the california state university san marcos not for use without editing project name here project no sm xxxx date division 1 table of contents 01100 summary of work 01140 work ...

icon picture PDF Filetype PDF | Posted on 13 Sep 2022 | 3 years ago
Partial capture of text on file.
          The California State University San Marcos   NOT FOR USE WITHOUT EDITING 
          Project Name here 
          Project No. SM – XXXX 
          Date 
           
          DIVISION 1 TABLE OF CONTENTS 
           
          01100  Summary of Work 
          01140 Work Restrictions 
          01151  Construction & Demolition Materials Recycling Requirements 
          01151A Contractor’s Construction Waste & Recycling Plan 
          01151B Contractors’ Reuse, Recycling & Disposal Report 
          01210 Allowance Procedures 
          01230  Alternate Bid procedures 
          01270 Unit Prices 
          01310 Coordination 
          01312 Project Meetings 
          01320  Electronic Project Management System 
          01322 Construction Progress Reports             
          01330 Submittals Procedures 
          01340 Requests for Interpretation 
          01350 Special procedures 
          01351  Hazardous Materials Procedures 
          01352 LEED Requirements 
          01355  Safety and Health Procedures 
          01400 Blasting Proceedures 
          01410 Regulatory Requirements 
          01420  Reference Standards and Abbreviations 
          01450 Quality Control 
          01455 Mock-Ups 
          01458  Inspection & Testing Services 
          01510   Temporary Utilities 
          01520 Construction Facilities 
          01524  LEED Construction Waste Management Requirements 
          01525 Construction Staging Areas 
          01540 Construction Aids 
          01541 Security 
          01550  Vehicular Access and Parking 
          01560  Temporary Barriers and Enclosures 
          01568  Tree and Plant Protection 
          01570 Temporary Controls 
          01573  Storm Water Pollution Prevention Plan  
          01580  Project Identification Signage 
          01610  Basic Product Requirements 
          01630  Product Substitution Procedures 
          01630A Equal or Substitution Request 
          01640  Owner- Furnished Products 
          01650  Product Delivery Requirements 
          01660  Product Storage and Handling Requirements 
          01720 Preparation Requirements 
          01730 Execution Requirements 
          01732  Cutting and Patching Requirements 
          01735  IAQ Management Plan 
          01740 Cleaning Requirements 
          01750  Starting and Adjusting Procedures 
          01770  Contact Closeout Procedures 
          01781  Survey and Layout Data 
          01783  Operation and Maintenance Data 
          01785  Product Warranties and Bonds 
                                  TABLE OF CONTENTS 
           TOC -1 
           
          The California State University San Marcos   NOT FOR USE WITHOUT EDITING 
          Project Name here 
          Project No. SM – XXXX 
          Date 
           
          01785A Special Warranties Form 
          01789  Project Record Documents 
          01810 Commissioning Requirements 
          01820  Demonstration and Training 
                                  TABLE OF CONTENTS 
           TOC -2 
           
                     The California State University San Marcos                                                        NOT FOR USE WITHOUT EDITING 
                     Project Name here 
                     Project No. SM – XXXX 
                     Date 
                      
                                                                              SECTION 01100 
                                                                                         
                                                                      SUMMARY OF THE WORK 
                                                                                         
                     PART 1 - GENERAL 
                      
                     1.1       RELATED DOCUMENTS 
                               A.         Construction Drawings, Technical Specifications, Addenda, and general provisions of the 
                                          Contract, including Contract General Conditions and Supplementary General Conditions and 
                                          other Division 1 Specification Sections, apply to this Section. 
                      
                     1.2       WORK INCLUDED IN THE CONTRACT 
                               A.         Project Identification: Name of Project 
                                          Project Location: - Location description 
                                
                               B.         Owner:  California State University, The Board of Trustees of the California State 
                                          University (Trustees). 
                                
                               C.         Architect:  Name and address 
                                
                               D.         Work Included in the Contract:  All construction and services required for a 
                                          [_BRIEF_PROJECT_DESCRIPTION_], California Building Code (CBC) Type [_____] 
                                          construction, of approximately [_____] sf floor area, including: 
                      
                     **************************************************************************************************** 
                     THE FOLLOWING ARE EXAMPLES ONLY.  EDIT TO SUIT PROJECT REQUIREMENTS. 
                     **************************************************************************************************** 
                                1.        Site preparation. 
                                2.        Site utilities. 
                                3.        Site paving. 
                                4.        Landscape irrigation system and landscape planting. 
                                5.        Site fencing and site appurtenances. 
                                6.        New [_FACILITY_DESCRIPTION_]. 
                                7.        Plumbing and heating, ventilating and air conditioning systems. 
                                8.        Wet-pipe fire suppression (sprinkler) system, to be provided on a design/build basis, with 
                                          deferred approval by Code authority having jurisdiction, to suit the requirements of the facility 
                                          and conforming applicable Codes, ordinances and standards of authorities having 
                                          jurisdiction. 
                                          a.        Private fire service main shall be provided as indicated on Civil Drawings. 
                                          b.        Details of connections to private fire service main shall be included according to 
                                                    approved design/build wet-pipe fire suppression system. 
                                9.        Electrical power, lighting and signal systems. 
                               10.        Coordination of work being performed by others under separate contracts with University, 
                                          described in Article below titled "CONCURRENT WORK UNDER SEPARATE 
                                          CONTRACTS." 
                               11.        Additional general information concerning the Project is provided on the Architectural 
                                          Drawings. 
                      
