Sheet 1: REKAP BOQ
REKAPITULASI | ||||||
PEKERJAAN ARSITEKTUR, PONDASI DAN STRUKTUR, ELEKTRIKAL, PLUMBING, SPRINKLE DAN TATA UDARA | ||||||
PEKERJAAN | : PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT. JASA RAHARJA | |||||
LOKASI | : JL. HR.RASUNA SAID KAV. C2 JAKARTA SELATAN | |||||
TAHUN | : 2022 | |||||
URAIAN PEKERJAAN | JUMLAH | |||||
NO | SUB JUMLAH | HARGA | ||||
(Rp.) | ||||||
I | PEKERJAAN ARSITEKTUR | - | ||||
A. | PEKERJAAN PERSIAPAN | - | ||||
B. | PEK. SIPIL ARSITEKTUR | - | ||||
II | PONDASI DAN STRUKTUR | - | ||||
A. | PEKERJAAN TANAH | - | ||||
B. | PEKERJAAN PONDASI | - | ||||
C. | PEKERJAAN LOWER STRUKTUR | - | ||||
D. | PEKERJAAN UPPER STRUKTUR | - | ||||
E. | PEKERJAAN ATAP | - | ||||
III | ELEKTRIKAL | - | ||||
A | PEMASANGAN PANEL | - | ||||
B | PEMASANGAN KABEL FEEDER | - | ||||
C | PEMASANGAN KABEL TRAY ARUS KUAT & ARUS LEMAH | - | ||||
D | PEMASANGAN INSTALASI PENERANGAN & STOPKONTAK LANTAI 1 Berikut Armatur | - | ||||
E | INSTALASI TOILET | - | ||||
F | PEMASANGAN INSTALASI CCTV LANTAI DASAR | - | ||||
G | PEMASANGAN INSTALASI CCTV LANTAI LANTAI 1 | - | ||||
H | PEMASANGAN INSTALASI FIRE ALARM LANTAI 1 , TAMAN PARKING & LANTAI 2 | - | ||||
I | PEMASANGAN INSTALASI TATA SUARA LANTAI 1 & LANTAI 2 | - | ||||
J | PEMASANGAN INSTALASI Kabel Utp Data LANTAI 1 & LANTAI 2 | - | ||||
K | TEST COMUISONING | - | ||||
IV. | PLUMBING, SPRINKLER / HYDRANT DAN TATA UDARA | - | ||||
A. | PEKERJAAN PLUMBING | - | ||||
B. | SPRINKLER DAN HYDRANT | - | ||||
C. | PEKERJAAN TATA UDARA | - | ||||
JUMLAH (I+II_+III+IV) | - | |||||
PAJAK 11% | - | |||||
JUMLAH TOTAL | - | |||||
DIBULATKAN | - | |||||
Terbilang : | ||||||
BILLING OF QUANTITY | ||||||
(BOQ) | ||||||
PEKERJAAN | : PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT. JASA RAHARJA | |||||
LOKASI | : JL. HR. RASUNA SAID KAV. C2 JAKARTA SELATAN | |||||
TAHUN | : 2022 | |||||
No. | URAIAN PEKERJAAN | SAT. | VOL. | HARGA | JUMLAH | |
SATUAN | HARGA | |||||
(Rp.) | (Rp.) | |||||
1 | 2 | 3 | 4 | 5 | 6 = (4X5) | |
I. | PEKERJAAN ARSITEKTUR | |||||
A. | PEKERJAAN PERSIAPAN | |||||
1 | Mobilisasi dan demobilisasi | ls | 1.00 | |||
2 | Pengukuran & pasang papan acuan bouwplank | m' | 190.00 | |||
3 | Papan nama proyek | ls | 1.00 | |||
Fasilitas Konstruksi dan Pengendalian Sementara | ||||||
4 | Pembersihan lokasi kerja sebelum, selama dan sesudah | m² | 585.00 | |||
proyek berlangsung. | ||||||
5 | Buang tanah / puing keluar lokasi | ls | 1.00 | |||
6 | Kantor Lapangan / Direksi Kit | m² | 9.00 | |||
7 | Gudang Bahan dan Los kerja | m² | 27.00 | |||
8 | Fasilitas Air dan listrik kerja sementara | ls | 1.00 | |||
