jagomart
digital resources
picture1_Site Management Pdf 84272 | Textileather Smp 2015


 126x       Filetype PDF       File size 1.87 MB       Source: www.epa.gov


File: Site Management Pdf 84272 | Textileather Smp 2015
eport on r site management plan textileather 3729 twining street toledo ohio by haley aldrich inc cleveland ohio for city of toledo toledo ohio file no 36005 15 may 2015 ...

icon picture PDF Filetype PDF | Posted on 13 Sep 2022 | 3 years ago
Partial capture of text on file.
                         
                         EPORT ON 
                        R
                        SITE MANAGEMENT PLAN 
                         
                        TEXTILEATHER 
                        3729 TWINING STREET 
                        TOLEDO, OHIO 
                         
                         
                         
                         
                         
                         
                         
                         
                        BY 
                         Haley & Aldrich, Inc. 
                         Cleveland, Ohio 
                          
                          
                          
                          
                          
                          
                          
                        FOR 
                         City of Toledo 
                         Toledo, Ohio 
                          
                          
                          
                          
                          
                          
                         File No. 36005 
                         15 May 2015  
                         
                  
                 15 May 2015  
                 File No. 36005 
                  
                  
                 City of Toledo 
                 One Government Center, Suite 2250 
                 Toledo, Ohio 43604 
                  
                 Attention:      Bill Burkett 
                  
                 Subject:        Site Management Plan 
                   3729 Twining Street 
                   Toledo, Ohio 
                  
                 Dear Mr. Burkett: 
                  
                  
                 Haley & Aldrich, Inc. (Haley & Aldrich) prepared this Site Management Plan (SMP) on behalf of
                                                                                                                  the City 
                                                              te), located in Toledo, Ohio.  
                 of Toledo for the Textileather Facility (the Si
                  
                 This Site Management Plan (SMP) documents the overall measures required to maintain protection of 
                 human health and the environment at the Site consistent with the requirements of the Order of Consent 
                                                         is plan specifies the general methods necessary to ensure 
                 RCRA‐05‐2015‐0004 and the CA725.  Th
                 compliance with the engineering controls (ECs) required to prevent and/or control human exposure to 
                 Site contaminants.  Compliance with this plan is required until such a time as site remedies/corrective 
                                                                                                                 e that this 
                 measures have been complete and a Site Management Plan is no longer necessary. Please not
                 plan and its attachments are not intended to serve as an investigation or construction specific Health 
                 and Safety Plan (HASP) for the Site. Any activities that would expose people/workers on the Site to 
                 contaminants of concern will require such plans prepared consistent with this SMP. 
                  
                               t the undersigned with any questions you may have. 
                 Please contac
                  
                  
                 Sincerely yours, 
                 HALEY & ALDRICH, INC. 
                  
                  
                  
                  
                  
                 David Veinot      David J. Hagen 
                 Project Manager     Vice President 
                  
                  
                 Enclosures 
                  
                 G:\Projects\36005 Textileather\024 ‐ Corrective Measures Work Plan\2015 Textileather Site Management Plan\2015_0515_HAI_Site Managment Plan_F.docx 
                  
                  
                 TABLE OF CONTENTS 
                                                                                                                           
                                                                                                                     Page 
                                                                                                                           
                 List of Tables                                                                                         iii 
                 List of Figures                                                                                        iii 
                 1.      Introduction                                                                                    4 
                         1.1     BACKGROUND                                                                              4 
                         1.2     SITE HISTORY                                                                            4 
                         1.3     SITE MANAGEMENT REQUIREMENTS                                                            4 
                         1.4     SITE MANAGEMENT PLAN                                                                    5 
                 2.      Excavation Management                                                                           6 
                         2.1     EXCAVATION PERMITTING                                                                   6 
                         2.2     CONTAMINATION PRESENT IN THE SUBSURFACE                                                 6 
                         2.3     EXCAVATION REQUIREMENTS                                                                 6 
                                 2.3.1   Air Monitoring and Vapor Management                                             7 
                                 2.3.2   Soil Screening Methods                                                          7 
                                 2.3.3   Soil Stockpiling                                                                8 
                                 2.3.4   Excavation Soil Characterization                                                8 
                                 2.3.5   Materials Disposal Off‐Site                                                     9 
                                 2.3.6   Underground Utilities                                                           9 
                                 2.3.7   Fluids Management                                                               9 
                                 2.3.8   Cover Restoration                                                               9 
                                 2.3.9   Backfill from Off‐Site Sources                                                 10 
                                 2.3.10  Stormwater Pollution Prevention                                                10 
                                 2.3.11  Excavation Contingency Plan                                                    10 
                                 2.3.12  Other Nuisances                                                                10 
                 3.      Sewer Maintenance                                                                             11 
                 4.      Calender Basement Maintenance                                                                 11 
                         4.1     HEALTH AND SAFETY PRECAUTIONS                                                          11 
                 5.      PZ‐31 NAPL Monitoring                                                                         11 
                  
                  
                 Tables 
                 Figures 
                 Appendix A – Site HASP 
                  
                  
        
       List of Tables 
        
        
       Table No.   Title 
        
       I         Parameter List, Analytical Methods, and Target Quantitation Limits 
        
        
       List of Figures 
        
        
       Figure No.   Title 
        
       1         Site Locus 
        
       2         Site AOIs 
        
        
        
        
        
       iii 
The words contained in this file might help you see if this file matches what you are looking for:

...Eport on r site management plan textileather twining street toledo ohio by haley aldrich inc cleveland for city of file no may one government center suite attention bill burkett subject dear mr prepared this smp behalf the te located in facility si documents overall measures required to maintain protection human health and environment at consistent with requirements order consent is specifies general methods necessary ensure rcra ca th compliance engineering controls ecs prevent or control exposure contaminants until such a time as remedies corrective e that have been complete longer please not its attachments are intended serve an investigation construction specific safety hasp any activities would expose people workers concern will require plans t undersigned questions you contac sincerely yours david veinot j hagen project manager vice president enclosures g projects work hai managment f docx table contents page list tables iii figures introduction background history excavation perm...

no reviews yet
Please Login to review.