253x Filetype PDF File size 2.26 MB Source: www.indresinc.com
CABLE SPLICING AND TERMINATION
TRAINING SYSTEM EQUIPMENT MAINTENANCE DESCRIPTION (IRI-EM19)
INDUSTRIAL RESOURCES, INC.
A TRAINING SERVICES COMPANY
©This document is the property of Industrial Resources, Inc. Copies and distribution of this document is prohibited
unless written authorization is granted by Industrial Resources, Inc.
Cable Splicing and Termination
(IRI-EM19)
PREFACE
This Training Equipment Maintenance Description (EMD) has been designed to assist you in
meeting the requirements of Module IRI-EM19 of the Electrical Distribution Training Program. It
contains information about the Power Plant, Cable Splicing and Termination. This includes
function, quantity of parts, location of parts, description of the physical construction of the part, and
description of the operation of the part, equipment preventive and corrective maintenance, and
references.
You should review each chapter objective. In doing so you will be better prepared to learn the
required information. You should also inspect the equipment identifying the components and
controls. Should you have additional questions about the equipment, ask your supervisor.
A separate document, Cable Splicing and Termination Equipment Maintenance Procedure (IRI-
EM19-EMP), covers detailed maintenance of the Cable Splicing and Termination.
Page 1
Cable Splicing and Termination
(IRI-EM19)
CABLE SPLICING AND TERMINATION
TRAINING EQUIPMENT MAINTENANCE DESCRIPTION
TABLE OF CONTENTS
1.0 Introduction ......................................................................................................................... 5
1.1 Equipment Function ............................................................................................................ 5
1.2 Equipment Description ....................................................................................................... 5
1.3 Equipment Connections and Interface ................................................................................ 6
2.0 Equipment Major Parts ....................................................................................................... 7
2.1 Cable Splicing and Termination Equipment ....................................................................... 7
2.2 Preparing the Cable for Termination .................................................................................. 9
2.3 Attaching the Cable Lug ................................................................................................... 14
2.4 Cleaning the Cable ............................................................................................................ 15
2.5 Applying Stress Relief Material to the Cable ................................................................... 16
2.6 Positioning and Shrinking the Stress Relief Tube on the Cable ....................................... 16
2.7 Grounding the Cable Shield .............................................................................................. 18
2.8 Applying Sealant to the Cable .......................................................................................... 20
2.9 Placing and Shrinking the HV Tube on the Cable ............................................................ 21
2.10 Completing Outdoor Termination of the Cable ................................................................ 22
3.0 Equipment Preventive and Corrective Maintenance ......................................................... 25
3.1 Cable Splicing and Termination Preventive Maintenance................................................ 25
3.2 Cable Splicing and Termination Corrective Maintenance ................................................ 25
4.0 References .......................................................................... Error! Bookmark not defined.
Appendix 1 - Cable Splicing and Termination Kits..................................................................... 26
Page 2
Cable Splicing and Termination
(IRI-EM19)
List of Figures:
Figure 1 – Determining the Required Amount of Insulation Cutback
Figure 2 – Insulation Cutback for Cable Shielded with Copper Tape
Figure 3 – Installing Ground Braid on Cable Shielded with Copper Tape
Figure 4 – Insulation Cutback for Cable Shielded with Wire
Figure 5 – Installing the Lug on Wire Shielded Cable
Figure 6 – Insulation Cutback for Cable with UniShield
Figure 7 – Installing Lug for Cable with UniShield
Figure 8 – Insulation Cutback for Cable with Lead Sheath
Figure 9 – Soldering the Ground Braid for Cable With Lead Sheath
Figure 10 – Positioning the Ground Braid for Cable with Lead Sheath
Figure 11 – Applying Red Sealant to Lug Barrel
Figure 12 – Installing the Shim Tube
Figure 13 – Abrading and Cleaning the Cable
Figure 14 – Applying Stress Relief Material to Cable
Figure 15 – Positioning and Shrinking Stress Relief Tube
Figure 16 – Preparing to Ground Cable with Copper Tape or Lead Sheath
Figure 17 – Applying Red Sealant to Cable
Figure 18 – Applying More Red Sealant to Cable
Figure 19 – Preparing to Ground Wire Shield or UniShield
Figure 20 – Cleaning the Jacket for Wire Shield or UniShield
Figure 21 – Continue Wrapping Red Sealant for Wire Shield or UniShield
Figure 22 – Applying Sealant to Cable at Lug
Figure 23 – Applying Sealant to Cable with No Lug
Figure 24 – Placing and Shrinking HV Tube on Cable
Figure 25 – Trimming the HV Tube on Cable
Figure 26 – Positioning Skirt on Cable
Figure 27 – Positioning Skirt for Top Feed Termination
Figure 28 – Adding Extra Skirts on Cable
Page 3