                     1.3       TYPE OF CONTRACT 
                               A.         Describe contract delivery method 
                      
                                                                          SUMMARY OF THE WORK 
                                                                                Section 01100-1 
                     The California State University San Marcos                                                        NOT FOR USE WITHOUT EDITING 
                     Project Name here 
                     Project No. SM – XXXX 
                     Date 
                      
                      
                     1.4       CONCURRENT WORK UNDER SEPARATE CONTRACTS 
                               A.         Work Under Separate Contracts:  University may award separate design and construction 
                                          contracts concurrent with this Contract and in the future, as determined by the University, for 
                                          work listed below and for other work as University may determine.  Such work under 
                                          separate contracts may be indicated on the Drawings and in the Specifications as "Not in 
                                          Contract", "NIC", "Future" or "Under Separate Contract". 
                                          1.        [_DESCRIPTION_]. 
                                          2.        [_DESCRIPTION_]. 
                                          3.        [_DESCRIPTION_]. 
                      
                               B.         Relationship to Work Under the Contract:  Work under the Contract shall include all 
                                          provisions necessary to make such concurrent work under separate contracts complete in 
                                          every respect and fully functional, including field finishing.  Provide necessary backing, 
                                          supports, piping, conduit, conductors and other such provisions from point of service to point 
                                          of connection, as shown on Drawings and specified herein.  See Section 01310 - Project 
                                          Management and Coordination for additional requirements. 
                                
                               C.         Documents for Work Under Separate Contracts:  University's Representative will make 
                                          available, in a timely manner, drawings and specifications of work under separate contracts 
                                          for coordination and further description of that work. 
                                          1.        If available, such information will include drawings, specifications, product data, lists 
                                                    and construction schedules for such work. 
                                          2.        Information concerning work under separate contracts or directly by University will 
                                                    be provided for convenience only and shall not to be considered Contract 
                                                    Documents. 
                      
                               D.         Permits, Notices and Fees for Work under Separate Contracts:  Notices required by and 
                                          approvals required of, authorities having jurisdiction over work under separate contracts and 
                                          related fees, will be solely the responsibility of University. 
                      
                     1.5       PROTECT THE WORK FROM VANDALISM 
                               A.         During Work Hours.  Protect the Work from theft, vandalism, and unauthorized entry. The 
                                          Contractor shall have the sole responsibility for job site security. 
                                
                               B.         During Off-Work Hours. During all hours that Work is not being prosecuted, furnish such 
                                          watchman’s services as Contractor may consider necessary to safeguard materials and 
                                          equipment in storage on the Project site, including Work in place and in process of 
                                          fabrication, against theft, acts of malicious mischief, vandalism, and other losses or 
                                          damages. 
                      
                     1.6       ALTERATIONS WORK DESCRIPTION 
                     **************************************************************************************************** 
                     INCLUDE THIS ARTICLE FOR REMODELING AND RENOVATION PROJECTS.  EDIT TO SUIT 
                     PROJECT REQUIREMENTS. 
                     **************************************************************************************************** 
                               A.         Alterations Work Description:  [Remodel] [Renovate] the following areas, complete including 
                                          operational mechanical and electrical Work: 
                                          1.        [_DESCRIPTION_]. 
                                          2.        [_DESCRIPTION_]. 
                                          3.        [_DESCRIPTION_]. 
                                          4.        [_DESCRIPTION_]. 
                                                                          SUMMARY OF THE WORK 
                                                                                Section 01100-2 
The words contained in this file might help you see if this file matches what you are looking for:

...The california state university san marcos not for use without editing project name here no sm xxxx date division table of contents summary work restrictions construction demolition materials recycling requirements a contractor s waste plan b contractors reuse disposal report allowance procedures alternate bid unit prices coordination meetings electronic management system progress reports submittals requests interpretation special hazardous leed safety and health blasting proceedures regulatory reference standards abbreviations quality control mock ups inspection testing services temporary utilities facilities staging areas aids security vehicular access parking barriers enclosures tree plant protection controls storm water pollution prevention identification signage basic product substitution equal or request owner furnished products delivery storage handling preparation execution cutting patching iaq cleaning starting adjusting contact closeout survey layout data operation maintenanc...

no reviews yet
Please Login to review.