jagomart
digital resources
picture1_Quantity Surveyor Pdf 84742 | Detailed Cost Report


 121x       Filetype PDF       File size 0.11 MB       Source: www.waverley.nsw.gov.au


File: Quantity Surveyor Pdf 84742 | Detailed Cost Report
registered quantity surveyor s detailed cost report for development cost of 500 000 or more a member of the australian institute of quantity surveyors applicant details it is important that ...

icon picture PDF Filetype PDF | Posted on 13 Sep 2022 | 3 years ago
Partial capture of text on file.
                     
                      REGISTERED* QUANTITY SURVEYOR’S 
                      DETAILED COST REPORT 
                     
                     
                      FOR DEVELOPMENT COST OF $500,000 OR MORE 
                     
                      * A member of the Australian Institute of Quantity Surveyors 
                      
                      APPLICANT DETAILS (It is important that we are able to contact you if more information is needed) 
                      
                      Name (or Company)                                                                                       
                      Postal Address:                                                                                          
                          _ Postcode:      
                      Phone No. (Daytime):                              _ Mobile No.:     
                      E‐mail:                           Contact Person (If a Company):                                         
                      APPLICATION DESCRIPTION (This will help us to correctly identify the subject property) 
                      Development Application No.:                       Date Approved (if relevant) :     
                      Development Address:                                                                                    
                                                               DEVELOPMENTDETAILS
                      Site Area:                            sqm            GrossFloorArea–Residential:            sqm
                      Gross Floor Area – Retail:             sqm           GrossFloorArea–Other:                  sqm
                      Gross Floor Area – Commercial:         sqm           TotalGrossFloorArea:                   sqm
                      Gross Floor Area – Parking:            sqm           TotalNumberofCarParkingSpaces
                                                                                                            
                                                                 ESTIMATEDETAILS
                                Area of Work              CostofConstruction($)                       Cost ($)
                                                                                                              
                      Demolition and Site Preparation                                             /sqm of site area
                                                                                                                  
                      Excavation                                                                  /sqm of site area
                                                                                                                  
                      Construction ‐ Retail                                                       /sqm of retail area 
                      Construction – Commercial                                                   /sqm of commercial area
                      Construction – Residential                                                  /sqm of residential area
                      Fitout – Retail                                                             /sqm of retail area 
                      Fitout – Commercial                                                         /sqm of commercial area
                      Fitout ‐ Residential                                                        /sqm of residential area
                      Carpark                                                                     /sqm of parking area
                                                                                                                      
                                                                                                  /car space 
                      Professional Fees     $                     %ofconstructioncost              %of development cost
                      TOTAL CONSTRUCTION COST              $
                      TOTAL GST                            $
                      TOTAL DEVELOPMENT COST               $
                                                 
                     
                      I certify that I have: 
                           Inspected the plans the subject of the application for development consent; 
                           Prepared and attached an elemental estimate generally prepared in accordance with the Australian Cost 
                             Management Manuals from the Australian Institute of Quantity Surveyors;
                                                                                                
                           Calculated the development costs in accordance with the definition of development costs in clause 25J of 
                             the Environmental Planning and Assessment Regulations 2000 at current prices; 
                           Included GST in the calculation of development cost; and 
                           Measured Gross Floor Areas in accordance with the Method of Measurement of Building Areas in the AIQS 
                             Cost Management Manual Volume 1, Appendix A2. 
                     
                      Signature:    Date:    
                      Position and Qualifications:                                                                           
                     
                      O:\Building Waverley\Customer Service\Forms\Registered Detailed Cost Report_ September 2019.doc 
The words contained in this file might help you see if this file matches what you are looking for:

...Registered quantity surveyor s detailed cost report for development of or more a member the australian institute surveyors applicant details it is important that we are able to contact you if information needed name company postal address postcode phone no daytime mobile email person application description this will help us correctly identify subject property date approved relevant developmentdetails site area sqm grossfloorarea residential gross floor retail other commercial totalgrossfloorarea parking totalnumberofcarparkingspaces estimatedetails work costofconstruction demolition and preparation excavation construction fitout carpark car space professional fees ofconstructioncost total gst i certify have inspected plans consent prepared attached an elemental estimate generally in accordance with management manuals from calculated costs definition clause j environmental planning assessment regulations at current prices included calculation measured areas method measurement building ...

no reviews yet
Please Login to review.