | AQ process | Shippers & Networks | 16/01/2019 | 22/03/2019 | Closed | ||||||
71 | Closed | 888087 | N/A | 1274 | N/A | Class Change requests incorrectly rejecting following Transfer of Ownership | Shipper unable to change Class until after 2 months of taking ownership of the meter point. Does not prevent transfer of ownership. Workaround in place to stop files rejecting however minimal impact - low volumes of Shippers affected |
Shipper Class change requests are incorrectly rejecting where a change of ownership has taken place within 2 months of the previous Class change request | SPA - Class change | All Shippers | TBC | 22/01/2019 | May-2019 | Closed | Defect 1274: Deployed 17th May 2019 | |
72 | Closed | 950723 | P2 | N/A | N/A | Incorrect energy and incorrect estimated daily reads for Class 1 and 2 meter points | Incorrect energy for Class 1 and 2 meter points for Gas Flow Day (GFD) 18th January 2019 and incorrect estimated daily reads for Class 1 and 2 meter points issued in the MDR file for GFD 20th, 21st, 22nd and 23rd January 2019 | Read process | All Shippers | On 18th January 2019 a P2 incident (950723) was raised due to a batch failure which resulted in a delay issuing the daily reads (MDR file) to Shippers. The files were issued at 7:00pm on 19th January when they should have been issued by 2:30pm. Unfortunately, this had a knock on affect to subsequent days; 1. The actual Calorific Value (CV) was not loaded into UK Link on 19th January for GFD 18th January. Therefore the energy calculated used an estimated CV value. 2. Estimated reads, where an actual read was not received/accepted, was not calculated for GFD 19th January and was not loaded into Gemini nor issued to Shippers (via the MDR file). 3. Any estimated reads required for GFDs 20th, 21st, 22nd and 23rd January did not calculate correctly. The energy was correct but the meter reading issued in the file (MDR) was incorrect. |
23/01/2019 | Closed | ||||
74 | Closed | 954337 | P2 | N/A | N/A | Delay in publishing UIG Gas Nominations for 1st Feb. | Delay in publishing the UIG Gas Nominations for 1st Feb | UIG | All Shippers | Gemini: UIG Nomination Day Ahead Batch Job Failed Due to Incorrect Meter ID Entries in file to gemini | 31/01/2019 | Closed | ||||
75 | Closed | 955031 | P2 | N/A | N/A | EU Nominations are not getting confirmed | EU Nominations in Gemini are not getting confirmed affecting 6 Shipper. | Gemini processes | GTs | Service restarted, files started to flow successfully without any issues. | 02/02/2019 | Closed | ||||
76 | Closed | N/A | 1293 | N/A | Incorrect data provided within the Asset Invoice supporting file (MIF) | Issue with the Asset Invoice MIF File (Supporting information file generated as part of the MAS invoice). The K50 file record (Meter Portfolil Detail) is being populated with the incorrect data. | Invoice - Ancillary | All Shippers | TBC | 05/02/2019 | 05/04/2019 | Closed | Deployed on 05/04/2019 | |||
77 | Closed | 959618 | P2 | N/A | N/A | Demand attribution is not published for 17th and 18th gas day | Gas nominations & allocations not published for the 17th & 18th February in Gemini. | Gas Nomination & Allocation processes | All Shippers | TBC | 18/02/2019 | Closed | ||||
78 | Closed | 962629 | P2 | N/A | N/A | CMS Unavailable | CMS - Application unavailable between 12:04 to 13:10. | CMS | All Customers | File Exchange service went down. P3 ticket has been raised for monitoring | 25/02/2019 | Closed | ||||
79 | Closed | 963956 | P2 | N/A | N/A | Gemini application will be unavailable | Unavailability of Gemini from 03:01 to 09:13 meaning Users will not be able to perform any of the business process untill the services are restored. | Gemini processes | Shippers & Networks | P3 ticket (964561) has been raised for monitoring | 27/02/2019 | 27/02/2019 | Closed | |||
80 | Closed | 972030 | P2 | N/A | N/A | No access to Data Enquiry System (DES) | Users unable to access DES, identified on 18/03/19 at 11:10 | Data Enquiry System (DES) | All Customers | Application support team identified a high number of sessions were open which resulted in the outage of the application from 11:10 to 11:35. Service review or Portal, Offline services & Data Enquiry Service being carried out June 2019. | 3/18/2019 | 3/18/2019 | Closed | |||
82 | Closed | 974369 | P2 | N/A | N/A | Intermittent login issue with Xoserve Portal | Users experiencing intermittent issues with loggin into the Portal, error message displayed. Identified at 08:46 on 22/03/2019 | Portal | All Customers | The User Identification (IDAM) issue, system was re-started which resolved the issue at 10:16. | 3/22/2019 | 3/22/2019 | Closed | |||
83 | Closed | 974852 | P2 | N/A | N/A | Users unable to access Gemini | Users unable to access Gemini impacting Gas Nominations, UIG Nominations, demand estimation & Capacity Auctions. | Gemini processes | All Customers | Database error. Raised at 23:25, service resumed at 02:35 and all activities completed before maintenance window. | 3/25/2019 | 3/25/2019 | Closed | |||
84 | Closed | 976190 | P2 | N/A | N/A | Intermittent access issue with Xoserve Portal | Identified on 25/03/2019 at 15:36 that users were getting intermittent issues with accessing the Xoserve Portal. | Portal | All Customers | Intermittent network issues between 15:00 and 16:00. Serviced resumed at 16:00. Service review or Portal, Offline services & Data Enquiry Service being carried out June 2019. | 3/25/2019 | 3/25/2019 | Closed | |||
85 | Closed | 976637 | P2 | N/A | N/A | Users unable to view data in online Gemini screen | Users were able to access Gemini but unable to view data in the online screens. Raised at 23:55. | Gemini processes | All Customers | Database error resulting in batch job failure. Archived log full, old files deleted. Service resumed on 27th March at 00:30. | 3/26/2019 | 3/27/2019 | Closed | |||
86 | Closed | 977126 986730 |
P2 | 1336 | N/A | File Record incorrectly being sent for lapsed Nomination Offers | Data being issued to Shippers when they are not entitled to it. Workaround in place to stop S91 records being sent for lapsed nomination offers in .NRL file each month. Data correction being carried out on monthly basis. |
Revised Supply Point Data Notifications (S91 File Record), within the Annual Quantity (AQ) Notification file (NRL), have been incorrectly issued to the Nominating Shipper after the Nomination Offer has lapsed; 748 meter points have been affected | SPA - Transfer of Ownership | All Shippers | System functionality - defect raised. As part of our resolution to fix the issue, and in preparation to generate the correct .NRL file in April, a system data fix to update the status of the Offers was carried out. Three MPRNs were not included in the data fix, which resulted data being issued in the NRL file on Thursday 18th April. |
3/27/2019 | May-2019 | Closed | Additional ticket number added due to incident re-occuring on 18/04/2019 Defect 1336: Data fix deployed 12th April Enduring fix deployed 10th May 2019. Business validation on the AQ notification file completed 23rd May and .NRL files successfully delivered on 24/05/2019 |
|
87 | Closed | 977205 | N/A | N/A | N/A | Delay in sending the daily read files (MDR) to Shippers | On the 28th March 2019 the daily read files (for Gas Flow Day of the 27th march 2019 ) for Class 1 sites were issued late to Shippers | Read process | All Shippers | To be confirmed | 3/28/2019 | 4/1/2019 | Closed | |||
88 | Closed | 977462 | P2 | N/A | N/A | IX – Connectivity issue with multiple shipper sites. | On 29/03/2019 at 16:07 it was identified there was an IX connectivity issue for multiple customers. | All processes | All Customers | Outage in network affecting multiple customers. Service was restored at 17:30 | 3/29/2019 | 3/29/2019 | Closed | |||
89 | Closed | 977961 | P2 | N/A | N/A | UIG Gas Nomination not published. | UIG for the 1st April not published. Identified on 31/03/19 at 11:16 | UIG | All Shippers | Data issue causing UIG batch job to fail. Fix applied and UIG published at 14:32. | 3/31/2019 | 3/31/2019 | Closed | |||
90 | Closed | 978104 | P2 | N/A | N/A | CMS services unavailable | All users unable to perform any operations in CMS, identified at 08:24. | CMS | All Shippers | Identified at 08:24. SQL exceptions raised, Vendor involved and logs shared. Service restored at 11:15. | 4/1/2019 | 4/1/2019 | Closed | |||
91 | Closed | 978225 | P2 | N/A | N/A | IX – Connectivity issue for multiple customers. | On 01/04/2019 at 12:12 it was identified there was an IX connectivity issue for multiple customers. This also affected the ability to connect to Gemini via Citrix . This was due to capacity issue with Xoserve's Third Party Suppliers automation software |
All processes | All Customers | Outage in network affecting multiple customers. Service was restored on 01/04/2019 at 12:45. | 4/1/2019 | 4/1/2019 | Closed | |||
92 | Closed | 978730 | P2 | N/A | N/A | Portal Services performance issues | Some Users experiencing performance issues with Portal & CMS |
Portal | All customers | Configuration change implemented on 28th March 2019. Portal team reverted the configuration change on 12/04/19 which was originally implemented on 28th March to resolve the issue. (RFC 8086 : Modify Portal Maintenance configuration to support application specific maintenance page) | 4/2/2019 | 4/2/2019 | Closed | P2 closed as fix complete on 12/04/2019 | ||
93 | Closed | 978889 | P2 | N/A | N/A | Transfer of ownership file (.TRF & .MRI) held in AMT- Market flow | On 02/04/2019 at 20:43 it was identified there was an issue in Market flow where files were not being processed. Alerts triggered, files prioritised & TRF/MRI files processed within D-1 of the registration effective date. Files generated on 2nd April, delivered to customers on the 3rd April. Effective date in these files was 4th April. | SPA - Transfer of Ownership | All Shippers | Files stuck in Market Flow due to increase of files received on 02/04/19 | 4/2/2019 | 4/3/2019 | Closed | |||
94 | Closed | 979373 | P2 | N/A | N/A | UIG Nomination not published in time within Gemini | UIG Nominations were delayed in being published for GFD 5th April 2019 | UIG | All Shippers | Meter Details file (.MDS) was received on 03/04/19 and had two records associated to the same UG meter. Datafix applied to update the UG meter for which the data was not present. |
4/4/2019 | 4/4/2019 | Closed | |||
95 | Closed | 979500 | P2 | N/A | N/A | Delay in issuing the Invoicing (.INV) files | Delays in issuing the invoicing (.INV) files from AMT Market flow due to a backlog of files. Alerts triggered and files prioritised. All files were issued before 17:00 hrs. | Invoicing - General | All Shippers | Backlog of files were holding up the processing of the Invoicing files and therefore caused delay | 4/4/2019 | 4/4/2019 | Closed | |||
96 | Closed | 981847 | P2 | N/A | N/A | IX – Connectivity issue for multiple customers. | On 08/04/2019 at 17:06 it was identified there was an IX connectivity issue for multiple customers affecting the flow of files. Service resumed at 18:51 | All processes | All Customers | Third party technical fault | 4/8/2019 | 4/8/2019 | Closed | |||
97 | Closed | 980799 | P2 | N/A | N/A | EU Gas Nominations Job Failures in Gemini | Shippers are unable to confirm EU nominations in Gemini due to a delays in receiving auction details. Impact time 01:38am and resolved at 14:07pm | Gemini processes | All Shippers | Batch Job Failure | 4/8/2019 | 4/8/2019 | Closed | |||
98 | Closed | 986190 | P2 | N/A | N/A | Data Enquiry Service currently unavailable | Customers unable to access the Data Enquiry system | Xoserve system failed which resulted in customers not being able to access the Data Enquiry Service from 05:11am until 15:41pm on 22nd April | Portal | All Customers | Xoserve system failing due to third party technical error. Service review or Portal, Offline services & Data Enquiry Service being carried out July 2019. | 4/22/2019 | 4/22/2019 | Closed | ||
99 | Closed | 983611 979757 |
N/A | 1350 1363 |
N/A | Issues relating to processing of Supply Point Updates | Shippers are unable to update Supply Meter Point details | 1350: When a Shipper is trying to amend Supply Point Meter Details via the .SPC file, the files are being rejected for NTS Direct Connect Telemetered Sites due to postcode validation not existing in the system. Low volume of MPRNs affected 1363: Requests to update the Shipper Nomination Reference Number via the RFA file are being rejected incorrectly. |
SPA - Update of Supply Meter Point Details | All Shippers | System functionality not having the required validation in place | 4/12/2019 | May-2019 | Closed | Defect 1350: Deployed 17th May 2019 Defect 1363: Deployed 10th May 2019 |
|
100 | Closed | 989460 | P2 | N/A | N/A | CMS Performance issues | Users experiencing slowness with the service | 11:43 CMS performance issues, with users advising that the service was running slow. 12:46 System performance resolved and running back to full capacity |
CMS | All Customers | CMS applications team found a long running query in the system which they then stopped and performance was improved. A P3 ticket has been raised for ongoing monitoring. | 30/04/2019 | 30/04/2019 | Closed | ||
101 | Closed | 989433 | P2 | N/A | N/A | Data Enquiry (DES) Performance issues | Users experiencing slowness with the service | 10:16 Some users experiencing performance issues with Data Enquiry Service 14:50 System performance resolved and running back to full capacity |
Data Enquiry System (DES) | All Customers | Batch job overrun. Prevention – Improved identification of high CPU spikes. Service review of Portal, Offline services & Data Enquiry Service being carried out July 2019. |
30/04/2019 | 30/04/2019 | Closed | ||
102 | Closed | 987198 | P2 | N/A | N/A | Monthly AQ not updated for 9,000 MPRNs | Shippers had not received notification of an AQ revision in the montly .NRL file .NRL files are being manually for affected MPRNs sent to Shippers via the IX / Email. |
During the AQ calculation process for April 2019, a system exception was created for approximately 9,000 Supply Meter Points. The exceptions were not processed in time, before the notification file (.NRL) was sent, which resulted in a revised AQ not being calculated with an effective date of 1st May 2019 and notified to Shippers. NDM Nominations and UIG Gas Allocations were incorrect for Gas Flow Day 1st May 2019 however the gas allocations were corrected for the 1st May 2019 before GFD+5. All relevant tables updated prior to the generation of AQ reports issued to Networks. |
AQ process | All Shippers | Exceptions were not resolved and processed before the AQ process and notification files were isued. | 4/24/2019 | May-2019 | Closed | Incident closed on 31st May. Communication sent to Shippers, requesting preferred method to receive the AQ Notification files (NRL). Customer Advocates have contacted outstanding Shippers directly to advise on this. |
|
103 | Closed | 990784 | P2 | N/A | N/A | CMS Performance issues | Users not able to access the system | 07:31 CMS performance issues, with users advising that the service is running slow and that they are being timed out of the system. 10:48 Service resumed and running back to full capacity |
CMS | All Customers | Database start-up was delayed as there was an implementation change carried out, start-up job got failed, which resulted in unnecessary timeouts with the system. | 5/3/2019 | 5/3/2019 | Closed | ||
104 | Closed | 991005 | P2 | N/A | N/A | Delay in publishing UIG Gas Nominations for 4th May | Shippers unable to determine how much gas they need to buy via online screen for next gas day due to information not being published on time in Gemini | Delay in publishing the UIG Gas Nominations for Gas Flow Day 4th May 2019 | Gemini processes | All Shippers | Manual Error. Prevention – Review appropriate checks are completed. | 5/3/2019 | 5/3/2019 | Closed | ||
105 | Closed | 995034 | P2 | N/A | N/A | Data Enquiry Service unavailable for customers | Users unable to access Data Enquiry Service | Customers were able to access the Xoserve Portal, however there were multiple customers unable to access the Data Enquiry Service from 11:15am. Service was resumed at 11:30am |
Data Enquiry System (DES) | All Customers | Concurrent maximum threshold for users was exceeded Prevention – Increase the threshold for users planned change target 22/06/19 Service review or Portal, Offline services & Data Enquiry Service being carried out July 2019. |
5/16/2019 | 5/16/2019 | Closed | ||
106 | Closed | 989429 | N/A | N/A | N/A | Delay in issuing the Notification of Meter Point Status Change files (.NMS). | Shippers were not notified of changes to meter point statuses, or effective change dates in UK Link for Supply Meter Points in their ownership. For example, meter point status changes from Dead (DE) to Live (LI) and the date that this was effective from. | From Monday 8th April 2019 to Friday 3rd May 2019, Shippers had not received the Notification of Meter Point Status Change files (.NMS) | SPA - Supply Point Updates | Shippers | The files were not sent as a result of a system restart error in SAP ISU. One .NMS file failed which then prevented any subsequent files to be processed. | 5/8/2019 | 5/16/2019 | Closed | ||
107 | Closed | N/A | N/A | N/A | Issue identified with the current Find My Supplier web service | The web service was unavailable for customers from 3:15pm on 20/05/2019 until 12:00pm on 22/05/2019. Users attempting to use the web service were redirected to the Xoserve Domestic Consumer M Number Helpline | Internal validation code testing identified an issue in the current Find My Supplier web service that could potentially be abused by a malicious user. In order to resolve this issue, the service was suspended with immediate effect. During the service outage a message was displayed on the website informing users of the ongoing maintenance. |
Find My Supplier | All Customers | Development and build of the system lacked security to prevent malicious users from hacking the system. | 5/20/2019 | 5/22/2019 | Closed | |||
