Title Document No. Revision
Building Demolition Plan NFSS-0010 REV.0
Building Demolition Plan
Niagara Falls Storage Site
Building 401 Demolition
Lewiston, New York
Contract No. W912P4-07-D-0003-0002
Prepared by:
TPMC-EnergySolutions Environmental Services, LLC
Prepared for the
U.S. Army Corps of Engineers, Buffalo District
Buffalo, New York
AUGUST 2010
TES i AUGUST 2010
W912P4-07-D-0003-0002 REV.0
Title Document No. Revision
Building Demolition Plan NFSS-0010 REV.0
Building Demolition Plan
Building 401 Demolition
Niagara Falls Storage Site
Building Demolition Plan
Prepared By: 10 AUGUST 2010
Date
Reviewed By: 10 AUGUST 2010
, PMP Date
Approved By: 10 AUGUST 2010
, PM / CQC System Manager Date
X New Plan
Title Change
Plan Revision
Plan Rewrite
Effective
Date 10 AUG 2010
TES ii AUGUST 2010
W912P4-07-D-0003-0002 REV.0
Title Document No. Revision
Building Demolition Plan NFSS-0010 REV.0
CERTIFICATION OF INDEPENDENT TECHNICAL REVIEW
COMPLETION OF INDEPENDENT TECHNICAL REVIEW
TES, LLC (TES) has DRAFTED the Building Demolition Plan for the Niagara Falls Storage Site
Building 401 Demolition Project located in Lewiston, New York. Notice is hereby given that an
independent technical review has been conducted that is appropriate to address all regulatory and
compliance issues appropriate to the Niagara Falls Storage Site Building 401 demolition, as defined in the
TES NFSS Building Demolition Plan. During the independent technical review, compliance with
established policy principles and procedures, utilizing justified and valid assumptions, was verified. This
included review of assumptions; methods, procedures, and material used in analyses; alternatives
evaluated; the appropriateness of data used and level of data obtained; and reasonableness of the results,
including whether the product meets the customer’s needs consistent with existing USACE policy.
Signature/TES Report Preparer
Date 26 JULY 2010
Signature/TES Independent Technical Reviewer
Date 26 JULY 2010
Signature/TES Independent Technical Reviewer
Date 26 JULY 2010
Signature/TES Independent Technical Reviewer
Date 26 JULY 2010
Independent Technical Review Team Members:
CERTIFICATION OF INDEPENDENT TECHNICAL REVIEW
Significant concerns and the explanation of the resolution are as follows:
Item Technical Concerns Possible Impact Resolutions
Demolition Plan
1 See attached sheets
As noted above, all concerns resulting from independent technical review of the plan have been resolved.
Signature/ Date 26 JULY 2010
TES iii AUGUST 2010
W912P4-07-D-0003-0002 REV.0
Title Document No. Revision
Building Demolition Plan NFSS-0010 REV.0
TABLE OF CONTENTS
1.0 INTRODUCTION............................................................................................................. 1
1.1 OVERVIEW................................................................................................................... 1
1.2 BACKGROUND.............................................................................................................. 1
2.0 SEQUENCE OF OPERATIONS..................................................................................... 2
2.1 PRE-DEMOLITION ACTIVITIES INCLUDING:.................................................................. 2
2.2 DETAILED DESCRIPTION OF DEMOLITION PROCESS....................................................... 2
2.3 CONTROL MEASURES................................................................................................... 2
2.4 RIGGING AND LIFTING................................................................................................. 3
3.0 SITE MOBILIZATION................................................................................................... 3
3.1 EQUIPMENT.................................................................................................................. 3
3.2 PERSONNEL.................................................................................................................. 4
4.0 PRE-DEMOLITION ACTIVITIES................................................................................ 5
4.1 UTILITY ABANDONMENT............................................................................................. 5
4.2 BUILDING 401 STRUCTURAL INTEGRITY EVALUATION................................................ 5
4.3 HAZARDOUS MATERIALS CHARACTERIZATION........................................................... 6
4.4 PRE-DEMOLITION ACM SURVEY................................................................................. 6
5.0 ASBESTOS ABATEMENT............................................................................................. 7
5.1 TRANSITE..................................................................................................................... 8
5.2 CAULK......................................................................................................................... 8
5.3 GALBESTOS.................................................................................................................. 8
6.0 HAZARDOUS MATERIAL IDENTIFICATION AND REMOVAL.........................9
6.1 ANIMAL MATERIAL NEUTRALIZATION........................................................................ 9
6.2 LEAD BASED PAINT (LBP)........................................................................................ 10
7.0 BUILDING PREPARATIONS...................................................................................... 11
7.1 TRENCH AND DRAIN PLUGGING................................................................................. 11
7.2 RADIOLOGICAL CONTAMINATION ABATEMENT......................................................... 11
7.3 PREMATURE COLLAPSE / COMPETENT PERSON.......................................................... 12
7.4 FIRE SAFETY PROCEDURES / PREVENTION................................................................. 13
7.5 WORK AREA INGRESS/EGRESS.................................................................................. 13
7.6 SEVERE WEATHER STOPPAGE CONSIDERATION......................................................... 13
8.0 DEMOLITION ACTIVITIES....................................................................................... 14
8.1 WATER MANAGEMENT.............................................................................................. 14
8.2 DUST CONTROL METHODS......................................................................................... 15
8.3 STRUCTURE DEMOLITION.......................................................................................... 16
8.3.1 Silo Demolition 16
8.3.2 Building 401 Demolition 16
TES iv AUGUST 2010
W912P4-07-D-0003-0002 REV.0