123x Filetype PPT File size 0.10 MB Source: conferences.fnal.gov
Outline • History • Design • First prototype • DataGrid fabric mgmt monitoring task • Conclusions May 24 2001 PEM status report. LCCWS@FNAL O 2 .Bärring History • The Performance and Exception Monitoring (PEM) project is a CERN IT project since 1999 – Leader: Tim Smith, Bernd Panzer-Steindel from 2001 – Goal (and innovation): Monitor and alarm on service rather than server • Long requirement phase with input from many IT groups • Design settled in mid-2000 May 24 2001 PEM status report. LCCWS@FNAL O 3 .Bärring Design 1..n 1 1..n 1 Measurement 1 Agent Broker repository (MR) 1..n 1 sensors actuators 1 1 1..n Configuration Correlation Repository (CR) Engine (CE) 1 1..n 1 1..n User Interface Access control Data Control May 24 2001 PEM status report. LCCWS@FNAL O 4 .Bärring Design: agent • The agent forwards data from monitoring sensors to the broker – Buffering of data for transfer efficiency and fault tolerance – The configuration of local sensors and actuators is received via the broker – Firing of actuators is triggered by MR (or CE) via broker to the agent May 24 2001 PEM status report. LCCWS@FNAL O 5 .Bärring Design: broker • The broker was introduced for scalability – Transmitter of configuration information to • Agents • Measurement repository – Transmitter of measurement data from agent to measurement repository – Transmitter of requests for firing actuators from MR to the agents May 24 2001 PEM status report. LCCWS@FNAL O 6 .Bärring
no reviews yet
Please Login to review.