108 | Closed | 981489 | N/A | 1378 | N/A | Conflicting data provided in Network reports | Incorrect Weather Variance Correction (CWV) values provided in reports which are sent to Networks on a weekly basis Xoserve manual workaround in place to retrieve correct values which mitigates impact to customers |
It has been identified that there is a mismatch of Weather Variance Correction values (CWV) within two reports which are sent to Networks on a weekly basis (Network Throughput Data Weekly Report and Weather and CV Report) |
Revenue Assurance Reporting | Networks | TBC | 4/8/2019 | Jun-2019 | Closed | Defect 1378: Deployed 7th June 2019 | |
109 | Closed | 998106 | P2 | N/A | N/A | Xoserve Portal Service unavailable for customers | Users unable to access Xoserve Portal | All users unable to perform any operations in Xoserve Portal from 8:06am on 23/05/2019. Service was restored at 08:36am on 23/05/2019 |
Portal | All Customers | Portal services failed to load, following maintenance checks carried out. Service review or Portal, Offline services & Data Enquiry Service being carried out July 2019. | 5/23/2019 | 5/23/2019 | Closed | ||
110 | Closed | 998274 | P2 | N/A | N/A | CMS Performance issues | Users experiencing slowness with the service | 09:10 CMS performance issues, with users advising that the service is running slow and that they are unable to navigate round the system 10:20 Service resumed and running back to full capacity |
CMS | All Customers | Increased traffic in the system caused the application to run slower than normal | 5/23/2019 | 5/23/2019 | Closed | ||
111 | Closed | 999101 | P2 | N/A | N/A | Data Enquiry (DES) Performance issues | Users experiencing slowness with the service | 10:21 Due to an internal batch job overunning, there was a subsequent effect on DES performance for customers, experiencing intermittent speed and access issues with Xoserve Portal 1:31pm Service was restored and running back to full capacity |
Portal | All Customers | Delay of files from CMS which has had a subsequent effect to the daily job in Portal and resulted in high volume of traffic in the system. Service review or Portal, Offline services & Data Enquiry Service being carried out July 2019. |
5/24/2019 | 5/24/2019 | Closed | ||
112 | Closed | 999785 | P2 | N/A | N/A | Issues generating AAQ and MDS Files | Gas Nominations and allocations in Gemini would have been incorrect if the files were not manually corrected | Due to deployment of another defect, Aggregated Annual Quantity (AAQ) and Meter Details (MDS) files for Gas Flow Days 24th, 25th and 26th were not generated. There was a workaround in place for the files to be loaded into Gemini by the end of the day, and therefore there was no impact to Demand Attribution or UIG. | Gemini processes | All Shippers and Networks | Due to the implementation of defect 1310 | 5/26/2019 | 5/26/2019 | Closed | ||
113 | Closed | 1001036 | P2 | N/A | N/A | Slowness with Xoserve Service Portal | Users experiencing slowness with the service | 15:10 Low number of customers raised tickets, advising that they were experiencing slowness within Portal 15:25 Service was restored and running back to full capacity |
Portal | All Customers | Database error referred to Third Party for analysis and recommended to apply a patch. Prevention – Testing of patch in progress target date 02/07/19. Service review or Portal, Offline services & Data Enquiry Service being carried out July 2019. | 5/30/2019 | 5/30/2019 | Closed | ||
114 | Closed | 1004222 | P2 | N/A | N/A | AMT Market Flow stopped polling inbound DLC files | Estimated reads may not be accurate | AMT Market Flow stopped polling inbound Daily Read Equipment Read (.DLC) files. The application was restarted and files were successfully processed in time, therefore no impact to systems | Read process | Shippers and Networks | Root cause analysis ongoing | 6/5/2019 | 6/5/2019 | Closed | ||
115 | Closed | 1004230 | P2 | N/A | N/A | Xoserve Portal Service unavailable for multiple customers | Low number of customers unable to access the Xoserve Portal | 08:35am Low number of customers were unable to access the Xoserve Portal 08:52am Service was resumed |
Portal | All Customers | Due to system downtime being short no logs were taken to be able to investigate the route cause. | 6/5/2019 | 6/5/2019 | Closed | ||
116 | Closed | 995137 | N/A | 1394 | N/A | Issues with manual Replacement Reads | This may impact reconciliation charges, and issuing of Billable Meter Readings (.MBR) No workaround in place, however all meter points affected will require a data correction once the fix has been deployed. |
Where an Xoserve user manually replaces an opening read on behalf of a Shipper, an internal table within the system is not updating correctly, which is causing downstream impacts | Read process | All Shippers | Root cause analysis ongoing | 5/16/2019 | Sep-2019 | Closed | Defect 1394: Deployed on 13th September 2019 | |
117 | Closed | 1006278 | P2 | N/A | N/A | UIG Allocations not published in Gemini | UIG allocations are not visible in Gemini for GFD 8th June 2019. | UIG allocations have not been calculated for GFD 8th June, resulting in UIG allocations not being published in Gemini on time. | Gemini processes | All Shippers | The Calorific Values File (CVV) was rejected by Gemini, as it was outside of the acceptable validation range. | 6/10/2019 | 6/10/2019 | Closed | ||
118 | Closed | 1007415 | P2 | N/A | N/A | AMT Market Flow application unavailable | Customers unable to send or receive files | AMT Market Flow primary server was unavailable from 8:30am on 12th June 2019. As a result, Xoserve were unable to process incoming and outgoing files. | AMT | All Customers | The overrunning of a file permissions script Prevention – Improved identification of high CPU spikes and ongoing investigations with 3rd party vendor to address script overrunning. |
6/12/2019 | 6/12/2019 | Closed | ||
119 | Closed | 1007416 | P2 | N/A | N/A | Xoserve Portal Service unavailable for customers | Users unable to access Xoserve Portal | All users unable to perform any operations in Xoserve Portal from 8:31am on 12/06/2019. | Portal | All Customers | A number of concurrent user sessions exceeding normal daily usuage Prevention – uprgade to usuage permissions |
6/12/2019 | 6/13/2019 | Closed | ||
120 | Closed | 1008921 | P2 | N/A | N/A | Users unable to access DES Portal | Low number of customers unable to access Data Enquiry Service | 11:52am Low number of customers were unable to access Data Enquiry 11:55am Service was resumed |
Data Enquiry System (DES) | All Customers | Increased traffic in the system caused the application to run slower than normal. Service review or Portal, Offline services & Data Enquiry Service being carried out June 2019. | 6/17/2019 | 6/17/2019 | Closed | ||
121 | Closed | 1009091 | P2 | N/A | N/A | UIG Allocations not published in Gemini | The allocations for Gas Flow Day 16th June 2019 not visible in Gemini | Allocations have not been calculated for GFD 16th June and not published in Gemini until 19th June. | Gemini processes | All Shippers | Allocation suite and invoice batch jobs had not completed delaying the allocation batch process. Full RCA expected 09/07/2019 | 6/18/2019 | 6/18/2019 | Closed | ||
122 | Closed | 1010254 | P2 | N/A | N/A | CMS Performance issues | Users are experiencing performance issues while accessing the application | 10:23 P2 raised as Users experiencing performance issues with CMS application & internal users unable to upload files. Outage between 11.30 to 11:50 and again from 12:40 to 13: 15. Service resumed at 13:15. | CMS | All Customers | RCA expected 20/08/2019 | 6/21/2019 | 6/21/2019 | Closed | ||
123 | Closed | 963807 | N/A | 1311 1407 1422 1418 1441 |
N/A | Issues with customer reports | 1311: Networks will be undercharging the price of gas to their customers 1407: Network is receiving incorrect emergency contact details within their files 1422: IGT's are not receiving emergency contact details 1418: Incorrect isolation contact details issued in files 1441: Conflicting information held between two reports issued to Shippers |
1311: The BOPRI report is issued to DNs monthly. Issue affects 1 GT where the AQ has dropped by a total of 1.7% since the previous month. 1407: Where a Shipper is providing new emergency contact details for a site, the National Grid Emergency File (EWS) is being populated with the updated details as required, however it is also containing the previous contact number within the 'Alternative Contact 2' field 1422: Where a Shipper is providing new emergency contact details for an IGT site, the Daily Delta File (IDL) is not containing any emergency contact details 1418: Legacy isolation contact details are not being correctly end dated within the National Grid Emergency File (EWS) 1441: The values in the Performance Assurance Report Register(PARR) for the 'No Meter Attached' and 'No Meter Attached but Data Flows Received' tabs do not agree to the corresponding values issued within the monthly Shipper Packs. |
Reporting | Networks | 2/26/2019 | 10/1/2019 | Closed | Defect 1311: Defect closed as code fix not required. Defect 1407: Deployed 5th August 2019 Defect 1418:Deployed 5th August 2019 Defect 1422: Deployed 1st October 2019 Defect 1441: Deployed 11th September 2019 |
||
124 | Closed | 943678 | N/A | 1348 | N/A | Incorrect NDM forecasts in Gemini | The effective temperature value for gas nominations in Gemini is incorrect which is causing significantly higher Non Daily Metered forecasts due to the temperature discrepancy. All LDZs impacted |
Multiple internal files are required to be processed in Gemini in a certain order to calculate the weather temperature for D-1, however due to the files not being processed in the required order, the effective temperature for Gas Day -1 is being calculated incorrectly. | Gemini processes | Shippers & Networks | 12/28/2018 | 6/27/2019 | Closed | Defect closed as files have been automated | ||
125 | Closed | 968192 | N/A | 1366 | N/A | Allocation Agent file not delivered (for a Shared Supply Meter Point (SSMP)) | Agent requires the file in order to allocate energy between Sharing Users in Gemini Minimal mpact as Xoserve are manually sending the files |
Comm Ops Agent File (CMA) which is sent to NG (Gemini) 3 times a day, is only being sent twice | Gemini processes | Networks | 3/8/2019 | Aug-2019 | Closed | Defect 1366: Deployed on 30th August 2019 | ||
126 | Closed | 985357 | N/A | 1371 | N/A | Consumption Adjustment incorrectly rejecting following class change | Shippers are unable to amend adjustmemts where there has been a class change No workaround currently in place, however any sites which are facing this issue can have Consumption Adjustment once the defect has been deployed |
Where an Xoserve user manually processes a Consumption Adjustment on behalf of a Shipper, where there has been a class change from Class 1, 2 and 3 to Class 4, the system is incorrectly rejecting due to the adjustment period not being a valid meter read period. However the read period is correct and should be accepted. | Consumption Adjustment | All Shippers | 5/6/2019 | Aug-2019 | Closed | Defect 1371: Deployed on 30th August 2019 | ||
127 | Closed | 990336 | N/A | 1404 | N/A | System files not correctly processing into UK Link | Defect 1404: Shippers will be billed incorrectly if the file is not loaded into the system when the invoice is issued. As Shippers will not be billed until the file is successfully loaded into the system, there is no direct impact to customers. |
1404: The Post Closeout Allocation file (PCA) which is an internal fie processed from Gemini to UK Link, is causing energy data for Interconnectors to not update in the system with the revised energy values from Gemini |
Energy | All Shippers | Post Closeout Allocation file is not automatically being processed as required. Technical team is manually having to upload the file into the system until fix is deployed. | 6/17/2019 | Aug-2019 | Closed | Defect 1404: Deployed on 30th August 2019 | |
128 | Closed | 1012333 | P2 | N/A | N/A | CMS services unavailable | Customer unable to carry out any actions in CMS | All users unable to perform any operations in CMS, identified at 07:13 | CMS | All Customers | Configuration files were removed from server statup location, when system was rebooted the system could not locate the files, therefore system would not reboot. | 6/28/2019 | 6/28/2019 | Closed | CMS restored 10.32am | |
129 | Closed | 1010369 | N/A | 61026 |
N/A | Reads not being processed correctly | Potentially affect reconciliation and submission of future reads | 61026: Shipper transfer estimate reads are being overwitten by Must Reads and Cyclic Reads for class 4 sites which should be rejected as they should only be overwitten by a replacement read. |
Read Process | All Shippers | Dec-19 | May-21 | Closed | Defect 61026: Deployed on 29/05/2021 |
||
130 | Closed | 1013931 | P2 | N/A | N/A | Intermittent access issues for multiple shippers using Gemini | Customers unable to access Gemini and carry out any processes. | Shippers did not have access to Gemini via the API and were unable to progress any automated processes and will not be able to complete any bulk uploads or downloads. | Gemini processes | All Customers | Awaiting RCA from third party vendor | 7/3/2019 | 7/3/2019 | Closed | System restored | |
131 | Closed | 1015019 | P2 | N/A | N/A | Delay in publishing UIG Gas Nominations | Shippers unable to determine how much gas they need to buy via online screen for next gas day due to information not being published on time in Gemini | Delay in publishing the UIG Gas Nominations for Gas Flow Day 6th, 7th and 8th July 2019 | Gemini processes | All Shippers | Awaiting RCA from third party vendor | 7/7/2019 | 7/7/2019 | Closed | System restored | |
132 | Closed | 1016280 1018932 |
P1 | N/A | N/A | Historic Emergency Contact & isolation contact details & 'alternative contact details' being issued in files | Gas Transporters could potentially use incorrect contact details in emergency situation | Historic Emergency & isolation contact details are being provided to the Networks and IGTs within the Daily Delta Files and Quartlery Delta Files (EDL, EWS, EQL, IDL & IQL). Code fix and data fix implemented to correct any corrupt data. Scenario also applied to 'alternative contact details' provided as part of PSR data. | SPA | All Gas Transporters | Due to data migration from legacy system, files not end-dating details following an update. | 7/10/2019 | 7/10/2019 | Closed | Code fix and data fix implemented to correct any corrupt data. | |
133 | Closed | 1018468 | P2 | N/A | N/A | Potential delay in sending the UPI invoice support information files | Delay in customers receiving their supporting files therefore unable to validate or interrogate their invoice charges | Invoice issued as expected however the supporting files are not producing in the time expected. | Invoicing - General | Customers | Expected 23rd August 2019 | 7/15/2017 | 7/15/2019 | Closed | Code fix implemented after testing it in pre-production environment. All the supporting information files were generated successfully in ISU. AMT Market flow team confirmed that all the files has been delivered to shippers within SLA and delivery receipt received | |
134 | Closed | 1023187 | P2 | N/A | N/A | Delay in processing read files | Delay for customers receiving their read response file notifying if the reads have been accepted or rejected. | Read files for Class 3 and 4 meter points received on 31st July and 1st August were not processed until 2nd August. Although the SLA is 2 business days the files are usually processed and a response sent within 1 business day. | Read process | All Shippers | Files for the 31st July were held in the system which meant any subsequent read files were also held. Full RCA expected on 23/08/2019. | 8/2/2019 | 8/2/2019 | Closed | Files received on the 31st July were not processed and responed to until 2nd August 2019 | |
135 | Closed | 931836 | P2 | N/A | N/A | Multiple Job Failures in Gemini Entry System | This will impact shipper's gas buying decision | Demand did publish for 00:00 hrs. Latest NDM nomination and UIG nomination will not be visible on the screen |
Gemini processes | All Shippers | Expected 23rd August 2019 | 8/2/2019 | 7/7/2019 | Closed | System restored at 16:00 | |
136 | Closed | 1029165 | P2 | N/A | N/A | Demand Attribution not published for 10th hour bar | Shippers will not be able to see the latest value of Demand Attribution at 10 AM | Demand Attribution was not published for 10th hour bar. P2 was raised and information was available in Gemini at 11.18am | Gemini processes | All Shippers | TBC | 8/22/2019 | 8/22/2019 | Closed | ||
137 | Closed | 1034648 | P2 | N/A | N/A | IX - Connectivity Issue for 1 customer | Files will not be delivered to customer via IX | IX - EFT not able to connect to customer site due to FTP login failure. Incident raised on 08/09/2019, 13:37 | IX | Shipper | FTP File Transfer login failed. | 9/8/2019 | 9/11/2019 | Closed | IX restored at 22:30, backlog of files processed & sent sucessfully. | |
138 | Closed | 1039441 | P2 | N/A | N/A | Data Enquiry Service unavailable for customers | Customers unable to log into DES | Customers unable to log into Data Enquiry System (DES), raised on 18/09/2019 09:17 | Data Enquiry System (DES) | All Customers | 2 of the 4 BW servers were unresponsive due to high CPU utilisation. Impacting jobs were stopped and service resumed. | 9/18/2019 | 9/18/2019 | Closed | Service restores on 18/09/2019 09:28 | |
139 | Closed | 1042583 | P2 | N/A | N/A | Delay in the production of the NTS Commodity invoices | Potential delay to receiving the NTS Commodity invoice, if contingency triggered customers may also receive their invoice via email. | The NTS Commodity invoice was taking longer than normal to generate in Gemini impacting the issue of the invoice | NTS Commodity Invoice | Shippers & National Grid | Initial root cause is the data growth due to the GB Charging implementation. However this additional data is not used in the invoice. Fix implemented. | 9/25/2019 | 9/25/2019 | Closed | All invoices were produced, validated & issued by 19:15. | |