9 | Pek.Pas.Pagar Pengaman t. 1.8 m | m' | 198.00 | |||
10 | Biaya K3 (Asuransi dan alat keselamatan) rincian terlampir | ls | 1.00 | |||
11 | As Builtdrawing, Shopdrawing dan Dokumentasi | ls | 1.00 | |||
12 | Pekerjaan bongkar atap membran | m² | 780.00 | |||
13 | Sewa crane 3 ton | ls | 1.00 | |||
JUMLAH PEKERJAAN PERSIAPAN | - | |||||
B. | PEK. SIPIL ARSITEKTUR | |||||
1 | Dinding Hebel ( Toilet + R. Manajemen ) dim. 10x20x60 | m2 | 451.62 | |||
2 | Plester dinding ( Toilet + R. Manajemen ) ex. Mortar Mu-301 | m2 | 903.24 | |||
3 | Acian Dinding ( R. Manajemen ) ex. Mortar Mu-200 | m2 | 828.24 | |||
4 | Rangka Baja Ringan Dinding 70x50 C.75 | m2 | 658.36 | |||
5 | Pu Foam Insulation(Plafond)BARB Spray2005 Ex. IPU Tebal 2.5 cm | m2 | 430.82 | |||
6 | Plafond Gypsum Toilet + Manajemen | m2 | 146.38 | |||
- Rangka Plafond baja ringan 40x40 0,3mm | ||||||
- Gypsum board ex. Jayaboard 9mm | ||||||
7 | Plafond Gypsum Aula | m2 | 221.64 | |||
- Rangka Plafond baja ringan 40x40 0,3mm | ||||||
- Gypsum board ex. Jayaboard 9mm | ||||||
8 | Pengecatan Plafond | m2 | 221.64 | |||
9 | Plafond HPL | m2 | 209.18 | |||
- Rangka Plafond baja ringan 40x40 0,3mm | ||||||
- Rangka Besi Perkuatan tambahan dan penggantung 30x60mm 1,3mm modul 120x240cm + Penggantung 3 meter | ||||||
- Multiplex 9mm fin. HPL ex. Carta CT-5264 T & CT-5266 T | ||||||
10 | Lisplank ex. Seven Aluminium Composite | Zq | ||||
- Single pipe 3inch Fin. Duco | m' | 62.00 | ||||
- Aluminium Composite ex. Seven + Rangka Besi Siku 30x30mm tebal 2,2mm | m' | 106.00 | ||||
11 | Railing Besi Koridor + Tangga Utama Fin. Epoxy ( Cat Dasar ) | m' | 116.60 | |||
- Balustrade pipa bulat ½inci 1,1mm | ||||||
- Ornamen hollow kotak 30x30 1,3mm Tinggi:15cm | ||||||
- Finishing epoxy (cat dasar) | ||||||
- Handrail merbabu dan finishing di tahap 2 | ||||||
12 | Talang air Stainless | m' | 98.00 | |||
- Plat Stainless 0,4mm | ||||||
- Rangka Besi Siku 40x40mm tebal 2,5mm | ||||||
13 | Sumur Resapan | titik | 3.00 | |||
JUMLAH PEKERJAAN SIPIL ARSITEKTUR | - | |||||
JUMLAH PEKERJAAN ARSITEKTUR | - | |||||
II. | PONDASI DAN STRUKTUR | |||||
A. | PEKERJAAN TANAH | |||||
1 | Galian Pondasi | m3 | 88.93 | |||
2 | Pasir Urug, t = 10 cm | m3 | 11.76 | |||
3 | Lantai Kerja, t = 5 cm | m3 | 5.88 | |||
JUMLAH PEKERJAAN TANAH | - | |||||
B. | PEKERJAAN PONDASI | |||||
1 | Pekerjaan Tiang Pancang | |||||
- Mobilisasi Alat Pancang | Unit | 1.00 | ||||
- Pengadaan Tiang Pancang Triangel Pile 300 mm (L=8m, 44 titik) | m | 339.36 | ||||
- Pemancangan dengan Injection Pile | m | 339.36 | ||||
- Pemotongan kepala tiang pancang | Titik | 42.00 | ||||
- Pekerjaan sambungan (1 kali sambungan) | Titik | 42.00 | ||||
