221x Filetype PPT File size 0.10 MB Source: conferences.fnal.gov
Outline
• History
• Design
• First prototype
• DataGrid fabric mgmt monitoring task
• Conclusions
May 24 2001 PEM status report. LCCWS@FNAL O 2
.Bärring
History
• The Performance and Exception Monitoring
(PEM) project is a CERN IT project since 1999
– Leader: Tim Smith, Bernd Panzer-Steindel from 2001
– Goal (and innovation): Monitor and alarm on service
rather than server
• Long requirement phase with input from many IT
groups
• Design settled in mid-2000
May 24 2001 PEM status report. LCCWS@FNAL O 3
.Bärring
Design
1..n 1 1..n 1
Measurement 1
Agent Broker repository (MR)
1..n 1
sensors actuators 1
1 1..n
Configuration Correlation
Repository (CR) Engine (CE)
1
1..n 1 1..n
User Interface Access control
Data
Control
May 24 2001 PEM status report. LCCWS@FNAL O 4
.Bärring
Design: agent
• The agent forwards data from monitoring
sensors to the broker
– Buffering of data for transfer efficiency and
fault tolerance
– The configuration of local sensors and actuators
is received via the broker
– Firing of actuators is triggered by MR (or CE)
via broker to the agent
May 24 2001 PEM status report. LCCWS@FNAL O 5
.Bärring
Design: broker
• The broker was introduced for scalability
– Transmitter of configuration information to
• Agents
• Measurement repository
– Transmitter of measurement data from agent to
measurement repository
– Transmitter of requests for firing actuators from
MR to the agents
May 24 2001 PEM status report. LCCWS@FNAL O 6
.Bärring
no reviews yet
Please Login to review.