140 | Closed | 1046652 | P2 | N/A | N/A | NDM Gas Nominations | Lastest Gas Nominations not published | Latest value of Demand Attribution not published at 12 AM for gas day 5th October. P2 was raised and information was available in Gemini at 01.35am | Gemini processes | All Shippers | Analysis ongoing | 10/5/2019 | 10/5/2019 | Closed | Incident raised at 00:32. Resolved at 01:45. | |
141 | Closed | N/A | 1465 | Delay in sending invoice | Shippers have not received their financial invoice on time | The Compression invoice (CPN) for the billing month July 19 has not been on the expected date (17th Business Day of the Month) | Invoicing Processes | All Shippers | 9/19/2019 | 12/6/2019 | Closed | Defect: 1465 Deployed 29th November 2019 | ||||
142 | Closed | 1020078 | N/A | 1471 | N/A | MI / Reports | Incorrect data issued in MI or reports | Ratchet Report is reflecting incorrect financial values | Ratchets | All Shippers | Analysis ongoing | 10/1/2019 | 12/6/2019 | Closed | Defect 1471: Deployed 29th November 2019 | |
143 | Closed | 1036299 | N/A | 62512 | N/A | Portfolio update reports/files | Incorrect or incomplete data issued in portfolio files to customers | 62512: Following a Gas Transporter site transfer, the B43 record within the IDL file should be sent to both networks and with 'N' (new code) to New network and 'D' (deletion code) to old network, however both networks are receiving 'U' (update code) |
Portfolio Files | Networks & IGTs | Analysis ongoing | 10/2/2019 | Sep-20 | Closed | Defect 62512: Deployed 21st August 2020 | |
144 | Closed | 1045449 | N/A | 60967 | N/A | Missing data from Shipper response files | Impacting Greenfield sites only . Shippers will not have the correct EUC values effective 1st October | The EUC effective 1st October is incorrect for greenfield sites | SPA - Files | Shippers | Analysis ongoing | 10/4/2019 | 12/6/2019 | Closed | Defect 60967: Deployed 16th May 2020 | |
145 | Closed | 1040365 | N/A | 1481 | N/A | Data not being displayed in DES | Customers are unable to review meter exchange reads in Data Enquiry Service (DES) | Read Details screen within DES is not showing meter exchange reads | Data Enquiry System (DES) | Shippers & Networks | Analysis ongoing | 10/14/2019 | 1/10/2019 | Closed | Defect 1481: Deployed 15th November 2019 | |
146 | Closed | 1048763 | P2 | N/A | N/A | EU Gas Nominations | Shippers are not able to confirm EU nominations | Shippers are not able to confirm EU nominations. One shipper affected and 1 TSO. | Gas Nomination processes | Shippers | Analysis ongoing | 10/11/2019 | 10/11/2019 | Closed | Incident raised at 09:06. Gemini team contacted all shippers that placed EU nominations. Incident resolved at 11:45 | |
147 | Closed | 1054151 | P2 | N/A | N/A | NDM Gas Nominations | Updated NDM Gas Noms not published | Demand Attribution not published at 24th Hour for 27th and 28th October 2019. Demand Attribution and UIG nomination for the 24th hour not published for the Gas Day 27th October 2019. | Gas Nomination processes | Shippers | Analysis ongoing | 10/28/2019 | 10/28/2019 | Closed | Incident raised at 00:45. Resolved at 03:15 | |
148 | Closed | 1059126 | P2 | N/A | N/A | NDM Gas Nominations | NDM Gas Noms not updated on Gemini until 22:40 | Demand Attribution has not been published for 21st hour for gas day 12th Nov 2019 | Gas Nomination processes | Shippers | Receipt of duplicate files from the Attribution Data Suppliers. | 11/12/2019 | 11/12/2019 | Closed | Incident raised at 21:22. Resolved at 22:30. | |
149 | Closed | 1059193 | P2 | N/A | N/A | NDM Gas Nominations | NDM Gas Noms not updated on Gemini until 03:13 | NDM nomination has been published with wrong values | Gas Nomination processes | Shippers | Receipt of duplicate files from the Attribution Data Suppliers. | 11/13/2019 | 11/13/2019 | Closed | Incident raised at 00:15. Resolved at 03:15. Ticket raised for monitoring | |
150 | Closed | 1061625 | P2 | N/A | N/A | NDM Gas Nominations | Shippers will not be able to perform DM nominations & NDM Noms & UIG not published. | NDM nomination not be published for 21 hours due meaning shippers will not be able to perform DM nominations | Gas Nomination processes | Shippers | Receipt of duplicate files from the Attribution Data Suppliers. | 11/21/2019 | 11/22/2019 | Closed | Incident raised at 21:39. Resolved at 00:23. Ticket raised for monitoring | |
151 | Closed | 1067763 | P2 | N/A | N/A | NDM Gas Nominations | NDM Gas Noms not published | Demand Attribution has not been published for 21 hour for gas day for gas day 9th December | Gas Nomination processes | Shippers | Demand Attribution suppliers failed to send files on time. | 12/9/2019 | 12/9/2019 | Closed | Incident raised at 21:50. Resolved at 22:19 | |
152 | Closed | 1069863 | P2 | N/A | N/A | CMS Unavailable | Customers unable to log into CMS | CMS application was unavailable for end users to access. Users unable to perform any operations in CMS. | CMS | All Customers | A database utilised by the service had connections that were not being released and stopping new connections from being made. Database service re-started. | 12/13/2019 | 12/13/2019 | Closed | Incident raised at 13:14. Resolved at 16:15 | |
153 | Closed | 1072122 | P2 | N/A | N/A | Xoserve Portal Service unavailable for customers | Users unable to access Xoserve Portal | All users unable to perform any operations in Xoserve Portal | Portal | All Customers | Our communications provider had a fault with their network equipment resulting in traffic to the portal was inaccessible. | 12/19/2019 | 12/19/2019 | Closed | Incident raised at 09:52. Resolved at 13:30 | |
154 | Closed | N/A | N/A | N/A | TBC | XCE1859 | Late reads received via Must Read process causing downstream issues | The meter reads are causing high value AQs to be calculated and reconciliation charges, credits and debits. There is currently a backlog of meter reads held by MRAs that still require to be loaded into the system. |
On receipt of aged meter reads submitted by Meter Reading Agencies (some over 2 years old), the reads are being incorrectly accepted where subsequent reads have already been loaded into the system. | Must Read process | All Customers | Analysis ongoing | 11/4/2019 | TBC | Closed | Discussions taking place with DN and Shippers. Update provided at August CoMC on Joint Office under Contract Management Committee (CoMC) meetings: https://www.gasgovernance.co.uk/DSC-Contract |
155 | Closed | 1052131 | N/A | 61003 | N/A | Incorrect data held in read files | Incorrect data issued in read files to customers | When multiple estimated reads are generated, the Billable Meter read (.MBR) and Unbundled Read Notification File (.URN) are being populated with the incorrect Shipper Nomination Reference number, | SPA - Files | Shippers | Analysis ongoing | 12/16/2019 | 3/1/2020 | Closed | Defect 61003: Deployed 24th April 2020 | |
156 | Closed | 1069029 | N/A | 61004 | N/A | Issues with class change requests | Class change for sites are delayed and may result in customers potentially being charged incorrect rates | Class change requests which are received over the weekend period are being rejected with error code 'CLS00001' (Insufficient notice given to change the class). Effective dates provided for these requests are 5 business days away from the processing date and falls on the next weekend. These requests should not have been rejected as 5 Business Days notice period have been provided for these requests. | SPA - Update of Supply Meter Point Details | Shippers | Analysis ongoing | 12/19/2019 | 3/1/2020 | Closed | Defect 61004: Deployed 6th March 2020 | |
157 | Closed | 1077958 | P2 | N/A | N/A | DES performance / connectivity issue | Performance issues and intermittent connectivity issues for customers | On 13th January at 08:45 it was reported that users were facing intermittent connectivity and slowness while accessing the Xoserve DES Portal. | Data Enquiry System (DES) | All Customers | Peterborough Data Centre circuit. A project change to a network configuration was incorrectly implemented. Our suppliers corrected the configuration. | 1/13/2020 | 1/13/2020 | Closed | Incident raised at 08:45, resolved at 14:20 | |
158 | Closed | 1078537 | P2 | N/A | N/A | Demand estimation not available on Gemini | Delay in publishing updated Demand Attribution in Gemini for 14th January 2020 | For GFD 14th January there was a delay in publising the updated demand estimation. | Gemini processes | All Customers | As a part of DC exit project, there was a change performed on test DNS server which replicated back to production environment which caused the issue. Changes were reverted to resolve the incident. | 1/14/2020 | 1/14/2020 | Closed | Incident raised at 15:22, resolved at 15:51 | |
159 | Closed | 1078732 | P2 | N/A | N/A | Users unable to access CMS application | Customers unable to access and carry out updates in CMS | On 15th January at 11:22 it was reported that users were unable to access CMS. | CMS | All Customers | A server hardware fault caused the service to fail. | 1/15/2020 | 1/15/2020 | Closed | Incident raised at 11:22, resolved at 16:16 | |
160 | Closed | 1081180 | P2 | N/A | N/A | Gemini application was unavailable for National Grid Control Room users | National Grid users were unable to access Gemini application for 45 mins | On 24th January at 07:16 NG Control Room were unable to access Gemini. | Gemini processes | National Grid | A project change on a network configuration was incorrectly implemented | 1/24/2020 | 1/24/2020 | Closed | Incident raised at 07:16, resolved at 08:00 | |
161 | Closed | 1083700 | P2 | N/A | N/A | Users unable to access Portal services | Users are not able to access the Xoserve Portal services | On 31/01/2020 at 15:23 it was reported that Users were unable to access Portal services | Portal | All Customers | Our suppliers communications provider encountered an internal network issue impacting a large number of customers in London & Leicestershire. | 1/31/2020 | 1/31/2020 | Closed | Incident raised at 15:23, resolved at 17:00 | |
162 | Closed | 1084471 | P2 | N/A | N/A | XCE1876 | IX unavailable | Customers unable to send or receive files via the IX | On 3rd February 113 customers were affected by the IX not being available to transmit incoming & outgoing files. | IX | All customers | Network outage | 2/3/2020 | 2/3/2020 | Closed | N/A |
163 | Closed | N/A | N/A | N/A | N/A | XCE1886 XCE1896 |
Unresolved System Exceptions (BI49) | Reconciliations are being held | For MPRNs that are isolated but an incremented read has been received, the system will accept the meter reading but unable to process as the meter point is isolated. A system exception (B149) is raised. We are currently unable to resolve these Exceptions. As at Feb 2020 there are 8,000 exceptions. If the meter point is consuming gas this energy is not being alloated to the meter point & will be picked up in UIG. A CR has been raised to reject these meter readings however the change is not likely to be implemented until 2021. A process is required to resolve these exceptions which will continue to increase. | Reconciliation - Exceptions | Shippers & Networks | Exception raised but unable to resolve and process reconciliations. | 12/1/2019 | Aug-20 | Closed | Consumption adjustments of zero to input to release the reconciliations that have been held in the system. The reconciliations will be invoiced in the July Amendment invoice. |
163 | Closed | 1089288 | P2 | N/A | N/A | IX unavailable | Customers unable to send or receive files via the IX | File transfer services across the IX network stopped working. File delivery & receipt were delayed. | IX | All Customers | Connectivity to internal storage areas was disrupted | 2/14/2020 | 2/14/2020 | Closed | Incident raised at 16:52, resolved at 17:10 | |
164 | Closed | N/A | N/A | N/A | N/A | AQ calculation for Class 3 meter points | AQ calculation is only able to use meter reads dated the 5th of the month or earlier in the AQ calculation. | Energy for Class 3 & 4 meter points is received daily after exit close out; these are called energy factors. The energy factors are used for Reconciliation & AQ calculation. When the AQ calculation process is triggered (on the 12th) energy fatrors are only available for meter reads dated the upto the 4th (energy factors received in UKLink 7 days after the GFD). This therefore means that although reads dated post the 4th to the 10th will be accepted and will trigger the AQ process they will not be included in the calculation of the AQ (consumption will not be included). | AQ process | Shippers & Networks | System design | 2/1/2020 | TBC | Closed | Included in the process and design improvements as part of the AQ Taskforce. Included on AQ Issue Register | |
164 | Closed | 1090360 | P2 | N/A | N/A | Performance Issues with CMS | Customers unable to perform any actions in the system | Although Users were able to log into the system, due to performance delays users were unable to carry out any actions within the application. | CMS | All Customers | A long running job caused connections to the CMS data base to become locked | 2/17/2020 | 2/17/2020 | Closed | Incident raised at 10:26, resolved at 12:10 | |
165 | Closed | N/A | N/A | N/A | N/A | Duplicate Confirmation requests accepted | If a Shipper submits an Objection against the duplicate Confirmation in error, although this is accepted the objection will not be processed and the Confirmation will become effective. | Where the Shipper submits duplicate Confirmation requests, the system will accept the requests, it should reject any duplicate requests. Process implemented to monitor daily. Any duplicate confirmations will be rejected however a rejection notification will not be issued. The relevant Shippers will be advised. |
Transfer of Ownership | Shippers | 2/1/2020 | TBC | Closed | Monitoring will continue and where duplicate Confirmations have been received the Shipper will be advised. | ||
165 | Closed | 1090505 | P2 | N/A | N/A | IX unavailable | Customers unable to send or receive files via the IX | On 17th February all customers were affected by the IX not being available to transmit incoming & outgoing files. | EFT | All Customers | A project change on a network configuration was incorrectly implemented | 2/17/2020 | 18/02/2020 | Closed | Incident raised at 14:04, resolved at 17:55 | |
166 | Closed | 1090966 | P2 | N/A | N/A | Users unable to access Gemini | Limited connectivity to Gemini for customers | A widespread outage of national network provider's internal network impacted multiple customers, including Xoserve | Gemini processes | All Customers | 2/18/2020 | 2/18/2020 | Closed | Incident raised at 08:19, resolved at 09:00 | ||
167 | Closed | 1091219 | P2 | N/A | N/A | Users unable to access Xoserve Services Portal | Customers are not able to access the Xoserve Portal services | On 18/02/2020 at 12:38 Users were unable to access Portal services | Portal | All Customers | The service that controls authentication to the application stopped allowing users to access the site | 2/18/2020 | 18/02/2020 | Closed | Incident raised at 12:38, resolved at 15:59 | |
168 | Closed | 1091296 | P2 | N/A | N/A | Performance Issues with CMS | Customers unable to perform any actions in the system | Although Users were able to log into the system, due to performance delays users were unable to carry out any actions within the application. | CMS | All Customers | Processes were not being triggered correctly and updates to the database were not completing | 2/18/2020 | 18/02/2020 | Closed | Incident raised at 13:53, resolved at 18:19 | |
169 | Closed | 1091397 | P2 | N/A | N/A | XCE1881 | Performance issues with IX | The processing of customer files were delayed | There was a delay in inbound file processing for a number of customers | IX | All Customers | Whilst restoring the system for incident 1090505, incorrect configuration changes were applied to the system, which caused delays in performance. | 2/18/2020 | 3/19/2020 | Closed | Incident raised at 20:44, resolved at 12:06 on 19th Feb |
170 | Closed | 1092190 | P2 | N/A | N/A | Performance Issues Portal services (DES & CMS) | Customers may have experienced performance issues within a number of services | Performance issues with CMS and Portal applications | CMS and Portal | All Customers | There was a degradation of performance when the system was connecting to an internal database. The root cause of this is not yet known. | 2/21/2020 | 2/21/2020 | Closed | Incident raised at 05:55, resolved at 14:45 | |
171 | Closed | 1092987 | P2 | N/A | N/A | Users unable to access Gemini | Customers unable to access or perform any operations in Gemini | Customers were unable to log into the Gemini application | Gemini processes | Shippers and Networks | Issues on the customers network | 2/22/2020 | 2/22/2020 | Closed | Incident raised at 01:08, resolved at 03:10 | |
172 | Closed | 1095734 | P2 | N/A | N/A | Connectivity issue with NG Metering | Customer files were delayed | Delay for customers with receiving their daily meter reading files (MDR) and Meter Reading & Access Instruction files (MRI) | IX | DMSP and Shippers | An incorrect configuration applied to the Network equipment, resulted in communication failure across the IX network. | 2/26/2020 | 2/26/2020 | Closed | Incident raised at 01:17, resolved at 13:25 | |
173 | Closed | 1099808 | P2 | N/A | N/A | Delay in processing files | Customer inbound files were delayed | Processing of inbound file was delayed due to performance issues | UK Link | All Customers | File transmissions failed post a migration of a file transfer mechanism between data centres, Root cause unknown and being investigated. | 3/2/2020 | 3/2/2020 | Closed | Incident raised at 13:13, resolved at 19:30 | |