- Test PDA | Titik | 5.00 | ||||
2 | Pile cap P1/P1A 1.5x1.5x0.85 | |||||
- Beton K-350 | m3 | 15.30 | ||||
- Pembesian | kg | 1,006.43 | ||||
- Bekisting pondasi | m2 | 40.80 | ||||
3 | Pile cap P2 2,25x1.8x0.85 | |||||
- Beton K-350 | m3 | 6.89 | ||||
- Pembesian | kg | 734.95 | ||||
- Bekisting pondasi | m2 | 13.77 | ||||
4 | Pile cap P3/P3A 2,25x2,25x0.9 | |||||
- Beton K-350 | m3 | 8.56 | ||||
- Pembesian | kg | 1,768.07 | ||||
- Bekisting pondasi | m2 | 18.52 | ||||
5 | Pile cap P4 2,5x2.5x0.9 | |||||
- Beton K-350 | m3 | 11.25 | ||||
- Pembesian | kg | 1,034.08 | ||||
- Bekisting pondasi | m2 | 18.00 | ||||
6 | Pile cap P5 3,0x2.5x0.9 | |||||
- Beton K-350 | m3 | 12.75 | ||||
- Pembesian | kg | 1,164.32 | ||||
- Bekisting pondasi | m2 | 18.70 | ||||
JUMLAH PEKERJAAN PONDASI | - | |||||
C. | PEKERJAAN LOWER STRUKTUR | |||||
1 | Tie beam TB1 30/50 | |||||
- Beton K-350 | m3 | 28.71 | ||||
- Pembesian | kg | 8,043.85 | ||||
- Bekisting balok | m2 | 191.40 | ||||
2 | Pedestal 750/750 | |||||
- Beton K-350 | m3 | 6.30 | ||||
- Pembesian | kg | 617.15 | ||||
- Bekisting Kolom | m2 | 33.60 | ||||
- Plat t= 20mm | Kg | 1,055.04 | ||||
3 | Pedestal 900/900 | |||||
- Beton K-350 | m3 | 11.34 | ||||
- Pembesian | kg | 1,025.94 | ||||
- Bekisting Kolom | m2 | 50.40 | ||||
- Plat t= 20mm | Kg | 1,004.80 | ||||
JUMLAH PEKERJAAN LOWER STRUKTUR | - | |||||
D. | PEKERJAAN UPPER STRUKTUR | |||||
1 | Kolom DIA. 70 | |||||
- Beton K-350 | m3 | 26.40 | ||||
- Pembesian | kg | 953.87 | ||||
- Bekisting Kolom | m2 | 140.80 | ||||
- Angkur M-22, inc; Baut | Titik | 40.00 | ||||
- Plat t= 20mm | Kg | 401.92 | ||||
2 | Kolom Praktis | |||||
Beton k-250 | m3 | 2.40 | ||||
Pembesian | kg | 832.40 | ||||
Bekisting | m2 | 44.52 | ||||
3 | Plat Lantai Cor | |||||
Beton K-350 | m3 | (3.60) | ||||
M10-2 Layer | kg | (255.30) | ||||
Bondek 0.75 | m2 | (30.00) | ||||
Bekisting | m2 | 195.00 | ||||
4 | Pek. Baja | |||||
HBEAM 350.350.12.19; Inc Plat + Las Angkur | kg | - | ||||
WF.250.125.6.9; Inc Plat + Las Angkur | kg | - | ||||
WF.300.150.6,5.9; Inc Plat + Las Angkur | kg | - | ||||
WF.400.200.8.13; Inc Plat + Las Angkur | kg | - | ||||
WF.600.200.11.17; Inc Plat + Las Angkur | kg | - | ||||
WF.600.300.12.20; Inc Plat + Las Angkur | kg | - | ||||
Angkur m22 | pcs | 424.00 | ||||
Mur Baut 22 | pcs | 4,854.00 | ||||
Mur Baut 19 | pcs | - | ||||
5 | Tangga Utama (2 unit) | |||||
- Beton Cor k.250 | m3 | 8.34 | ||||
- Bekisting tangga | m2 | 34.78 | ||||
- Pembesian | kg | 650.52 | ||||
6 | Pondasi Tangga | |||||
- Beton Cor k.250 | m3 | 1.40 | ||||
- Bekisting Pondasi | m2 | 14.00 | ||||
- Pembesian | kg | 109.20 | ||||
