jagomart
digital resources
picture1_Outline For Powerpoint Presentation Example 71310 | Pem Lccws


 123x       Filetype PPT       File size 0.10 MB       Source: conferences.fnal.gov


File: Outline For Powerpoint Presentation Example 71310 | Pem Lccws
outline history design first prototype datagrid fabric mgmt monitoring task conclusions may 24 2001 pem status report lccws fnal o 2 barring history the performance and exception monitoring pem project ...

icon picture PPT Filetype Power Point PPT | Posted on 30 Aug 2022 | 3 years ago
Partial capture of text on file.
                                      Outline
         • History
         • Design
         • First prototype
         • DataGrid fabric mgmt monitoring task
         • Conclusions
         May 24 2001                PEM status report. LCCWS@FNAL O                          2
                                    .Bärring
                       History
      • The Performance and Exception Monitoring 
        (PEM) project is a CERN IT project since 1999
         – Leader: Tim Smith, Bernd Panzer-Steindel from 2001
         – Goal (and innovation): Monitor and alarm on service 
           rather than server
      • Long requirement phase with input from many IT 
        groups
      • Design settled in mid-2000
      May 24 2001     PEM status report. LCCWS@FNAL O   3
                      .Bärring
                                             Design
                              1..n     1                      1..n     1
                                                                                 Measurement               1
                  Agent                         Broker                           repository (MR)
                                                    1..n                                1
     sensors      actuators                           1
                                                                    1    1..n
                                          Configuration                           Correlation
                                         Repository (CR)                         Engine (CE)
                                                          1
                               1..n    1                     1..n
              User Interface               Access control
                                                                                             Data
                                                                                             Control
           May 24 2001                     PEM status report. LCCWS@FNAL O                                    4
                                           .Bärring
                    Design: agent
      • The agent forwards data from monitoring 
         sensors to the broker
          – Buffering of data for transfer efficiency and 
            fault tolerance
          – The configuration of local sensors and actuators 
            is received via the broker
          – Firing of actuators is triggered by MR (or CE) 
            via broker to the agent
      May 24 2001       PEM status report. LCCWS@FNAL O       5
                        .Bärring
                    Design: broker
      • The broker was introduced for scalability
          – Transmitter of configuration information to
             • Agents
             • Measurement repository
          – Transmitter of measurement data from agent to 
            measurement repository
          – Transmitter of requests for firing actuators from 
            MR to the agents
      May 24 2001        PEM status report. LCCWS@FNAL O       6
                         .Bärring
The words contained in this file might help you see if this file matches what you are looking for:

...Outline history design first prototype datagrid fabric mgmt monitoring task conclusions may pem status report lccws fnal o barring the performance and exception project is a cern it since leader tim smith bernd panzer steindel from goal innovation monitor alarm on service rather than server long requirement phase with input many groups settled in mid n measurement agent broker repository mr sensors actuators configuration correlation cr engine ce user interface access control data forwards to buffering of for transfer efficiency fault tolerance local received via firing triggered by or was introduced scalability transmitter information agents requests...

no reviews yet
Please Login to review.