174 | Closed | 1096640 | P2 | N/A | N/A | XCE1883 | Misalignment of MPRN data visible to customers in DDP dashboard | Customer inbound files were delayed | Service outage & misalignment of MPRNs in 'Reads Insight' dashboard | Data Discovery Platform (DDP) | Shippers & Networks | A processing issue in the DDP tool caused a misalignment in MPRN data | 2/27/2020 | 3/9/2020 | Closed | Incident raised at 16:51, resolved following full refresh of data on 09/03/2020 |
175 | Closed | 1079076 | N/A | 61699 62133 62379 |
N/A | Data displayed incorrectly within DES | Customers unable to retrieve up to date details from Data Enquiry, however data can be found via the Data Search Line. | 61699: When there are updates made in the system for 'Meter location', 'Meter Mechanism Code' and 'Gas Act Owner', the data is not being correctly updated in Data Enquiry, and is showing the previous values. 62133: 'Meter capacity' field within DES is displaying as blank for meter points 62379: Incorrect transporter details are being displayed within DES for IGT sites following Gas transporter change of ownership. |
Data Enquiry System (DES) | All Customers | TBC | 3/5/2020 | Sep-20 | Closed | Defect 61699: Deployed 8th May 2020 Defect 62133: Deployed 7th August 2020 Defect 62379: Deployed 7th August 2020 |
|
176 | Closed | 1104986 | P2 | N/A | N/A | Delay in processing inbound files | Customer inbound files were delayed | There was a delay in processing inbound files for a number of customers due to connectivity issues between UK Link and EFT | UK Link | All customers | Following a refresh of the UK Link file transfer system, an incorrect configuration resulted in files being incorrectly routed to an different environment. | 3/16/2020 | 3/16/2020 | Closed | Incident raised at 14:34, resolved at 18:20 | |
177 | Closed | 1105842 | P2 | N/A | N/A | Demand Attribution values published were high due to system issue | Shippers would be using incorrect / unrealistic NDM Nomination values | Due to a system issue on 19th March, the 08:00 Forecast CWV values for Gas Days 19th and 20th March 2020 used in the morning’s NDM Nominations run were incorrect resulting in unrealistic NDM Nomination values. The 12:00 Forecast CWV values were calculated correctly and used in the 13:00 NDM Nominations run which resulted in more realistic NDM Nomination values being displayed. | Gemini | Shippers | A weather file transferred from UK Link contained zero values. Root cause unknown and being investigated. | 3/19/2020 | 3/19/2020 | Closed | Incident raised at 10:57, resolved at 14:04 | |
178 | Closed | 1106922 | P2 | N/A | N/A | Performance issues with Service Desk Plus | Customers unable to perform any actions in the system | Customers unable to log / track tickets within Service Desk Plus application. | Service Desk Plus | All customers | The root cause is unknown and being investigated by Xoserve support teams and the support vendor. | 3/24/2020 | 3/24/2020 | Closed | Incident raised at 10:17, resolved at 12:11. | |
179 | Closed | 1106982 | P2 | N/A | N/A | Performance issues with Service Desk Plus | Customers unable to perform any actions in the system | Customers unable to log / track tickets within Service Desk Plus application. | Service Desk Plus | All customers | Incoming calls to the service desk number were not being forwarded to the analysts due to a BT telephony portal issue. | 3/27/2020 | 3/27/2020 | Closed | Incident raised at 07:00, resolved at 08:16. | |
180 | Closed | 1110826 | P2 | N/A | N/A | Performance issues with Data Enquiry Service | Limited connectivity to DES for customers | Performance issues with the Data Enquiry Service due to a delay of processing internal files within the system. | Data Enquiry Service (DES) | All customers | The file transfer system became unresponsive and stopped sending files. Root cause unknown and being investigated | 4/2/2020 | 4/2/2020 | Closed | Incident raised at 01:00, resolved at 04:15 | |
181 | Closed | 1113261 | P2 | N/A | N/A | Users unable to access Gemini | Customers unable to access or perform any operations in Gemini | Following the implementation of 'RFC:10117 - Gemini Spring 2020 Release (Contingency)', a technical issue was identified with the deployment. As a result, Gemini was unavailable for customers whilst this was being investigated. | Gemini | All customers | A project change on Gemini was unable to be implemented correctly and the backout plan was instigated | 4/5/2020 | 4/5/2020 | Closed | Incident raised at 05:39, resolved at 06:30 | |
182 | Closed | 1113834 | P2 | N/A | N/A | Shippers unable to process nominations in Gemini | Customers unable to process nominations for decreasing quantity following implementation of Gemini Spring 2020 Release. Workaround in place to process the nominations. | Following the implementation of Gemini Spring 2020 Release, nominations were not getting completed for shippers when the nomination quantity had been decreased in Gemini. Workaround was however in place to process all nominations that were affected. | Gemini | Shippers | An incorrect project deployment and a design flaw caused nomination locks and incorrect allocated values | 4/6/2020 | 4/6/2020 | Closed | Incident raised at 01:30, resolved at 02:00 | |
183 | Closed | 1114066 | P2 | N/A | N/A | Performance issues with CMS | Limited connectivity to CMS for all customers | Performance issues with CMS | CMS | All customers | High levels of database activity prevented new connections from being made and is currently being investigated | 4/6/2020 | 4/6/2020 | Closed | Incident raised at 12:20, resolved at 14:30 | |
184 | Closed | 1115266 | P2 | N/A | N/A | Users unable to access Gemini | Customers unable to access or perform any operations in Gemini | Due to a high number of jobs running in the system, Gemini was unavailable for customers for 19 minutes. | Gemini | All customers | A high number of database transactions prevented any new connections from being made. Root cause being investigated | 4/10/2020 | 4/10/2020 | Closed | Incident raised at 02:10, resolved at 03:02 | |
185 | Closed | 1116573 | P2 | N/A | N/A | Users unable to access Gemini | Customers unable to access or perform any operations in Gemini | Gemini application was inaccessible for all customers due to a database server being down. As a result, Shippers would not have been able to place nominations during this period. | Gemini | All customers | A Gemini database server became unresponsive due to a memory overflow. Root cause unknown and being investigated | 4/14/2020 | 4/15/2020 | Closed | Incident raised at 23:11, resolved at 02:21 | |
186 | Closed | 1100348 | N/A | 61941 62185 |
N/A | Issues with reconciliation process | Reconciliation charges may be incorrect | 61941: Reconciliation process is working incorrectly, between check to check reads due to the system being unable to provide the correct consumption and energy for the billable device exchange date. 62185: Following the implementation of a change request, which relates to updating an LDZ. An incorrect final transfer read (FINT) is being updated in the system. |
Reconciliation | Shippers & Networks | Analysis ongoing | 3/5/2020 | Aug-20 | Closed | Defect 61941: Deployed 3rd July 2020 Defect 62185: Deployed 7th August 2020 |
|
187 | Closed | 1121112 | P2 | N/A | N/A | Demand Attribution not published for 21 hour bar | No impact to customer as contingency activities was sucessfully undertaken. | The scheduled job to show the Demand Attribution values for 21st hour bar did not succesfully run. | Gemini processes | All Shippers | Late file delivery from National Grid systems delayed processing within Gemini | 4/24/2020 | 4/24/2020 | Closed | Incident raised at 22:02, resolved at 23:07 | |
188 | Closed | 1122743 | P2 | N/A | N/A | Delay in processing inbound files | Customer inbound files were delayed | There was a delay in processing inbound files for a number of customers due to connectivity issues between UK Link and EFT | UK Link | All Customers | There was intermittent connectivity issues observed between the file transfer service and application servers | 4/30/2020 | 4/30/2020 | Closed | Incident raised at 16:59, resolved at 20:53 | |
189 | Closed | 1123482 | P2 | N/A | N/A | Demand Attribution not published for 12am | Shippers will not be able to see the latest value of Demand Attribution at 12 AM | Demand Attribution was not published for 12am hour for gas day 1st and 2nd May | Gemini processes | All Shippers | Late file delivery from National Grid systems delayed Demand Attribution processing within Gemini. | 5/2/2020 | 5/2/2020 | Closed | Incident raised at 01:36, resolved at 02:39 | |
190 | Closed | 1125503 | P2 | N/A | N/A | Demand Attribution not published for 16th hour | Shippers will not be able to see the latest value of Demand Attribution | Demand Attribution was not published for 16th hour for gas 7th and 8th May | Gemini processes | All Shippers | Late file delivery from National Grid systems delayed Demand Attribution processing within Gemini. | 5/7/2020 | 5/7/2020 | Closed | Incident raised at 14:49, resolved at 17:30 | |
191 | Closed | 1125621 | P2 | N/A | N/A | EU nominations will not be confirmed in Gemini | Files could not be processed in Gemini affecting EU Gas Nominations | Files could not be processed in Gemini meaning EU Gas Nominations could not be confirmed for GNI TSO. No issue with IUK or BBL TSO. | Gemini processes | All Shippers | The offshore partner had implemented an infrastructure configuration change without interaction or notification to Xoserve, leading to an inability to transmit files into Gemini. | 5/7/2020 | 5/7/2020 | Closed | Incident raised at 22:20, resolved at 23:00 | |
192 | Closed | 1126124 | P2 | N/A | N/A | Electronic File Transfer (EFT) Application disconnected | Electronic File Transfer (EFT) Application disconnected from the production environment | EFT disconnected from the production system impacting incoming & outgoing files to customers & Gemini. This impacted Gemini process and there was a delay in publishing the Line for 19th,20th 21st and 22nd hour bar and has been published at 22:20 | All processes | All Customers | During a project change a software fault was encountered during a network device configuration update causing the loss of connectivity. | 5/9/2020 | 5/7/2020 | Closed | Incident raised at 19:42, resolved at 21:30 | |
193 | Closed | 1127568 | P2 | N/A | N/A | Demand Attribution not published for 5th & 6th hour | Shippers will not be able to see the latest value of Demand Attribution | Demand Attribution was not published for 5th & 6th hour for gas day 10th May | Gemini processes | All Shippers | During a project change to rectify a network device software fault (1126124) issues were encountered during the upgrade causing loss of connectivity. | 5/10/2020 | 5/10/2020 | Closed | Incident raised at 06:19, resolved at 08:55 | |
194 | Closed | 1131627 | P2 | N/A | N/A | Line pack not published for 0 and 1st hour bar. | Shippers would not be able to see the line pack details in Gemini system. | Line pack not published for 0 and 1st hour bar due to connectivity issue between EFT and Gemini FX and Control-M EM. However the UK Link, Gemini and CMS system were available during the issue. | Gemini processes | All Shippers | Unknown issues caused a loss of connectivity. Xoserve teams are working with network supplier to understand the root cause. | 5/19/2020 | 5/19/2020 | Closed | Incident raised at 00:47, resolved at 02:50 | |
195 | Closed | 1124866 | N/A | N/A | N/A | XCE1889 | Delay in the notification of transfer of IGT to Shippers | Shippers will be holding the incorrect IGT for their CSEP meter points following a transfer of IGT effective on 1st May 2020. | A notification to Shippers advising of the MPRNs transfering IGTs (STN file) was not issued for all affected MPRNs. The file was issued however a number of MPRNs were not included in the file. | All processes | All Shippers | Under analysis. Record 2591 raised to investigate. | 5/5/2020 | 5/28/2020 | Closed | Communication sent to impacted Shippers and the file issued containing the missed records. |
196 | Closed | 1132344 | N/A | 63026 | N/A | XCE1890 | Contact Details for LSP sites not being end dated in UKLink following transfer of ownership. | Shipper: UKLink may hold incorrect customer contact details for MPRNs IGTs/DNs: Portfolio updates will contain the incorrect details |
Customer contact details are provided by the registered Shipper of large supply points. These are recorded in UK Link and sent onto Gas Transporters. When an outgoing Shipper has provided customer contact data (emergency or end user details) for a large supply point (S38 record), and the incoming Shipper of the meter point does not update customer contact details (S66 record) within the confirmation file (CNF), the historic contact details are not being end dated, and therefore being incorrectly retained in the system. 2,903 meter points have been affected by this issue across the industry |
Supply Point Updates | All Customers | System functionality does not end date customer contact details for LSP following a transfer of ownership. | 5/27/2020 | end of July 2020 | Closed | System fix implemented 27th June 2020. Monitoring of the files will take place to ensure updates are applied correctly & issued in reports correctly. |
197 | Closed | 1139534 | P2 | N/A | N/A | Connectivity issue with Xoserve Portal | Customers were unable to access the Xoserve portal & Gemini | Customers trying to place EU Nominations on Gemini would have been unable to, DES users would have been unable to access their portfolio information and some customer would not have been able to log tickets via the Service Desk portal. | Xoserve Portal | All Customers | Internet Service issues | 6/9/2020 | 6/9/2020 | Closed | Incident raised at 01:40, resolved at 02:30 | |
197 | Closed | 1085669 | N/A | 61491 | N/A | Incorrect data sent within AAQ file | Customers receiving incorrect information relating to their meter points | When the exit zone / LDZ is being changed for a future date, the incorrect meter ID and exit zone details are being sent in the AAQ file | Gemini | Shippers & Networks | Analysis ongoing | 2/21/2020 | TBC | Closed | Defect 61491: Deployment 3rd July 2020 | |
198 | Closed | 1140025 | P2 | N/A | N/A | Connectivity issue with EFT and IX | Customers will be unable to send or receive files. | File transfer services across the IX network stopped working. File delivery & receipt were delayed. | IX and EFT | All Customers | Due to issues occurring during a supplier’s planned maintenance activity, approximately 40% of connections on the IX network were unavailable. | 6/9/2020 | 6/9/2020 | Closed | Incident raised at 04:46, resolved at 05:30 | |
198 | Closed | 1095021 | N/A | 61864 | N/A | Incorrect details stored following transfer of ownership | Old contact details are being held in the system, however workaround is in place | When a new confirmation request is received for a Shared Supply Meter Point (SSMP), the previous emergency contact details are being incorrectly retained in the system, and associated to the incoming Shipper | Transfer of Ownership | Shippers | Analysis ongoing | 3/18/2020 | TBC | Closed | Defect 61864: Deployed on 2nd October 2020 | |
199 | Closed | 1109923 | N/A | 62186 62464 62541 |
N/A | Issues following confirmation of a site | Incorrect details are being associated to meter points in UK Link | 62186: Following a class change from a 1 to 2, 3 or 4, the Daily Meter Service Provider (DMSP) service type is not being end dated in the system, following a re-confirmation / class change 62464: Following confirmation of a site, the outgoing Shipper nomination reference is being incorrectly populated within the Daily Data Logger Readings File (MDR) 62541: Confirmation requests for class 2 sites are being accepted even if the requested SOQ/SHQ ratio is not between 4 to 16. These requests should have been rejected with code DSO00012. |
Confirmation process | Shippers | Analysis ongoing | 4/17/2020 | Aug-20 | Closed | Defect 62186: Deployed on 7th August 2020 Defect 62464: Deployed 6th November 2020 Defect 62541: Deployed on 7th August 2020 |
|
200 | Closed | 1115137 | N/A | 62431 62840 |
N/A | Issues with Network reports | Missing details from customer reports | 62431: MPRNs missing from GSR Portal Report (MOD518) which was issued in January 2020 62840: Gas Safety Regulation (GSR) report is being issued to customers with the previous Shipper name rather than the latest, however it is displaying the correct short code. |
Reporting | Networks | Analysis ongoing | 5/20/2020 | Sep-20 | Closed | Defect 62186: Deployed 7th August 2020 Defect 62840: Deployed 11th September 2020 |
|
201 | Closed | 1114415 | N/A | 62486 | N/A | Issues with Shipper files | Weather variance Correction file (AWV and FWV) are not being rejected when the field length within the file is exceeded. | Shipper files | Shippers | Analysis ongoing | 5/27/2020 | 8/7/2020 | Closed | Defect 62486: Deployed 7th August 2020 | ||
202 | Closed | 1124577 | N/A | 62491 | N/A | Issues with capacity invoice | Invoice charge types missing from invoice | The ECN charge type is not being displayed on the capacity invoice | Invoicing | Shippers | Analysis ongoing | 5/28/2020 | 8/7/2020 | Closed | Defect 62491: Deployed 7th August 2020 | |
203 | Closed | 1063617 | N/A | 62774 | N/A | Issues with submitting contacts in CMS | Customers are unable to raise consumption adjustments for SSMPs | Shippers are unable to log a Daily Metered Query (DMQ) Contact for Shared Supply Meter Points in CMS | CMS | Shippers | Analysis ongoing | 6/18/2020 | 9/4/2020 | Closed | Defect 62774: Deployed 3rd September 2020 | |
205 | Closed | 1138250 | P2 | N/A | N/A | within-day auctions on Gemini not scheduled for Gas Day 5th June. | Shippers were unable to view and participate within auctions for the 5th and 6th hour bars. | A system account password had expired ahead of its scheduled expiry period preventing connectivity. The system password was reset to restore product connectivity. The fault was due to a known error within the current software, which has now been upgraded. | Gemini | All Customers | A system account password had expired ahead of its scheduled expiry period preventing connectivity. | 6/4/2020 | 6/4/2020 | Closed | Incident raised at 18:44, resolved at 20:49 | |