7 | Tangga Service Manajemen (2 unit) | |||||
- Beton Cor k.250 | m3 | 4.24 | ||||
- Bekisting tangga | m2 | 29.78 | ||||
- Pembesian | kg | 330.72 | ||||
8 | Tangga Service Operator + Bordes | unit | 2.00 | |||
- Besi Unp 100 fin. Epoxy cat dasar | ||||||
- Hollow 40x40mm tebal 1,6mm fin. Epoxy ( Cat dasar ) | ||||||
- Multipleks Meranti 18mm | ||||||
- Finishing Besi Duco dan finishing kayu parquet di tahap 2 | ||||||
9 | Bak Bunga Beton | |||||
- Beton Cor k.250 | m3 | 6.80 | ||||
- Pembesian | kg | 340.00 | ||||
- Bekisting | m2 | 60.00 | ||||
JUMLAH PEKERJAAN UPPER STRUKTUR | - | |||||
E. | PEKERJAAN ATAP | |||||
1 | Pek. Atap Cremona besi pipa medium 2 inch t = 2.9 mm dan 3 inch t = 3.2 mm, fin. Duco ( Rangka Atap Bangunan ) | m2 | 758.44 | |||
Atap spandek 0,4mm + Aluminium foil dua sisi + Poly Foam | m2 | 788.44 | ||||
Rangka Baja ringan ( Atap ruang operator ) | m2 | 30.00 | ||||
JUMLAH PEKERJAAN ATAP | - | |||||
JUMLAH PEKERJAAN PONDASI DAN STRUKTUR | - |
BILLING OF QUANTITY | |||||||||
(BOQ) | |||||||||
PEKERJAAN | : PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT. JASA RAHARJA | ||||||||
LOKASI | : JL. HR.RASUNA SAID KAV. C2 JAKARTA SELATAN | ||||||||
TAHUN | : 2022 | ||||||||
III. | ELEKTRIKAL | ||||||||
NO | URAIAN | VOL. | SAT. | HARGA | JUMLAH | ||||
SATUAN ( Rp ) | ( Rp ) | ||||||||
A | PEMASANGAN PANEL | ||||||||
Panel AC | |||||||||
- | Pek.Pemasangan Box Wall Mounted Ukuran L60x80x20cm | 1.00 | Unit | ||||||
- | SURGE ARESTER V25 OBO 25 ka | 1.00 | Unit | ||||||
- | MCCB 100 Ampere 3 pole NSX | 1.00 | Unit | ||||||
- | MCCB 3 Phase 30 Ampere 4 POLE Schneider Type NSX | 6.00 | Unit | ||||||
- | MCB 1 Phase 20 Ampere 4,5 KA Domae | 6.00 | Bh | ||||||
- | Pilot Lamp | 6.00 | Bh | ||||||
- | Ampere Meter Analog 150/5a | 3.00 | Bh | ||||||
- | Seletor Volt Schneider | 1.00 | Bh | ||||||
- | Volt Meter Analog 500v | 1.00 | Bh | ||||||
- | Schneider CT 200/5a/ | 3.00 | Bh | ||||||
- | Busbar Tembaga Ukuran 4x25mm | 4.00 | M' | ||||||
- | Material Bantu | 1.00 | Lot | ||||||
- | |||||||||
Panel Stopkontak | |||||||||
- | Pek.Pemasangan Box Wall Mounted Ukuran L60x80x20cm | 1.00 | Unit | ||||||
- | MCCB 3 Phase 160 Ampere 3 Pole NSX | 1.00 | Unit | ||||||
- | MCCB 3 Phase 30 Ampere 4 POLE Schneider Type NSX | 6.00 | Unit | ||||||
- | MCB 1 Phase 20 Ampere 4,5 KA Domae | 10.00 | Bh | ||||||
- | Pilot Lamp | 3.00 | Bh | ||||||
- | Ampere Meter Analog 150/5a | 3.00 | Bh | ||||||
- | Volt Meter Analog 500v | 1.00 | Bh | ||||||
- | Seletor Volt Schneider | 1.00 | Bh | ||||||
- | Schneider CT 200/5a/ | 1.00 | Bh | ||||||
- | Busbar Tembaga Ukuran 4x25mm | 3.00 | M' | ||||||
