            HEALTH AND SAFETY - SCHOOL CONSTRUCTION WORK 
                     
                     
                     
                     
                     
                     
        
        
       CDM 2015 
       GUIDANCE FOR SCHOOLS 
        
        
        
                           
                           
                           
                           
                           
                           
                           
                                     Page 1 | 11 
        
                               HEALTH AND SAFETY - SCHOOL CONSTRUCTION WORK 
                                                          INTRODUCTION 
                  
                 Construction work can involve many different people, doing many different things at 
                 different times. It means everyone has a role to play in managing construction health 
                 and safety risks. This can include the person/s commissioning construction work, 
                 known as the client. 
                  
                 The Construction (Design and Management) Regulations (CDM 2015) are the main 
                 set of regulations for managing health, safety and welfare on construction projects. 
                  
                 CDM applies to all building and construction work and includes new build, demolition 
                 work, refurbishment, extensions, conversions, repair and maintenance.  
                  
                 London Borough of Hammersmith & Fulham employees may commission work that 
                 comes under the definition of construction work and hence will need to be aware of 
                 their role and responsibilities as the client under CDM 2015. 
                  
                                                         CDM OVERVIEW 
                 Construction work can be dangerous and often involves multiple parties having to 
                 work together to ensure the project is run safely. The purpose of CDM 2015 is to: 
                  
                     •   Manage construction work health and safety risks by applying the general 
                         principles of prevention contained in CDM 2015 
                     •   Ensure the right (competent) persons and/or organisations are appointed at 
                         the right time  
                     •   Ensure the right information, instruction, training and supervision needed to 
                         carry out construction work safely is provided to the right people 
                     •   Ensure all legal duty holders cooperate, communicate and co-ordinate their 
                         work 
                  
                 CDM 2015 is divided into five parts: 
                  
                     •   Part 1 deals with the application of CDM 2015 and definitions 
                     •   Part 2 covers the duties of clients for all construction projects. These duties 
                         apply in full for commercial clients. However, the duties for domestic clients 
                         normally pass to other dutyholders 
                     •   Part 3 covers the health and safety duties and roles of other dutyholders, 
                         including:  
                     i)      Designers 
                     ii)     Principal designers 
                     iii)    Principal contractors 
                     iv)     Contractors 
                     •   Part 4 contains general requirements for all construction sites  
                     •   Part 5 contains transitional arrangements and revocations  
                  
                  
                                                                     
                                                                     
                                                                                                    Page 2 | 11 
                  
                           HEALTH AND SAFETY - SCHOOL CONSTRUCTION WORK 
                                                   KEY PLAYERS 
                
               There are several key players involved with CDM 2015. The table below details 
               these players and summarises the roles and responsibilities: 
                
                           ROLE                                  RESPONSIBILITIES 
               A client is an organisation or   A client has responsibility to make suitable 
               individual having a              arrangements for managing a project. This includes 
               construction project carried     ensuring: 
               out in connection with a             •  the client brief is completed 
               business                             •  other duty holders (if more than one contractor 
                                                       is to be appointed) are appointed 
                                                    •  sufficient time and resources are allocated 
                                                    •  relevant information is prepared and provided 
                                                       to other duty holders 
                                                    •  the principal designer and principal contractor 
                                                       carry out their duties 
                                                    •  welfare facilities are provided  
               A designer is someone who        The designer’s role when preparing or modifying 
               as part of a business,           designs is to eliminate, reduce or control foreseeable 
               prepares or modifies designs     risks that may happen during construction or 
               for a building, product or       maintenance and use of a building after it’s been 
               system relating to               built. The designer also provides information to other 
               construction work                members of the project team to help them fulfil their 
                                                duties. 
                                                 
               A principal designer is          The principal designer is responsible for planning, 
               appointed by the client of       managing, monitoring and coordinating health and 
               projects with more than one      safety in the pre-construction phase of a project. This 
               contractor. It can be an         includes: 
               organisation or an individual        •  identifying, eliminating or controlling 
               with sufficient knowledge,              foreseeable risks 
               experience and ability to            •  ensuring designers carry out their duties. 
               carry out the role                   •  preparing and providing relevant information 
                                                       to other dutyholders. 
                                                 