206 | Closed | 1142287 | P2 | N/A | N/A | Connectivity to internet facing services was unavailable for 49 minutes. | Customers would have had issues submitting EU Nominations to Gemini. Checking portfolio information via DES and UK Link and logging fault tickets via Service Desk portal would also have been unavailable. | Access to Gemini, DES & service desk portal unavailable for customers. | Gemini | All Customers | A fault occurred on a suppliers internal network hardware device. | 6/16/2020 | 6/16/2020 | Closed | Incident raised at 00:30, resolved at 01:09 | |
207 | Closed | 1144309 | P2 | N/A | N/A | Connectivity issue with Gemini | Users unable to log into Gemini | Gemini users were facing intermittent connectivity issues while accessing Gemini from 04:29 to 05:29. | Gemini | All Customers | Our network supplier identified that traffic was intermittently being rerouted between primary and secondary connections. | 6/22/2020 | 6/22/2020 | Closed | Incident raised at 16:29, resolved at 17:29 | |
208 | Closed | 1145360 | P2 | N/A | N/A | Issues with Gemini file flows | Gas flow and Invoicing charges would be impacted/inaccurate | Gemini file flow impacted due to Gemini B2B certificate renewal failure. | Gemini | All Customers | During an update to a security certificate a fault was encountered that meant connections could not be made to customer’s certificates. | 6/25/2020 | 6/25/2020 | Closed | Incident raised at 11:22, resolved at 14:26 | |
209 | Closed | 1147359 | P2 | N/A | N/A | Delay in processing CNC and CNF files | Delay in customer receiving response files | New CNC, CNF file formats were not correctly processed by the system causing a delay processing times. | SPA - Confirmation process | Shippers | Old file formats were not flushed from the system when the new formats were applied. | 6/28/2020 | 6/28/2020 | Closed | Incident raised at 14:30, resolved at 18:30 | |
210 | Closed | 1142812 1142824 |
N/A | 62858 62859 62860 |
N/A | XCE1885 XCE1887 |
Issues with IGT Site Transfer Files (STN) | Files contain incorrect sequence of information | Defect 62858: Where there is a change to a Transporter, and a Shipper transfer is undertaken for an MPRN, the Transfer of Ownership file (TRF) issued to the incoming shipper does not contain the correct Transporter details. The Q44 record in the file is displaying the previousTransporter details. Defect 62859: Following a Transporter takeover relating to multiple sites, the STN file generated does not associate the correct MPRNs under the U76 csep record. As a rsult, the MPRN to CSEP combination is incorrect in the STN file. Defect 62860: Following an IGT site transfer for Greenfield sites, the Confirmation of Shipper Registration File (SSR) for first time confirmed sites are going to the previous IGT instead of the new IGT. |
IGT Transfer | All Customers | Incorrect system functionality & processing of files folloring an IGT change | 6/26/2020 | 9/4/2020 | Closed | Defect 62858: Deployed 4th September 2020 Defect 62859: Deployed 18th September 2020 Defect 62860: Deployed 4th September 2020 |
211 | Closed | 1150262 | P2 | N/A | N/A | Connectivity issue with the Contact Management Service (CMS) | Customers unable to access CMS | CMS Services were unavaliable to customers due to Internet connectivity issues. | CMS | All Customers | TBC | 7/3/2020 | Closed | Incident raised at 15:32, resolved at 15:47 | ||
212 | Closed | 1154603 | P2 | N/A | N/A | Connectivity issue with the Contact Management Service (CMS) | Customers unable to access CMS | CMS Services were unavaliable to customers due to Internet connectivity issues. | CMS | All Customers | TBC | 7/9/2020 | Closed | Incident raised at 12:28, resolved at 12:42 | ||
213 | Closed | 1153333 | P2 | N/A | N/A | Blank screen following logon to Gemini | Customers unable to access or perform any operations in Gemini | When users logged into Gemini they were unable to perfom any operations as screen was blank. | Gemini | All Customers | TBC | 7/6/2020 | Closed | Incident raised at 18:05, resolved at 23:42 | ||
214 | Closed | 1156418 | P2 | N/A | N/A | Gemini application unavailable | Customers unable to access or perform any operations in Gemini | Gemini application not available following maintenance activities | Gemini | All Customers | TBC | 7/14/2020 | Closed | Incident raised at 04:32, resolved at 11:00 | ||
215 | Closed | 1161421 | P2 | N/A | N/A | Demand Attribution and line pack has not been published from 22nd July 21 Hour Bar. | Shippers would not be able to see the line pack details in Gemini system. | Demand Attribution and line pack has not been published from 22nd July 21 Hour Bar. | Gemini | All Customers | TBC | 7/22/2020 | Closed | Incident raised at 21:51, resolved at 06:49 | ||
216 | Open | N/A | N/A | N/A | N/A | XCE1891 XCE1898 XCE1940 XCE1955 |
Incorrect winter consumption calculation for a number of Meter Point Reference Numbers (MPRNS). | Gas Allocations could be incorrect from 1st October 2022. Supply Offtake Quantity (SOQ) values sent in the September .NRL (to be effective 1st October 2022) will potentially be incorrect. Affected MPRNs could be placed into the incorrect EUC band |
An issue was identified with a small number of Winter Consumption calculations whereby the value issued in the May release of the .NRL files (T50 record) is overstated. This is due to the calculation incorporating the energy generated by Meter Reads, and the reconciled energy following a check to check Site Visit read. | AQ process | Shippers | This was due to the sites transferring ownership over the winter period and the new Shipper not having access to the historical consumption data to derive a new value and submit a correction. | 6/5/2020 | Enduring fix implementation date | In Progress | For the affected MPRNs, impacted Shippers have been requested to raise a Winter Consumption correction (.AQI file using Reason Code 5) to apply or amend the proposed WC value. MPRN details which require Winter Consumption corrections was submitted via comms on 29th June 2022 (For Action XCE1955: Incorrect Winter Consumption Calculation). Monitoring will continue annually until enduring fix is implemented. |
217 | Closed | N/A | N/A | N/A | N/A | XCE1886 XCE1897 |
Unresolved System Exceptions (MN09) | Reconciliations are being held | MN09 is raised following receipt of a Site Visit Read/Check Read for Class 4 meter points where the prevailing volume is zero. | Reconciliation | Shippers & Networks | Exception raised but unable to resolve and process reconciliations. | 12/1/2019 | Sep-20 | Closed | 1. For MN09 exceptions due to reconciliation unable to process the Check Read reconciliation where zero volume recorded; comme issued on 14th July & 28th July 2020 & discussed at DSG on 22nd June 2020 & 27th July 2020 providing resolution options for clearance of the backlog until the change is implemented. 2. Comms issued 28th July requesting customers to notify us if they object to the preferred option. 3. Comms to be issued 7th August providing next steps to customers. 4. Comms issued on 14th August providing next steps & plan. Adjustments to be issued during September and October. This will continue until enduring solution is implemented. |
218 | Closed | N/A | N/A | N/A | N/A | XCE1895 | Updates issued are rejecting incorrectly: CON & BRO updates. | Updates not being applied in UKLink & not being issued to DNs & IGTs via daily portfolio update files | Following implementation of XRN 4850 an issue had been identified when the Customer Amendment file (CNC) was being sent to UKLink with both ‘CON’ and ‘BRO’ update sent within the same file and processed at the same time in UKLink. One of the records (BRO or CON) is accepted, and the other is rejected with reason code CTT00032 error | SPA - Supply Point Updates | Shippers & Networks | Incorrect functionality applied as part of the implementation of XRN 4850 | 7/7/2020 | Jul-20 | Closed | Code fix was successfully implemented on Saturday 4th July 2020. Any updates received from 4th July 2020 will be correctly processed For all records that were incorrectly rejected from 27th June (implementation of the change) until the fix was implemented (3rd July as this is the last processing date prior to the fix being implemented), all affected MPRNs have been identified and issued to impated Shippers on 7th July 2020 requesting they re-submit the updates |
219 | Closed | N/A | N/A | N/A | N/A | XCE1893 | Missing data within the Data Discovery Platform (DDP) | One third of portfolio data has not been loaded into Birst and is therefore unavailable for Shippers to view via DDP | One third of Shipper read performance data has not been loaded into DDP, this has materiality fell between a 1-5% positive or negative shift across all Shippers. April’s Read Performance figures for Class 3 MPRNs in DDP were impacted | Data Discovery Platform (DDP) | Shippers & Networks | On 15th May 2020, one of the jobs failed to run, which resulted in some data not loading Birst | 16th June 2020 | Closed | Successful implementation of the fix on 15th June, the data will be corrected in DDP and visible from 16th June 2020 | |
220 | Closed | 1163278 | P2 | N/A | N/A | File not received in Gemini impacting EU nominations | EU nominations in Gemini for 23rd and 24th July impacted. | Files not received in Gemini impacting EU Nominations for 23rd & 24th July 2020 | EU Nominations | TSO | 7/23/2020 | 7/23/2020 | Closed | Raised at 12:37, resolved at 16:35 | ||
221 | Closed | 1164038 | P2 | N/A | N/A | Demand Attribution and Auction process in Gemini is not published for 15 hr bar. | Nominations will not be confirmed | Demand Attribution and Auctions is not published for 15th hour bar and will have financial impacts for the Shippers. | Gas Nominations | Shippers | 7/24/2020 | 7/24/2020 | Closed | Raised at 14:48, resolved at 18:26 | ||
222 | Closed | 1166416 | P2 | N/A | N/A | CMS unavailable for users | Unable to access CMS | EU Nominations and Prisma Auctions are delayed due to connectivity issue. Both internal and external users are unable to access screens. CMS application is not accessible for both internal or external users | CMS | All Customers | 7/28/2020 | 7/28/2020 | Closed | Raised at 12:30, resolved at 14:30 | ||
223 | Closed | N/A | N/A | N/A | N/A | XCE1903 | Reasonable Endeavour (REDs) invoice issued as a Debit insead of a Credit invoice to Shippers | Shippers have received debit invoice instead of a credit. DNs have received a credit invoice when it should be a debit. | Following implementation of Nexus in June 2017, the charge type (846) was amended to allow for a debit charge to be issued where the credit was issued in error, although this is rare this was to future proof the design of the system. Since Nexus go live and all valid claims since June 2017 have been issued incorrectly as debits instead of credits. | Theft of Gas | Shippers & Networks | 7/30/2020 | 8/31/2020 | Closed | Report will be issued notifying all impacted customers of the claims invoiced incorrectly. The reversal of the charges & credit invoices will be issued end of August 2020. Adjustments issued. | |
224 | Closed | 1172529 | P2 | N/A | N/A | Demand Attribution and line pack has not been published for 14th August 2020 11 Hour Bar. | Shippers would not be able to see the line pack details in Gemini system. | Demand Attribution and line pack has not been published from 14th August 2020 11 Hour Bar. | Gemini | All Customers | TBC | 8/14/2020 | 8/14/2020 | Closed | Incident raised at 11:29, resolved at 11:34 | |
225 | Closed | 1175112 | P2 | N/A | N/A | CMS unavailable for users | Customers unable to access CMS | Slowness within CMS application which resulted in being unavailable for both internal and external users | CMS | All Customers | 8/20/2020 | 8/20/2020 | Closed | Incident raised at 11:55, resolved at 18:20 | ||
226 | Closed | N/A | N/A | N/A | N/A | XCE1906 | Early issue of Supporting Information Files (ASP) for the Amendment Invoice | The ASP file issued on the 24th August should not be processed as it has the wrong sequence numbers and may not be complete (due to the ASP mismatch file merge activities not being completed) | A manual error has resulted in the simulated Amendment invoice supporting information files (ASP) being issued earlier than scheduled, on the 24th August rather than the scheduled date of 26th August 2020. | Invoice - Amendment | Shippers | 8/24/2020 | 8/26/2020 | Closed | The ASP files from the UK Link Production system scheduled to be issued on 26th August 2020 will resolve the issue. | |
227 | Closed | 1177166 | P2 | N/A | N/A | IX - Connectivity Issue | Inbound and outbound files zare not being delivered via IX. Shippers have been unable to access Gemini application via Citrix. However, they will be able to connect using XP1 token |
EFT unable to connect to a number of sites and therefore unable to process any inbound and outbound files for affected sites. No access to Gemini |
IX & Gemini | Shippers | 8/25/2020 | 8/26/2020 | Closed | Incident raised at 14:37, resolved at 01:01 | ||
228 | Closed | 1178023 | P2 | N/A | N/A | Gemini application issue | Nominations will not be carried out for TSOs | Gemini would not be able to send DELORD files to the TSOs until issue resolution | Gemini | Shippers | 8/26/2020 | 8/26/2020 | Closed | Incident raised at 07:24, resolved at 10:11 | ||
229 | Closed | 1178895 | P2 | N/A | N/A | XCE1907 | Performance issues with CMS | Limited connectivity to CMS for some customers | Users experiencing performance issues within CMS | CMS | All customers | 8/28/2020 | 8/28/2020 | Closed | Incident raised at 08:59, resolved at 09:20 | |
230 | Closed | 1179270 | P2 | N/A | N/A | Gemini application unavailable via Citrix | Nomination and other activities cannot be carried out by shippers who does not have XP1 token | Gemini users are not able to access Gemini application through citrix | Gemini | Shipppers | 8/29/2020 | 8/29/2020 | Closed | Incident raised at 08:50, resolved at 15:25 | ||
231 | Closed | 1179970 | P2 | N/A | N/A | Gemini application issue | Nominations will not be carried out for TSOs | Gemini would not be able to send DELORD files to the TSOs until issue resolution | Gemini | Shippers | 9/1/2020 | 9/2/2020 | Closed | Incident raised at 14:57, resolved at 00:42 | ||
232 | Closed | 1181315 | P2 | N/A | N/A | Files not issued to Gemini | EU nominations have not been confirmed | file flow for GNI and BBL is not affected. GNI and BBL have confirmed that have not observed any issues. | Gemini | Shippers | 9/6/2020 | 9/6/2020 | Closed | Incident raised at 00:05, resolved at 02:55 | ||
233 | Closed | 1182455 | P2 | N/A | N/A | Gemini application issue | Shippers & NG unable to access Gemini | EU Nominations would not be confirmed for the shippers. | Gemini | Shippers | 9/6/2020 | 9/6/2020 | Closed | Incident raised at 01:37, resolved at 03:30 | ||
234 | Closed | N/A | N/A | N/A | N/A | XCE1911 | Meter asset details sent prior to transfer of ownership notification files | Shippers received asset details prior to the transfer of ownership notification files | The Meter Reading Access Instruction Notification File: MRI issued on 10h September 2020 was sent before the Supply Meter Point Ownership Notification File (.TRF). | Transfer of Ownership | Shippers | This occurred due to the a job being held in order to ensure all the TRF files were processed prior to the MRI job commencing (we see a larger volume of on a Thursday) When the request to hold the job was received, an error occurred where an adhoc instance was triggered, this was quickly identified and the job was held, unfortunately 9 TRF files were processed in this time | 9/10/2020 | 9/10/2020 | Closed | Communication sent on 11/09/20 to Shippers to advise |
235 | Closed | 1184427 | P2 | N/A | N/A | Gemini application issue | A number of shippers were unable to access citrix to login into the Gemini application | Applications issues for Shippers due to connectivity issues | Gemini | Shippers | 9/15/2020 | 9/15/2020 | Closed | |||
236 | Closed | N/A | N/A | N/A | N/A | XCE1912 | Files incorrectly being rejected by system | Shippers were incorrectly receivng ‘File not eligible for the sender’ exception. | four Shipper details were missing within the system. As a result, rejection files (.FRJ) were processed back to the Shippers when they should have been accepted. | SPA | Shippers | Post a change deployment on Wednesday 16th September, an issue was identified whereby a small number of files were failing with a ‘File not eligible for the sender’ exception. | 9/16/2020 | 9/17/2020 | Closed | Reprocessed all affected files and response files on16th September 2020 and notified customers on 17/09/20 |
237 | Closed | 1186606 | P2 | N/A | N/A | Shippers able to see the menu options in Gemini which they should not be able view. | None | Screens available to Shippers, no sensitive data available via screens. | Gemini | Shippers | 9/23/2020 | 9/23/2020 | Closed | Incident raised at 16:21, resolved at 22:20 | ||
238 | Closed | 1188566 | P2 | N/A | N/A | Entry Capacity not published in Gemini | Shippers unable to view bid data. | Bid information not avaialble on Shippers primary screens | Gemini | Shippers | 10/1/2020 | 10/1/2020 | Closed | Incident raised at 07:05, resolved at 22:20 | ||
239 | Closed | N/A | N/A | N/A | N/A | XCE1913 XCE1918 |
Conflicting data provided in NRL Files | In the NRL files for the month of September (Effective 1st October 2020), shippers would of received incorrect information relating to MPRNs. Therefore incorrect informstion was held in there system. | In a small number of instances two T04 records were provided for the same MPRN with conflicting information within the AQ Notification file. | AQ | Shippers | 9/25/2020 | 9/25/2020 | Closed | Customers were notified on 25th September 2020, | |