- | Material Bantu ( Skun Kabel,Kabel Wiring,Pinil DLL ) | 1.00 | Lot | ||||||
- | |||||||||
Panel Penerangan | |||||||||
- | Pek.Pemasangan Box Panel Wall Mounted Ukuran L40xD20xT60cm | 1.00 | Unit | ||||||
- | Volt Meter Analog 500v | 1.00 | Unit | ||||||
- | MCCB 3 phase 50 ampere EZC | 1.00 | Unit | ||||||
- | Busbar Tembaga Ukuran 4x25mm | 3.00 | M' | ||||||
- | Ampere Meter Analog 150/5a | 3.00 | Bh | ||||||
- | Volt Meter Analog 500v | 1.00 | Bh | ||||||
- | Seletor Volt Schneider | 1.00 | Bh | ||||||
- | Schneider CT 200/5a/ | 3.00 | M' | ||||||
- | Material Bantu ( Skun Kabel,Kabel Wiring,Pinil DLL ) | 1.00 | Lot | ||||||
- | |||||||||
JUMLAH PEMASANGAN PANEL | - | ||||||||
B | PEMASANGAN KABEL FEEDER | ||||||||
Pengerjaan berikut dengan gali timbun,pipa ,asesories DLL | |||||||||
- | Kabel NYY 4x50mm2 dari RUANG ME Ke panel AC | 28.00 | M' | ||||||
- | Kabel NYY 4x50mm2 dari RUANG ME Ke panel Stopkontak | 28.00 | M' | ||||||
- | Kabel NYY 4x4mm2 dari RUANG ME Ke Penerangan | 28.00 | M' | ||||||
- | Kabel NYY 4x16mm2 dari Panel Ac ke Outdoor AC | 72.00 | M' | ||||||
- | Kabel NYY 4x4mm2 dari Panel Ac Outdoor AC Cassette | 94.00 | M' | ||||||
JUMLAH PEMASANGAN KABEL FEEDER | - | ||||||||
C | PEMASANGAN KABEL TRAY ARUS KUAT & ARUS LEMAH | ||||||||
Instalasi Kabel Tray Lengkap dengan Asesories | |||||||||
- | TRAY GALVANIS Type C Electro Ukuran 10x300x3000 | 64.00 | M' | ||||||
- | Outsider Tray Ukuran 10x400 | 4.00 | Bh | ||||||
JUMLAH PEMASANGAN KABEL TRAY ARUS KUAT & ARUS LEMAH | - | ||||||||
D | PEMASANGAN INSTALASI PENERANGAN & STOPKONTAK LANTAI 1 Berikut Armatur | ||||||||
Pemasangan instalasi lengkap dengan conduit,asesories DLL | |||||||||
- | Instalasi Penerangan Kabel NYA 3x2,5mm2 | 142.00 | Titik | ||||||
- | Instalasi StopKontak | 22.00 | Titik | ||||||
- | Lampu Gantung VINTAGE 10 WAT led Bulb Warm White | 12.00 | unit | ||||||
- | Lampu Led Selang 6,6Watt | 245.00 | mtr | ||||||
- | Lampu PHILLIPS led Bulb 10 Watt E27 Warm White | 4.00 | Bh | ||||||
- | Lampu Downlight PinHole 10 Watt Nerolight | 48.00 | Bh | ||||||
- | Lampu RMI TL LED 2x16 Watt | 4.00 | Set | ||||||
- | Lampu Track COB 20 Watt Spot | 12.00 | Bh | ||||||
- | Track Light Panjang 2 meter | 3.00 | Batang | ||||||
- | Saklar Clypsal 6 Digit | 4.00 | Set | ||||||
- | Stop kontak 200Va | 8.00 | Bh | ||||||
- | Stop kontak Lantai Panasonic | 3.00 | Set | ||||||
JUMLAH PEMASANGAN INSTALASI PENERANGAN & STOPKONTAK LANTAI 1 Berikut Armatur | - | ||||||||
E | INSTALASI TOILET | ||||||||
- | Instalasi Penerangan Kabel NYA 3x2,5mm2 | 24.00 | Titik | ||||||
- | Instalasi StopKontak | 2.00 | Titik | ||||||
- | Exhaust Fan 8 Inch Maspion Cerobong | 8.00 | Set | ||||||