                                                The principal designer also liaises with the principal 
                                                contractor to help in the planning, management and 
                                                monitoring of the health and safety in the 
                                                construction phase. 
               A contractor is the individual  The contractor’s duty is to: 
               or organisation doing the            •  plan, manage and monitor construction work 
               actual construction work.               under their control so that it is carried out 
                                                       without risks to health and safety. 
                                                    •  for projects involving more than one 
                                                       contractor, co-ordinate their activities with 
                                                       others in the project team – in particular, 
                                                       comply with directions given to them by the 
                                                       principal designer or principal contractor. 
                                                                                       Page 3 | 11 
                
                               HEALTH AND SAFETY - SCHOOL CONSTRUCTION WORK 
                                                           •   for single contractor projects, prepare a 
                                                               construction phase plan. 
                 A principal contractor is             The principal contractor’s duty is to:  
                 appointed by the client to                •   plan, manage, monitor and coordinate health 
                 plan, manage, monitor and                     and safety in the construction phase of a 
                 co-ordinate health and safety                 project 
                 during the construction phase             •   liaise with the client and principal designer 
                 of a project when there’s                 •   prepare the construction phase plan 
                 more than one contractor                  •   organise cooperation between contractors and 
                 involved                                      coordinate their work. 
                                                       They must ensure that: 
                                                           •   suitable site inductions are provided 
                                                           •   reasonable steps are taken to prevent 
                                                               unauthorised access 
                                                           •   workers are consulted and engaged in health 
                                                               and safety matters 
                                                           •   welfare facilities are provided  
                 A worker is an individual             Workers must: 
                 working for or under the                  •   be consulted about matters which affect their 
                 control of contractors on a                   health, safety and welfare 
                 construction site                         •   take care of their own health and safety and 
                                                               others who may be affected by their actions 
                                                           •   report anything they see which is likely to 
                                                               endanger either their own or others’ health 
                                                               and safety  
                                                           •   cooperate with their employer, fellow workers, 
                                                               contractors and other duty holders 
                  
                                                       CDM APPLICATION 
                  
                 CDM 2015 applies to construction projects as a whole that is the whole 
                 construction process from concept to completion (L153). 
                  
                 A construction project means a project which includes or is intended to include 
                 construction work, including planning, design and management of a project until 
                 the end of the construction phase. 
                  
                 Construction work means the carrying out of any building, civil engineering or 
                 engineering construction work on a structure. There are 5 areas defined in CDM 
                 2015 as follows: 
                  
                     a)  the construction, alteration, conversion, fitting out, commissioning, renovation, 
                         repair, upkeep, redecoration or other maintenance (including cleaning which 
                         involves the use of water or an abrasive at high pressure, or the use of 
                         corrosive or toxic substances), de-commissioning, demolition or dismantling of 
                         a structure 
                     b)  the preparation for an intended structure, including site clearance, exploration, 
                         investigation (but not site survey) and excavation (but not pre-construction 
                                                                                                    Page 4 | 11 
                  
The words contained in this file might help you see if this file matches what you are looking for:

...Health and safety school construction work cdm guidance for schools page introduction can involve many different people doing things at times it means everyone has a role to play in managing risks this include the person s commissioning known as client design management regulations are main set of welfare on projects applies all building includes new build demolition refurbishment extensions conversions repair maintenance london borough hammersmith fulham employees may commission that comes under definition hence will need be aware their responsibilities overview dangerous often involves multiple parties having together ensure project is run safely purpose manage by applying general principles prevention contained right competent persons or organisations appointed time information instruction training supervision needed carry out provided legal duty holders cooperate communicate co ordinate divided into five parts part deals with application definitions covers duties clients these appl...

no reviews yet
Please Login to review.