240 | Closed | N/A | N/A | N/A | N/A | XCE1914 | Data discrepancy with Daily Delta Files | The Daily Delta files (EDL,EWS and IDL) that was sent to Networks between 20th and 24th September 2020 did not contain the correct PSR data for a number MPRNs. | Priority Services Register (PSR) data is not being recorded in UKLink and not being sent in the Daily delta files | SPA | Networks/ IGTs | The issue occurs where Customer Amendment file (CNC) and Broadcast Contacts (BRO) updates are received in the same request | 9/30/2020 | 9/30/2020 | Closed | PSR updates were re-processed and sent in daily delta files on 2nd October 2020 |
241 | Closed | 1187159 | N/A | 63871 | N/A | XCE1915 XCE1918 |
Incorrect data sent within the T97 record of the September 2020 AQ notification file (NRL) | Shippers have received incorrect data within the T97 record of the NRL files for the month of September (Effective 1st October 2020) Customers have been notified that an MPRN is eligible for DN interruption and or priority consumer incorrectly. |
The DNO_INT_TRESHOLD and PRIORITY_CONSUMER flag were populated incorrectly on T97 record in the .NRL file. | AQ process | Shippers | 9/30/2020 | Closed | Customers were notified on 25th September 2020, Future AQ calculations will correct this position and customers will be notified of the correct Correction Factor requirements at that point. | ||
242 | Open | N/A | N/A | N/A | N/A | XCE1917 XCE1947 |
Missing EUC values for 1st October 2020 Missing EUC values for 1st October 2021 |
For affected sites the incoming Shipper has not received the updated EUC values effective 1st October . | The incoming Shipper has not been notified of the new End User Category (EUC) values for 1st October (in either of the AQ Notification files (.NRL) or Transfer of Ownership notification (.TRF file) where the Confirmation effective date is between the 25th and 30th September 2020 / 2021 | Transfer of Ownership | Shippers | 6/1/2017 | In Progress | Change Request ‘XRN4978 – Notification of Rolling AQ value (following transfer of ownership between M-5 and M)’ has been raised to automate this process for the annual EUC Review. Monitoring will continue & customers notified monthly until fix is implemented. | ||
243 | Closed | N/A | N/A | N/A | N/A | XCE1918 | Correction Factor Flag not populated in the AQ notification file | Customers were notified that an MPRN does not require a Correction Factor update, when an update is required. | The monthly AQ process notifys Shippers if an MPRN requires a Correction Factor to be applied where the revised AQ exceeds 732,000 kWh. For an number of sites the flag was not populated correctly in the October notification file. | AQ Notification | Shippers | 10/8/2020 | 10/8/2020 | Closed | Future AQ calculations will correct this position and customers will be notified of the correct Correction Factor requirements at that point. | |
244 | Closed | N/A | N/A | N/A | N/A | XCE1918 | Application of End User Categories (EUC) | MPRNs will attract the wrong daily gas allocation profile and the wrong Peak Load Factor which calculates SOQ and therefore will have some slight incorrect capacity charges. | 4,946 MPRNs were incorretly allocated to EUC Band 02 and have been assigned to the wrong EUC within that Band with effect from 1 October 2020. This means the MPRNs will attract the wrong daily gas allocation profile and the wrong Peak Load Factor which calculates SOQ and therefore will have some slight incorrect capacity charges. | AQ Notification | Shippers | 10/8/2020 | 11/1/2020 | Closed | Correction will be applied with effect from 1st November 2020. The corrected EUCs will be visible in the monthly AQ Notification files provided in October 2020. These sites will continue to see very small errors in their daily gas allocation, of a similar order to the impacts for October 1st. Reconciliation will correct the energy position and UIG. Capacity charges for the October 2020 period will be corrected and invoiced separately in November 2020. | |
245 | Closed | INC0010673 | P2 | N/A | N/A | Issue raising service desk tickets via telephone | Customers unable to log service desk ticket via telephone | Service Desk- Unable to reach Xoserve Service Desk number on options 1 and 3. | Service Desk Plus | All Customers | 10/12/2020 | 10/12/2020 | Closed | Incident raised at 04:11, resolved at 07:15 | ||
246 | Closed | N/A | N/A | N/A | N/A | XCE1920 | Issue relating to Composite Weather Variable calculation | Annual Quantities (AQs) calculated in WM LDZ are using an inaccurate CWV (Issue 1 only) |
The CWV calculation for West Midlands (WM) LDZ has used Solar Radiation observations from the wrong weather station. Following the recent changes to the CWV formula as part of this year’s Seasonal Normal Review, it was agreed that Coleshill weather station should be the source for Solar Radiation observations, unfortunately our WSP has, incorrectly, provided the observations from Birmingham Winterbourne (the source station for Temperature). Period impacted 1st May 2020 to 15th October 2020. NDM Allocation only impacted from 1st to 15th October 2020 which is when the CWV formula officially changed to include a Solar Radiation term. | AQ | All Customers | 11/6/2020 | In Progress | |||
247 | Closed | N/A | N/A | N/A | N/A | XCE1920 | Issue relating to Composite Weather Variable calculation | Daily NDM Allocation and Gas Nominations have used an inaccurate CWV for Gas Days 1st October 2020 to 15th October 2020 for WM only (Issue 1) and Gas Days 24th October to 4th November 2020 for all LDZs (Issue 2) | All weather data provided to Xoserve since the recent clock change at the end of October has not been adjusted to reflect the move from British Summer Time (BST) to Greenwich Mean Time (GMT) meaning the CWVs calculated for all LDZs have been impacted. Period impacted 24th October 2020 to 4th November 2020. | AQ process | All Customers | 11/6/2020 | Closed | |||
248 | Closed | INC0025037 | P2 | N/A | N/A | Demand Attribution and Auction process in Gemini is not published for 16 hr bar. | Nominations will not be confirmed | Demand Attribution and Auctions is not published for 16th hour bar and will have financial impacts for the Shippers. | Gas Nominations | Shippers | 11/22/2020 | 11/22/2020 | Closed | Raised at 16:39, resolved at 16:58 | ||
249 | Closed | INC0025823 | P2 | N/A | N/A | Gemini application was unavailable for National Grid Control Room users | National Grid users were unable to access Gemini application | On 25th November at 01:50 NG Control Room were unable to access Gemini. | Gemini processes | National Grid | 11/25/2020 | 11/25/2020 | Closed | Incident raised at 01:50, resolved at 05:15 | ||
250 | Closed | INC0027589 | P2 | N/A | N/A | Demand Attribution and Auction process in Gemini is not published for 5 hr bar. | Nominations will not be confirmed | Demand Attribution and Auctions is not published for 5th hour bar and will have financial impacts for the Shippers. | Gas Nominations | Shippers | 11/30/2020 | 11/30/2020 | Closed | Raised at 05:37, resolved at 06:12 | ||
251 | Closed | INC0034082 | P2 | N/A | N/A | Auctions have been published twice for gas day 14th Dec. | Gas auctions will be published twice in Gemini | Multiple instances of the same jobs are being triggered. As a result, Auctions have been published twice for gas day 14th Dec. | Auctions | Shippers/Traders | Xoserve support teams isolated the issue by disabling the AV software agent. The teams then worked with the GNCC to implement workarounds and data corrections. The system remained protected as scheduled AV scans were still active. A permanent fix has been now been implemented. | 12/14/2020 | 12/14/2020 | Closed | Raised at 19:34, resolved at 21:15 | |
252 | Closed | INC0037343 | P2 | N/A | N/A | Demand Attribution and Auction process in Gemini is not published for 0 hr bar. | Shippers were not able to see the latest value of Demand Attribution. However, Contingency process was followed to publish the Demand Attribution. | Files not received for 0th hour bar for the gas day 23rd and 24th December resulting in Nominations not being updated. | Gas Nominations | Shippers | Xoserve teams contacted the GNCC to inform of the issue and requested contingency invocation. A major incident was logged with the NG service desk, our teams worked with NG incident management teams to receive the file. Demand was published successful for the 05:00 hour bar. Root cause analysis been requested from NG. | 12/24/2020 | 12/24/2020 | Closed | Raised at 00:37, resolved at 00:42 | |
253 | Closed | INC0039265 | P2 | N/A | N/A | Nominations were not processed for 31st December 2020 | Nominations will not be confirmed | Nominations were not processed for 31st December 2020 | Gas Nominations | Shippers | Xoserve support teams restarted the B2B application service to release the file and confirmed that EU nominations had completed for all TSO’s & shippers from all TSO’s for the 08:00 hour bar. RCA is in progress. | 12/31/2020 | 12/31/2020 | Closed | Raised at 04:30, resolved at 08:06 | |
254 | Closed | INC0040873 | P2 | N/A | N/A | Users are not able to access CMS Application. | Users were unable to perform any operations in CMS | Due to performance issues users were unable to access CMS | CMS | All Customers | 1/5/2021 | 1/5/2021 | Closed | Raised at 11:58, resolved at 15:15 | ||
255 | Closed | N/A | N/A | N/A | N/A | XCE1925 | Meter Reading correctly rejected but with incorrect rejection reason code | The read will be correctly rejected, however it will be associated to the incorrect rejection reason code | Where a Convertor Serial Number is provided in a meter read file for an MPRN, however does not have a Convertor attached, the record will be rejected, as expected, but with the wrong rejection code (MRE00427: The converter corrected read has not been supplied where there is a converter fitted and the converter reads are usable). • The correct rejection code which should be used is: MRE00421 - A converter serial number has been supplied where no converter is fitted. | Read process | Shippers | 1/13/2021 | Closed | Instances will be monitored & reviewed if any further action is required. As at 15/01/2020 no instances had occurred. No occurance of the instance as at September 2021 |
||
256 | Closed | N/A | N/A | N/A | XRN5015 | XCE1924 | A read obtained as a result of a Must Read being used as the transfer read | The read obtained as a result of a Must Read will be used as; - The closing read for the outgoing Shipper, - The opening read for the incoming Shipper. The Shippers will be notified of the read as if the read was received from the incoming Shipper. As the read was not received from the Shipper, the ‘Meter Reading Source’ is recorded as ‘C’ which is not a valid value for the file, this may mean Shipper systems may reject the record. | Where a Must Read is received within the transfer window (D to D+5 of the effective date) for both Shipper transfer and Class change, the read obtained as a result of the ‘Must Read’ is being incorrectly used as the transfer read. Normally process would be the incoming Shipper submitting an opening read, and in the case that the read has been rejected/ not submitted, Xoserve would estimate the transfer read on their behalf. | Read process | Shippers | 1/13/2021 | Closed | Instances will be monitored & reviewed if any further action is required. As at 15/01/2020 only 98 instances had occurred since June 2017. CSS implementation will resolve this issue. | ||
257 | Closed | INC0042904 | N/A | N/A | N/A | N/A | Line Pack files not published for 18th hour bar | Line Pack values are used by the Shipper to place the nominations | Line Pack files received are out of sync, impacting Line Pack being published. Contingency process invoked by NG GNCC to publish Line Pack values. | Gemini | Shippers | 1/15/2021 | Closed | Raised at 18:44, resolved at 20:20 | ||
258 | Closed | INC0021688 | N/A | 64332 | N/A | Issues with AQ correction process validations | Incorrect AQ/FYAQ values being issued in multiple notification files to Shippers and Networks. | 64332- AQ Correction (AQI) requests are being incorrectly accepted when the request reason code 4 is used with a U01 segment and the read provided is not failing the Market Breaker Tolerance. The request should be rejected with AQI00009 (The Meter Reading supplied to support the AQ correction Request reason 4 is not out side the Meter Read tolerance). | AQ - Corrections | Shippers | 1/11/2021 | Closed | Defect 64332: Deployed on 1st June 2021 | |||
259 | Open | 1167623 | N/A | 63688 64401 |
N/A | Unable to raise CMS adjustment contacts | Customers being unable to raise any adjustments that may be Impacted by Line in the Sand. | 63688: Request for Adjustment (RFA and CDQ) contacts are incorrectly getting rejected in CMS for Prime MPRNs when the unit of measurement of the meter/corrector does not match with the unit of measurement of the netoff device. 64401: Request for Adjustment contacts (RFA and CDQ) are being incorrectly rejected for Class 3 and for periods where the Class change took place the same day as a Shipper transfer |
CMS | Shippers | 9/28/2020 | No resolution dates | Defect 63688: TBC Defect 64401: Deployed on 15th September 2021 |
|||
260 | Open | INC0032565 | N/A | 64301 66215 |
N/A | Issue with IGT Portfolio Files: | Incorrect data being held by the IGT: Incorrect Confirmation Effective date and reference number in portfolio file sent to IGTs daily (IDL) | 64301- The incorrect confirmation number and confirmation effective date is being populated in the IGT portfolio files (IDL) following a Shipper transfer the day after an AQ roll update or an AQ correction goes Live. 66215- When a new meter is installed for a Meter point the B44 record is being incorrectly populated with a U (update) in the IDL file. |
Portfolio Files | IGTs | 1/7/2021 | No resolution dates | Defect 64301: TBC Defect 66215: Due to be deployed following CSS implementation |
|||
261 | Closed | N/A | N/A | 64300 | N/A | XCE1928 | Issue with GT Portfolio Files | Incorrect data being held by the GT: Incorrect CSEP indicator value in EDL file: Incorrect CSEP indicator value in portfolio file sent to Networks daily (EDL) | Where the Outcode of a postcode falls within a GT and IGT Network, this this is notified via the CSEP INDICATOR value ‘P’ at MPRNs level within the EDL file. The CSEP INDICATOR field (B38 segment) in the daily delta file (EDL) has been incorrectly populated with the value P since go live of UKLink in June 2017, where the post code does not fit in this scenario the field should be populated with ‘N’ (not shared). | Portfolio Files | GT | 1/7/2021 | Closed | Defect 64300: Deployed on 25th June 2021 | ||
262 | Open | INC0021236 | N/A | 64077 64334 |
N/A | Incorrect Data sent in Transfer of Ownership File | Shippers will receive incorrect data in transfer of ownership files | 64077- The Transfer of Ownership file (TRF) file is being populated with the incorrect address details if there has been an address amendment which results in a change to the exit zone which is effective on D-1 or D date (GT site). 64334- The incorrect Network Owner effective date for IGT MPRNs is being populated in the Transfer of Ownership file (TRF). |
Transfer of Ownership | Shippers | 11/25/2020 | 2/18/2022 | In Progress | Defect 64077: Deployed on 28th May 2021 Defect 64334: Due to be deployed following CSS implementation |
||
263 | Closed | 1183759 | N/A | 63900 | N/A | Issues with Confirmation Process | Incorrect consumption and energy values being applied to incoming and outgoing shippers | 63900- When a Supply Point Amendment file (SPC ) for a Class change and Confirmation file (CNF) are received at the same time and the new confirmation is going live after the Class change effective date of D-1, the class change is not being processed correctly and the system is incorrectly estimating a read (FICC) for the previous product Class. | Confirmation process | Shippers | 11/30/2020 | Closed | Defect 63900: Deployed on 2nd July 2021 |
|||
264 | Closed | INC0048889 | N/A | 64824 | N/A | IGTs not receiving notification of a Referral | Referrals will take longer to be processed and delay the New Shipper to take ownership | The IGT parent for a CSEP which are part of a nested combination are not receiving a capacity referral notification for daily metered (DM) sites. | Referrals | IGTs | 2/12/2021 | Closed | Defect 64604: Deployed on 2nd July 2021 |
|||
265 | Closed | N/A | N/A | 64107 | N/A | Incorrect rejection used in Customers amendment process | Customer being unable to make valid amendments to there meter points | On receipt of a customer amendment (CNC) file with an S81 record for Prime and Sub sites are being incorrectly rejected with an invalid rejection code (CTT00035). | SPA | Shippers | 12/1/2020 | Closed | Defect 64107: Deployed 28th May 2021 |
|||
266 | Open | INC0042890 | N/A | 64731 64225 65732 65805 65807 65887 66365 66477 66584 66894 67220 67273 67281 67319 |