- | Saklar Seri | 4.00 | Bh | ||||||
- | Stop kontak 200Va | 2.00 | Bh | ||||||
JUMLAH INSTALASI TOILET | - | ||||||||
F | PEMASANGAN INSTALASI CCTV LANTAI DASAR | ||||||||
Pemasangan dan pengadaan lengkap dengan asesories conduit ,klem DLL | |||||||||
- | Instalasi CCTV Kabel | 9.00 | Titik | ||||||
- | Kabel HDMI / 50 Mtr BAFO | 1.00 | Lot | ||||||
Kabel HDMI /30 MTR | 1.00 | Lot | |||||||
- | TV LED 32 Inch Lengkap Dengan Bracket | 2.00 | Unit | ||||||
JUMLAH PEMASANGAN INSTALASI CCTV LANTAI DASAR | - | ||||||||
G | PEMASANGAN INSTALASI CCTV LANTAI 1 | ||||||||
Pemasangan dan pengadaan lengkap dengan asesories conduit ,klem DLL | |||||||||
- | Pek.Pemasangan Instalasi CCTV | 19.00 | Titik | ||||||
- | DVR 16 Channel 5MP 1080 (EDGE,DAHUA,SAMSUNG) | 2.00 | Unit | ||||||
- | CCTV OUTDORR Hybrid 5Mp 4in1 Netal ( EDGE,HIKVISION,DAHUA,DLL ) | 5.00 | Unit | ||||||
- | CCTV INDOOR Hybrid 5Mp 4in1 Netal ( EDGE,HIKVISION,DAHUA,DLL ) | 14.00 | Unit | ||||||
- | HDD 1 TERRA | 1.00 | Unit | ||||||
- | Power Suply 20 Output 20 Ampere | 2.00 | Unit | ||||||
- | TV LED 40 Inch Lengkap Dengan Bracket | 1.00 | Unit | ||||||
JUMLAH PEMASANGAN INSTALASI CCTV LANTAI 1 | - | ||||||||
H | PEMASANGAN INSTALASI FIRE ALARM LANTAI 1 , TAMAN PARKING & LANTAI 2 | ||||||||
Pemasangan dan pengadaan lengkap dengan asesories conduit ,klem DLL | |||||||||
- | Instalasi Fire Alarm Kabel NYA 2x(1x1,5mm2) | 18.00 | Titik | ||||||
- | Instalasi Fire Alarm Kabel Nyy 3x(4x1,5 ) Dari MCFA ke Anunsiator | 38.00 | M' | ||||||
- | Smoke DETECTOR | 18.00 | Bh | ||||||
- | ALARM BELL | 4.00 | Bh | ||||||
- | Manual Call Point ( MCP) | 4.00 | Bh | ||||||
- | INDICATOR LAMP | 4.00 | Bh | ||||||
- | MCFA (Main Control Fire Alarm ) 5 Zone | 1.00 | Unit | ||||||
- | ANUNSIATOR 5 ZONE | 1.00 | Unit | ||||||
JUMLAH PEMASANGAN INSTALASI FIRE ALARM LANTAI 1, TAMAN PARKING & LANTAI 2 | - | ||||||||
I | PEMASANGAN INSTALASI TATA SUARA LANTAI 1 & LANTAI 2 | ||||||||
Pemasangan dan pengadaan lengkap dengan asesories conduit ,klem DLL | |||||||||
- | Instalasi Tata Suara Kabel Nyyhy 2x1,5mm2 | 12.00 | Titik | ||||||
JUMLAH PEMASANGAN INSTALASI TATA SUARA LANTAI 1 & LANTAI 2 | - | ||||||||
J | PEMASANGAN INSTALASI Kabel Utp Data LANTAI 1 & LANTAI 2 | ||||||||
Pemasangan dan pengadaan lengkap dengan asesories conduit ,klem DLL | |||||||||
- | Instalasi Kabel Data | 7.00 | Titik | ||||||
- | TP LINK EAP 115 300mbps Celling Mounted Access Point | 7.00 | Unit | ||||||
- | |||||||||
JUMLAH PEMASANGAN INSTALASI Kabel Utp Data LANTAI 1 & LANTAI 2 | - | ||||||||
K | TEST COMUISONING | 1.00 | Lot | ||||||
JUMLAH TOTAL BIAYA ELEKTRIKAL | - |