N/A | Processing of meter reads | Potentially affect reconciliation and submission of future reads | 64731- Transfer reads are being created incorrectly as non-opening reads instead of opening & closing read for class 4 sites 64225- When a non-opening site visit (SFN) Read is received after D+10 for the Read date of D+3 Business Days, and the Read is lower than the estimated Read but higher than the last Site Visit Read, the Inner Tolerance value is getting incorrectly rejected. 65732 - Class change replacement read is not being processed within the system where a class change happens from a 3 to 4 and is the last read prior to a class change estimate read 65805 - Where a transfer replacement read is submitted and is less than the RGMA exchange read on D+1 of transfer date, this is incorrectly failing with a rejection for upper outer tolerance. 65807 - When an actual read is uploaded through the UDR or DLC process across shipper transfer i.e. if the last actual read is before shipper transfer and then a new actual read is uploaded after the shipper transfer read a better estimate should be triggered as an opening read (O). However the system is incorrectly creating these as a cyclic read (N). 65887 - Reads are failing tolerance validation when a read is loaded through UBR or UDR process where next actual read is RGMA read (FINX/FINC) with non-zero TTZ. 66365 - Meter point read details are reflecting incorrectly in UK Link where both streams have the same corrector serial number 66477 - An exception is being incorrectly generated (MR02) for missing volume or energy profile during the reconciliation process for class 3 sites, when an RGMA device exchange is performed on D-1 followed by RGMA exchange on D date. 66584 - For Class 4 sites, an exception is being incorrectly generated (MR15) during the reconciliation process of class change replacement read where class change happened from class 3 to class 4 and next read exists in class 4 period which is already reconciled 66894 - For DM sites, where two actual reads are loaded, and better estimate reads are generated inbetween these two reads, the TTZ count is not being considered when the reads have gone round the clock 67220 - Replacement read received on D (device activity date) date is not being rejected for class 3 sites where RGMA read is already uploaded 67273 - When a cyclic read is loaded within the Shipper transfer window for a class 4 site, with a corrector nistalled, and the transfer window is still open, the Opening Transfer Read (OPNT) is being loaded with a blank uncorrected read and incorrect number of digits on the meter read 67281 - For Class 4 sites, where a cyclic read with reason 'N' is being l0oaded through the UMR process within the transfer window (D + 6 to D+10) where the read type is blank, the read type is being incorrectly populated within UK Link 67319 - When a Site Visit read is inserted between 2 actual reads for DM sites, the Site Visit read is not being populated in UK Link 67828 - When MOD700 reads for multiple MPRNs are being processsed in bulk, the latest read in a batch of reads should be considered for read validations, however the system is using the oldest read in the file |
Read process | Shippers / Networks | 2/19/2021 | In Progress | Defect 64731: TBC Defect 64225: TBC Defect 65732: Deployed on 15th September 2021 Defect 65805: Deployed on 25th September 2021 Defect 65807: Deployed on 19th November 2021 Defect 65887: Deployed on 25th September 2021 Defect 66365: TBC Defect 66477: Deployed on 10th June 2022 Defect 66584: Due to be deployed following CSS implementation Defect 67220: TBC Defect 67273: TBC Defect 67319: TBC Defect 67828: Due to be deployed following CSS implementation |
|||
267 | Closed | INC0054228 | P2 | N/A | N/A | Users unable to log into Gemini | Customers unable to access or perform any operations in Gemini | Users unable to access Gemini impacting Gas Nominations, UIG Nominations, demand estimation & Capacity Auctions. | Gemini | All customers | 3/10/2021 | 3/10/2021 | Closed | |||
268 | Closed | INC0054612 | P2 | N/A | N/A | Portal Services performance issues | Users were unable to perform searches in Data enquiry at MPRN level | Some Users experiencing performance issues with Portal & DES |
Portal | All customers | 3/11/2021 | 3/11/2021 | Closed | |||
269 | Closed | INC0057450 | P2 | N/A | N/A | UIG Nominations were incorrectly published for 10AM and 11AM | UIG nominations for 28th and 29th March were incorrect. Therefore incorrect buying information being provided to Shippers | UIG nominations for 28th and 29th March were incorrect. | Gemini | Shippers | 3/28/2021 | 3/28/2021 | Closed | |||
270 | Closed | INC0057457 | P2 | N/A | N/A | XCE1935 | Processing inbound and outbound files was severely constrained | Delay in processing files and in some cases files were not processed. | On 27th March 2021, following the final stages of the UK Link Upgrade Project to upgrade all SAP application components, performance of processing of both inbond & outbound files began to deteriorate. | UK Link | All Customers | Product bug within the SAP NetWeaver 7.5 application that was previously unknown to SAP. This required SAP to develop a patch, which addressed the root cause of the issue we encountered and has stabilised UK Link. | 3/27/2021 | 4/23/2021 | Closed | Although the P2 incident was resolved, communications continue with customers to resolve the missing and duplicate files. |
271 | Closed | INC0060921 | P2 | N/A | N/A | Line Pack files not published for 10th hour bar | Line Pack values are used by the Shipper to place the nominations | Line Pack files received were incorrect for 10am on 14th April 2021 | Gemini | Shippers | 4/14/2021 | 4/14/2021 | Closed | |||
272 | Closed | INC0079940 | P2 | N/A | N/A | XCE1938 | Overnight IX Connectivity Issue | Customers were unable to process a small proportion of outbound and inbound files. This led to Gemini access issues for a small number of customers | Technical issue affecting the connectivity between the IX industry gateway and the Xoserve Electronic File Transfer (EFT) application. This issue specifically impacted 20 individual IX servers that handle IX file flow traffic for a number of our customers. | IX & Gemini | Shippers & User Agents |
More detailed root cause analysis will be completed in due course, however at this stage we have identified that the fault occurred as a result of an approved change to decommission network ports, cabling and routers at the Xoserve Peterborough and Kettering data centres, undertaken by our third party network provider | 6/8/2021 | 6/8/2021 | Closed | At 09:05 on 8th June, we successfully deployed a fix to restore service levels and all files impacted (both inbound and outbound), were successfully processed to and from UK Link. All impacted customers, including those who highlighted Gemini access issues, were contacted directly. |
273 | Closed | N/A | N/A | 63762 | N/A | XCE1939 XCE1941 |
Data Issue with Gas Safety Regulation Report | Distribution Networks may have not been notified (via the GSR report) of an isolation at a Supply Meter Point, if it was created for a historic date, which may have resulted in a Gas Safety check not being undertaken. | DNs are able to run the Gas Safety Regulation (GSR) report via the UKLink Portal. The report returns MPRNs where an isolation has been effective in UKLink between the dates input, for the selected LDZ. Shippers can retrospectively update the isolation effective date for an MPRN. If this action took place after a DN has run the GSR report for a given period, these MPRNs will have been excluded. |
GSR Process | Shippers & DNs | The report specification did not include logic to return Meter Points that had subsequently received a retrospective update to the isolation effective date. | 10/12/2020 | 1/8/2021 | Closed | Communications & data issued to DNs 30th June and 16th July 2021 Communication sent to Shippers on 29th June 2021 |
274 | Open | INC0023545 | N/A | 64170 | N/A | N/A | Meter points associated to incorrect DN portfolio | Incorrect Distribution Network is being associated to meter points | Incorrect Distribution Network (DNO) is being associated to an MPRN, following a back-dated meter installation, with an effective date prior to a recent LDZ change | RGMA | Shippers & DNs | 12/11/2020 | TBC | No resolution dates | Defect 64170: TBC | |
275 | Open | INC0042700 | N/A | 64729 | N/A | N/A | RGMA transactions being incorrectly accepted for DM sites | For Daily Metered sites, RGMA activities are being incorrectly accepted in the system where a Shipper transfer read has been fulfilled for the same date | DM Sites | Shippers | 2/19/2021 | TBC | No resolution dates | Defect 64729: TBC | ||
276 | Open | INC0048612 | N/A | 64825 | N/A | N/A | Incorrect rejections for meter installations relating to MOD 424 | Shippers are unable to update device information in the system | The system is incorrectly rejecting meter installations, (for MOD 424) where the read provided in the file is the same as the read for the previous device | RGMA | Shippers | 3/4/2021 | TBC | No resolution dates | Defect 64825: TBC | |
277 | Open | INC0055850 | N/A | 65322 | N/A | N/A | Issue with Ratchet notification files (PRN and RAT) | Customers will be receiving files not related to MPRNs in there portfolio | The Ratchet Notification File (RAT) and Periodic Portfolio Notification File (PRN) files have incorrectly been sent to some shippers when a ratchet has been processed in bulk, even though there is no shipper confirmation in progress . | SPA | Shippers | 5/20/2021 | 2/18/2022 | In progress | Defect 65322: Due to be deployed following CSS implementation | |
278 | Open | N/A | N/A | 65395 | N/A | N/A | Incorrect Supplier details being sent within Daily Delta Files | IGTs / DNs will hold incorrect Supplier details within their system | When the incumbent Shipper is updating their Supplier details, and is effective on the same day as a Shipper transfer, the incorrect Supplier details is being sent within the Daily Delta Files (IDL / EDL) | SPA | IGTs & DNs | 6/10/2021 | TBC | No resolution dates | Defect 65395: TBC | |
279 | Open | INC0063440 | N/A | 65576 | N/A | N/A | Incorrect rejection of RGMA update | Customers are unable to update the BYPAS indicator in UK Link | When a Shipper submits an RGMA ONUPD, exchanging the meter details (which includes a BYPAS activity update) is being incorrectly rejected in UK Link | RGMA | Shippers | 7/8/2021 | TBC | No resolution dates | Defect 65576: TBC | |
280 | Open | N/A | N/A | 65657 67437 67438 |
N/A | N/A | Shippers unable to cancel AQ correction request | AQ Tolerance will be incorrectly updated and Shippers will be unable to change the AQ for the following 9 months | 65657 - If a Shipper submits an AQ Correction File (.AQI) with reason code 4 (Tolerance Change) - however tries to cancel the correction at a later date, the system is not allowing the cancellation to happen when it should 67437 - AQ Corrections are being incorrectly accepted where the read date is older than 6 months. 67438 - An AQ correction request along with U01 for request reason 4 is received for a class 4 site is being incorrectly rejected |
AQ Correction | Shippers | 7/19/2021 | TBC | No resolution dates | Defect 65657: TBC Defect 67437: TBC |
|
281 | Closed | N/A | N/A | 65659 | N/A | N/A | Estimated class change reads incorrectly used for tolerance validation | This will impact calculation of volume and energy | Class change estimate is being incorrectly considered for tolerance validation for forward volume, when a cyclic read is inserted before the class change date for non daily metered (NDM) site | Reads | Shippers | 7/19/2021 | TBC | Closed | Defect 65659: Deployed 3rd September 2021 | |
283 | Open | INC0081204 | N/A | 65741 66313 |
N/A | N/A | Missing information from Response File | Customers will not receive all information within their response files | 65741: S75 segment (meter point details) are not being populated in the Nomination Response File (.NMR) for twin stream / brownfield sites 66313: Site component SOQ field within the U71 record (NTS Optional Rate) is not being populated for IGT sites |
SPA | Shippers | 8/3/2021 | TBC | No resolution dates | Defect 65741: TBC Defect 66313: TBC |
|
284 | Closed | INC0096954 | P2 | N/A | N/A | XCE1943 | Performance Issues with UK Link | Inbound and outbound files were temporarily suspended. These were processed once normal service was restored, therefore no impact to customers | Customers were experiencing performance issues with file transfers within UK Link, which resulted in all inbound and outbound files being temporarily suspended | UK Link | All customers | 8/23/2021 | 8/23/2021 | Closed | 23rd August 2021 | |
284 | Open | INC0088238 | N/A | 65806 | N/A | N/A | Missing Contact Details | Customers will not be able to retrieve data that is being submitted | When the Contact Electronic address field is being populated in the S67 (Electronic Device) Record when accompanying an S38 (LSP Confirmation), the data is not being saved in UK-Link. | Confirmation process | All Customers | 8/8/2021 | TBC | No resolution dates | Defect 65806: TBC | |
285 | Closed | INC0097826 | P2 | N/A | N/A | N/A | Access issues to Gemini application | NTS Exit Capacity Auction for 1:00am and 2:00am were not published, and therefore Shippers were unable to submit bids | National Grid control room users were unable to log in to Gemini | Gemini | National Grid | 8/28/2021 | 8/28/2021 | Closed | 28th August 2021 | |
285 | Open | N/A | N/A | 66070 | N/A | N/A | Class 1 site incorrectly Confirmed | Sites may be errouneously confirmed and charges maybe incorrect. | Seasonal Large Supply Point are being incorrectly Confirmed as Class 4 during the SLSP contract period. | Confirmation process | Shippers | TBC | 9/10/2021 | TBC | No resolution dates | Defect 66070: TBC |
286 | Closed | INC0098568 | P2 | N/A | N/A | N/A | Exit Capacity Auction unable to be processed | TBC | National Grid were unable to process the Exit Capacity Auction bids from 9 Shippers, for 27th August Gas Day | Gemini | National Grid & Shippers | 8/28/2021 | 8/28/2021 | Closed | 28th August 2021 | |
286 | Closed | INC0093852 | N/A | 66217 | N/A | N/A | Incorrect Correction Factor being used. | Consumption and Charges will be incorrecly calculated. | For sites with a Meter and a Corrector the Meter Correction factor is being incorrectly used. | RGMA | Shippers | 9/27/2021 | TBC | Closed | Defect 66217: Deployed on 24th January 2022 | |
287 | Closed | INC0098801 | P2 | N/A | N/A | N/A | Database error within Gemini | Users were experiencing performance issues within the system | Users were experiencing performance issues with Gemini and Gemini exit screens | Gemini | All users | 8/29/2021 | 8/29/2021 | Closed | 29th August 2021 | |
288 | Closed | N/A | N/A | N/A | N/A | XCE1936 | Delayed submission of the LDZ Capacity and LDZ Commodity Invoice Supporting Information Files | Customers did not have received the .CZI Supporting Information file on the scheduled date of Friday 14th May 2021 | The LDZ Capacity Invoice Supporting Information File (.CZI) was due to be issued on Friday 14th May. Due to a technical issue, these files were delayed. | Invoicing | Shippers & Networks | 5/20/2021 | 5/20/2021 | Closed | Communciation issued to Shippers & Networks on 20/05/21 and all files were delivered to customers. | |
289 | Closed | N/A | N/A | N/A | N/A | XCE1942 | Performance issues with Data Discovery Platform (DDP) | Customers were unable to use DDP features once logged in to the platform. | Global issue encountered with our platform vendor, which resulted in customers being unable to use the features od the Data Discovery Platform (DDP) within the system once logged in | DDP | All customers | 7/21/2021 | 7/21/2021 | Closed | ||
290 | Closed | N/A | N/A | N/A | N/A | XCE1944 | Significant LDZ Input Measurement Errors (EM and SE) | This means that the total energy recorded as being delivered into the LDZ is incorrect for the period. •The way that daily gas allocation works means that Unidentified Gas (UIG) is incorrect in the affected LDZ (too low if the meter under-recorded and too high if the meter over-recorded). •When the error is corrected this will mean that there will be charges or credits to all Gas Shippers with a live meter point portfolio in the affected LDZs during the affected period (see above for dates) depending on the direction of the error. Corrections are processed on the Amendment Invoice as Unidentified Gas Reconciliations, using the latest reconciled throughput the affected period and the relevant (i.e. historic) UIG Weighting Factors for the affected period. • Under-recording meter = additional UIG charges • Over-recording meter = UIG credits |
Distribution Network Operators (DNOs) have notified Joint Office that the offtake meters into two LDZs have been mis-recording as follows: •EM (East Midlands LDZ) – Alrewas Offtake under-recorded from 23/05/2019 to 23/02/2021 due to the orifice plate being inserted incorrectly (Cadent Gas) •SE (South East LDZ) – Isle of Grain main input meter over-recorded from 19/06/18 to 12/02/19 due to issues with the temperature transmitter (Southern Gas Networks) |
Invoicing | Shippers | 9/1/2021 | 9/6/2021 | Closed | Communication sent to impacted Shippers and data sent by 06/09/2021 | |
291 | Closed | INC0104260 | N/A | N/A | N/A | XCE1945 | Issue accessing Discovery APIs | Customers will be unable to access or call the Xoserve Discovery API to obtain information. | Microsoft Azure Platform that hosts Xoserve’s Discovery APIs is currently unavailable meaning no calls can be made successfully to the APIs | DDP | Shippers Suppliers MAPs Domestic and Non-Domestic PCWs and TPIs |
9/30/2021 | 9/30/2021 | Closed | Service restored on 30/09/2021 | |
292 | Closed | INC0103838 | N/A | N/A | N/A | XCE1946 | Issue with Confirmation Validations | Shipper Confirmations had a reduced objection period and Confirmation effective period | Following the enabling of code to cater to the requirements of MOD728B (‘Enabling NTS sites to register for NTS Optional Capacity discount on an annual eligibility basis’), it was identified that certain validations pertaining to the confirmation effective date notice period had been disabled. | Confirmation process | Shippers | MOD728B | 10/4/2021 | 10/10/2021 | Closed | Identified the MPRNs (Incoming and Outgoing) impacted by this issue and sent to customers via email. For switches that had not already taken effect, we contacted the impacted outgoing shipper to ensure they were aware of the reduced objection deadline, to seek their instruction. |
293 | Closed | N/A | N/A | N/A | N/A | XCE1948 | Amendment Invoice - K91 EUC Error | This resulted in incorrect End User Categories (EUCs) being presented in the July 2021 and August 2021 Amendment Invoice – issued in August & September 2021 respectively. The UIG Smear itself was not impacted and the UGR (Unidentified Gas Reconciliation) charges within the invoice and the supporting data are correct. |
Incorrect EUC references have been included in the K91 record of the ASP File (supporting data for the UIG Smear within the Amendment Invoice). Shippers will have received references in the record under which they do not have any sites.This is a presentation only issue and is a result of the implementation of XRN5253 June 21 Major Release, which affected the supporting information mapping pulling in incorrect EUC references. | Invoicing | Shippers | 11/8/2021 | 11/8/2021 | Closed | We have implemented a fix to ensure the mapping is now correct and the EUC references within the September 2021 Amendment (issued 26/10/21) were correct | |
294 | Closed | INC0114211 | N/A | N/A | N/A | XCE1949 | Data refresh Issue with Discovery APIs | The data customers access from the Xoserve Discovery API was outdated and as at 20th November 2021 | All Discovery APIs were providing data as at 20th November 2021. | APIs | Shippers, Suppliers, MAPs, Domestic and Non-Domestic PCWs and TPIs | Recent Change activities to the Data Platform by SAP has been identified as the root cause of the issue | 11/23/2021 | 11/26/2021 | Closed | Issue resolved and the data held for the Discovery APIs is now up to date. Confirmation sent to customers on 26th November 2021 |
295 | Closed | N/A | N/A | N/A | N/A | XCE1950 | Commodity Invoice Issue | A number of Shippers will have incorrect charges on their October 2021 Commodity invoice. Adjustments will be processed to correct the financial position for all impacted customers. The adjustments will be processed as Request To Bill (RTB) invoices and issued on a .INR file. All invoices will have supporting information in an MS Excel spreadsheet issued via email on the same day that the RTB invoices are issued. |
A manual error has resulted in incorrect charges being issued on the October 2021 Commodity Invoice | Invoicing | Shippers | Manual error. A review of the process has been completed and additional controls are now in place to ensure the manual error that occurred on the October 2021 invoice will not occur again. | 12/6/2021 | 12/8/2021 | Closed | Impacted customers were contacted on 8th December 2021, to advise on the materiality of the adjustments and the proposed dates for the adjustment invoices being processed. |
296 | Closed | INC0122402 | P2 | N/A | N/A | N/A | CMS Application unavailable for customers | All customers were unable to access the system, including those who were already using the service | On 15th December at 10:26 the CMS Portal became unavailable for all customers, however the service was restored at 11:03 | CMS | All customers | The server which hosts the CMS service failed, which resulted in the services being moved to another host. Services were manually restarted on the new host to restore service. |
12/15/2021 | 12/15/2021 | Closed | |
297 | Closed | INC0133807 | P2 | N/A | N/A | XCE1951 | API Services Data Refresh Issue | Disruption of some shipper and supplier registration processes, as well as customer service query handling times and meter point validation activities. | On 17th January an issue with the scheduled data load process for our API service. This led to the omission of some meter points meaning that some searches return a null response. There was also an issue with system performance during this time |
APIs | Shippers, Suppliers, MAPs, Domestic and Non-Domestic PCWs and TPIs | 1/17/2022 | 1/17/2022 | Closed | ||
286 | Open | N/A | N/A | 66893 67732 67763 67764 67830 |
N/A | N/A | Missing data from Distribution Network file | Network is not being informed of the latest data | 67732 - When a meter instruction update is received in the .MAI file (Meter Access Instructions), it is being updated in UK Link however is not being issued in the EWS portfolio file 67763 - When there is a request to update the last visit date received in the .MID file (Meter Inspection Date Notice), it is being updated in UK Link but the details are not being issued in the EWS portfolio file 67764 - When a Gas act owner update is received in MAM file (Meter Asset Manager), it is being updated in the system but not being issued in the EWS portfolio file. 67830 - When a meter is removed in UK Link, there is missing meter details within the EWS file .The update is being shown correctly in the system however is not being issued in the EWS portfolio file |
Portfolio Files | DN's | TBC | 12/14/2021 | TBC | No resolution dates | Defect 66893: TBC Defect 67732: TBC Defect 67830: TBC |
287 | Open | N/A | N/A | 67150 | N/A | N/A | Missing data from SSMP Files | Customers will not receive all information within their files | The W03 new LMN segment within the Gemini Work Item file (GWI) is not being populated with the new shipper details following a Class 1 Shared Supply Meter Point confirmation | Unique Sites | Shippers | TBC | 1/11/2022 | TBC | No resolution dates | Defect 67150: TBC |
288 | Open | N/A | N/A | N/A | N/A | UK Link data discrepancy with Discovery API | Customers are unable to retrieve the most up to date information from the Big Data Platform for a small number of meter points (<0.1%) | For a very small number of meter points (<0.1%), some data items were not being refreshed in line with changes being made in UK Link. | Discovery APIs | All customers | TBC | 2/7/2022 | TBC | In progress | We implemented a fix to the data-loading routines on 3 February. Since then, all changes that occur in UK Link are being reflected in the API services. We have implemented a data fix to the Service Provider History table, however 0.02% of the API data has not been refreshed in line with UK Link. The team are currently working on this and hope to have a fix in place as soon as possible. |
|
289 | Open | INC0102985 | N/A | 67998 68002 |
N/A | N/A | Incorrect SOQ value | Customers will receive incorrect charges on their invoices | Defect 67998: For greenfield sites, when there is a future SOQ value for AQ review, the SOQ value is being incorrectly used for the back billing period (when the value should be the same as the confirmation effective date) Defect 68002: For non-daily metered sites, when there is a class change from 3 to 4 or vice versa, the rolling SOQ value is being incorrectly calculated and sent in the SCR file, however this value should be taken from UK Link |
SPA | Shippers & Networks | TBC | 5/26/2022 | TBC | No resolution dates | Defect 67998: TBC Defect 68002: TBC |
290 | Open | N/A | N/A | 67999 | N/A | N/A | Incorrect charge rates for CSEP sites | Customers will receive incorrect charges on their invoices | The rates which are being issued in the Supply Point Change Response File (SCR) and Confirmation Response File (CFR) for LDZ IGT sites are not considering the CSEP’s SOQ and AQ values, instead it considers the MPRNs AQ and offered SOQ. | SPA | IGTs | TBC | 5/26/2022 | TBC | No resolution dates | Defect 67999: TBC |
291 | Open | INC0143365 | N/A | 68001 | N/A | N/A | Alternate telephone numbers not being removed from Daily Cleansing Job | Outdated information is being incorrectly retained within the system | On receipt of a Customer Amendment (CNC) file, the daily cleansing job is not correctly removing the alternate contact telephone number | SPA | Shippers & Networks | TBC | 5/26/2022 | TBC | No resolution dates | Defect 68001: TBC |
292 | Open | INC0137255 | N/A | 68003 | N/A | N/A | Incorrect LDZ customer charge rates | Customers will receive incorrect charges on their invoices | Incorrect LDZ customer charge rates are being populated within the S03 segment (MRF and batch frequency change) following a Meter Read Frequency update (MRF). The rate is being derived based on the rolling AQ when it should be derived fron the Formula Year AQ. This affects sites with an AQ between 73,200 and 732,000 kWh | Invoicing | Shippers | TBC | 5/26/2022 | TBC | No resolution dates | Defect 68003: TBC |
293 | Open | N/A | N/A | 68017 | N/A | N/A | Data issues within UK Link | Data Enquiry may not show updated reads | For Class 4 Prime sites which have an Automatic Meter Reading device installed, the check to check period is not being correctly stored in UK Link | RGMA | Shippers | TBC | 5/28/2022 | TBC | No resolution dates | Defect 68017: TBC |
294 | Open | INC0208866 | N/A | 68097 | N/A | N/A | Nomination offers not being correctly cancelled after 180 day offer period | Customers may receive incorrect updates for MPRNs where an offer has lapsed on their NRL files | A number of nomination offers are not being cancelled after 180 day offer period has lapsed from the offer creation date | Nomination / confirmation process | Shippers | TBC | 6/17/2022 | TBC | No resolution dates | Defect 68097: TBC |
Defect / CR No. | Status | Date Defect Raised | Issue Description | Customer Impact | Defect Profiled | Communication Reference No. | Total of affected MPRNs (industry) | Expected Date for Enduring Fix | Date for revised AQ Effective Date | RAG for meeting fix dates | Status Explanation | Linked Ticket Reference Numbers |
XRN4740 | Closed | For Class 4 sites with AMR fitted the AQ value calculated is incorrect, as both cyclic and sites visit reads are classed as valid reads. XRN4740 has changed the AQ calculation logic to identify energy between each cyclic read as well as the energy calculated between the Check to Check. Where any cyclical reads energy is identified, between two Check to Check reads, then only the energy for the Check to Check will be used for the AQ calculation | Medium | Yes | 2745 | Deployed on 16/02/2019 | 11/1/2019 | Complete | 979017, A174, A200, A203, 993736 | |||
N/A | Open | N/A | For Class 3 Meter Points, where a meter read is dated between the 5th and the 10th and is accepted within the read submission period, energy has not been calculated for those days, due to the energy factors not being received from Gemini. As the energy is not being calculated for this period of time, this is resulting in the Rolling AQ calculation not using the energy for these days and therefore being understated. |
Medium | No | XCE1884 | TBC | N/A | N/A | On target | Resolution options discussed at DSG on 23/03/20 This has been included as a process/design improvement as part of the AQ Taskforce |
|
62381 | Open | 5/13/2020 | When providing a convertor update with a volume correction factor update, without a meter report read (via ONUPD file), a system exception is being incorrectly raised (RU07) | High | Yes | N/A | 5 | TBC | TBC | No resolution dates | Testing of fix is underway | |
63682 | Open | 9/25/2020 | If a Shipper loads a class change, shipper transfer, Site Fault Notification Read (SFN), Unbundled Meter or CYCL read, followed by an RGMA exchange or removal on D+1, the volume and energy are being incorrectly calculated |
Medium | Yes | N/A | 93 | TBC | TBC | No resolution dates | Testing of fix is underway | |
64026 | Open | 11/20/2020 | The Class change on the Twin Stream Site is creating an FICC record for only one stream in the Staging table, the SFN, DLC and UDR Table | Low | Yes | N/A | 8 | Deployed 23/07/2021 | Expected 01/04/2022 | On target | AQ's to be recalculated and effective as of 1st April 2022 | |
65001 | Open | 3/30/2021 | When a Site Fault Notification Read (SFN) is uploaded in the system for a Class 4 Prime site, the net-off read, volume, and energy are not being retained correctly in UK Link |
Medium | Yes | N/A | 1 | Deployed 30/08/2021 | 11/1/2021 | On target | Fix deployed and data correction completed in August. Awaiting financial adjustment | |
65220 | Open | 5/9/2021 | Reconciliation is not calculating correctly for class 3 prime site as it is using same volume which is present in the system for updating net-off volume and energy. | High | Yes | N/A | 34 | Deployed 03/12/2021 | TBC | On target | Fix deployed. Awaiting business assurance on data correction and then requires financial adjustment | |
65665 | Open | 7/20/2021 | Final read date for Final Exchange Read and Final Class Change Read is being incorrectly updated in the system when the RGMA effective date is the same as the Shipper transfer effective date |
Low | Yes | N/A | 1,042 | Deployed 09/10/2021 | 3/1/2022 | On target | Fix deployed and AQ's effective as of 1st March 2022, financial adjustments required | |
65810 | Open | 8/9/2021 | Volume is being incorrectly updated in the system, when a must read is inserted prior to a Shipper transfer estimated read | Medium | Yes | N/A | 2 | TBC | TBC | No resolution dates | Testing of fix is underway | |
65922 | Open | 8/23/2021 | An incorrect read is being selected as the next actual read for Class 4 sites with a corrector, where the next read does not have a uncorrected read populated | Medium | Yes | N/A | 4 | Deployed 03/12/2021 | 3/1/2022 | On target | Fix deployed, awaiting financial adjustment | |
66314 | Open | 10/5/2021 | AQ Correction Requests (.AQI) are being processed and updated within UK Link even though a cancellation request has been received | Medium | No | N/A | TBC | TBC | TBC | No resolution dates | Testing of fix is underway | |
66366 | Open | 10/12/2021 | Previous read date is being incorrectly used as the Final Exchange Read (FINX) and and Final Class Change Read (FINC) when the appointment date is the same as Shipper move-in date | Medium | Yes | N/A | 43 | Deployed 24/01/2022 | TBC | On target | Fix deployed and awaiting business assurance on data correction | |
66428 | Open | 10/25/2021 | For a site where a class change occurs from class 4 to 3 on D date followed by shipper transfer on D+10 where the transfer read is estimated, the site is Reconciled and billed till D+10 date. When a Replacement read is loaded for the transfer date on D+10, the previous volume is being incorrectly populated | High | Yes | N/A | 202 | TBC | TBC | No resolution dates | Testing of fix is underway | |
66429 | Open | 10/25/2021 | For class 4 sites, when inserting a read on the first of the month, two variances are being generated at the end of the previous month following reconciliation (only one variance should be generated) | Medium | Yes | N/A | 8,751 | TBC | TBC | No resolution dates | Testing of fix is underway | |
66623 | Open | 11/22/2021 | Class 4 Prime-sub sites, When Shipper transfer is performed for sub site on D date followed by loading an actual read through a read submission file (within transfer window(D to D+5)) the transfer read estimation is not getting triggered | Medium | Yes | N/A | - | TBC | TBC | No resolution dates | Testing of fix is underway | |
66624 | Open | 11/22/2021 | When a read is submitted by the outgoing Shipper on D-1 for a Prime site, the read is being incorrectly loaded as an active read | Medium | Yes | N/A | 3 | TBC | TBC | No resolution dates | Testing of fix is underway | |
67274 | Open | 1/24/2022 | Consumption Adjustments for Class 4 sites are not being applied by CMS for one day whereby the Final Class Change Read (FICC) and Final Exchange Read (FINX) are present on the same date and adjustment start date and end date are same in UK Link Consumption Adjustments for Class 2 sites are not being applied where adjustment end date is the same as Shipper end date |
Low | No | N/A | TBC | TBC | TBC | No resolution dates | Analysis of fix is ongoing | |
67319 | Open | 1/31/2022 | When a Site Visit read is inserted between 2 actual reads for Class 1 & 2 DM sites, the Site Visit read insert is not populating the next read date within UK Link | High | Yes | N/A | 8 | TBC | TBC | No resolution dates | Analysis of fix is ongoing | |
67938 | Open | 5/12/2022 | Volume/ energy is being incorrectly calculated when an actual read is loaded after an estimated transfer read. This is due to the last actual read on the meter point being an inserted actual read | High | Yes | N/A | 62k | TBC | TBC | No resolution dates | Analysis of fix is ongoing | |
68006 | Open | 5/26/2022 | Where a meter point has had a class change from a 4 to 3 and back to 4, any meter activity received for the lastest class 4 period is resulting in the TTZ being incorrectly calculated for the RGMA read. TTZ calculation is incorrectly using the class 4 site read, but it should use the class 3 read instead. | Medium | No | N/A | TBC | TBC | TBC | No resolution dates | Analysis of fix is ongoing | |
68016 | Open | 5/28/2022 | When an LDZ Exchange read is estimated on the LDZ change date for Non Daily Metered sites, the read, volume/ energy are not being correctly stored within UK Link. | Low | Yes | N/A | 0 | TBC | TBC | No resolution dates | Testing of fix is underway | |
68019 | Open | 5/28/2022 | When a cyclic read with read reason 'N' is loaded within the D+6 to D+10 window of the Shipper transfer date for Class 4 Prime sites, the opening transfer read (OPNT) which is loaded into UK Link is missing the Meter/Corrector Serial Number and estimated energy on Net-off device is incorrect | Medium | Yes | N/A | 2 | TBC | TBC | No resolution dates | Testing of fix is underway | |
68020 | Open | 5/28/2022 | For a prime site where a class change occurs from class 3 to 4, the estimated class change read (FICC) is being incorrectly loaded into UK Link. For impacted sites, reconciliation is not occuring between the last cyclic read to the final class change read |
Low | Yes | N/A | 0 | TBC | TBC | No resolution dates | Analysis of fix is ongoing | |
68059 | Open | 6/9/2022 | When a Shipper transfer occurs on D date with an LDZ change occurring on D-1 (for Class 4 prime sites), the LDZ exchange estimation read is being incorrectly loaded into the system as 'inactive' which is creating an exception (LD01). This is whilst the shipper transfer is still in progress. After the Shipper transfer reads are estimated on D date, the Auto-resolution of the exception is failing to adjust the Volume and Energy against the LDZ exchange read | Medium | Yes | N/A | 0 | TBC | TBC | No resolution dates | Analysis of fix is ongoing | |
68071 | Open | 6/13/2022 | Incorrect Formula Year SOQ (FY SOQ) has been provided in the AQ Notification Files (.NRL) which were issued in March (effective date of 1st April 2022) and, where it was issued, in April (effective date of 1st May 2022). This does not impact AQ calculation |
High | Yes | Incorrect FY SOQ values shown in April and May NRL Files for some MPRN | 3,300 | TBC | TBC | No resolution dates | Analysis of fix is ongoing |
no reviews yet