jagomart
digital resources
picture1_Construction Pdf 84106 | Masterformat 2018 Web


 251x       Filetype PDF       File size 2.13 MB       Source: www.agcaustin.org


File: Construction Pdf 84106 | Masterformat 2018 Web
applications guide masterformat groups subgroups and divisions procurement and contracting facility services subgroup requirements group division 20 reserved for future expansion division 00 procurement and contracting division 21 fire suppression ...

icon picture PDF Filetype PDF | Posted on 13 Sep 2022 | 3 years ago
Partial capture of text on file.
                                                                                                                       Applications Guide 
                  MasterFormat GROUPS, SUBGROUPS, AND DIVISIONS 
                   
                  PROCUREMENT AND CONTRACTING                                    FACILITY SERVICES SUBGROUP 
                  REQUIREMENTS GROUP                                             Division 20 – Reserved for Future Expansion 
                  Division 00 – Procurement and Contracting                      Division 21 – Fire Suppression 
                                 Requirements                                    Division 22 – Plumbing 
                      Introductory Information                                   Division 23 – Heating, Ventilating, and Air Conditioning 
                      Procurement Requirements                                                  (HVAC) 
                      Contracting Requirements                                   Division 24 – Reserved for Future Expansion 
                                                                                 Division 25 – Integrated Automation 
                                                                                 Division 26 – Electrical 
                  SPECIFICATIONS GROUP                                           Division 27 – Communications 
                                                                                 Division 28 – Electronic Safety and Security 
                  GENERAL REQUIREMENTS SUBGROUP                                  Division 29 – Reserved for Future Expansion 
                  Division 01 – General Requirements                             SITE AND INFRASTRUCTURE SUBGROUP 
                                                                                 Division 30 – Reserved for Future Expansion 
                  FACILITY CONSTRUCTION SUBGROUP                                 Division 31 – Earthwork 
                  Division 02 – Existing Conditions                              Division 32 – Exterior Improvements 
                  Division 03 – Concrete                                         Division 33 – Utilities 
                  Division 04 – Masonry                                          Division 34 – Transportation 
                  Division 05 – Metals                                           Division 35 – Waterway and Marine Construction 
                  Division 06 – Wood, Plastics, and Composites                   Division 36 – Reserved for Future Expansion 
                  Division 07 – Thermal and Moisture Protection                  Division 37 – Reserved for Future Expansion 
                  Division 08 – Openings                                         Division 38 – Reserved for Future Expansion 
                  Division 09 – Finishes                                         Division 39 – Reserved for Future Expansion 
                  Division 10 – Specialties                                      PROCESS EQUIPMENT SUBGROUP 
                  Division 11 – Equipment                                        Division 40 – Process Interconnections  
                  Division 12 – Furnishings                                      Division 41 – Material Processing and Handling 
                  Division 13 – Special Construction                                            Equipment 
                  Division 14 – Conveying Equipment                              Division 42 – Process Heating, Cooling, and Drying 
                  Division 15 – Reserved for Future Expansion                                   Equipment 
                  Division 16 – Reserved for Future Expansion                    Division 43 – Process Gas and Liquid Handling, 
                  Division 17 – Reserved for Future Expansion                                   Purification, and Storage Equipment 
                  Division 18 – Reserved for Future Expansion 
                  Division 19 – Reserved for Future Expansion                    Division 44 – Pollution and Waste Control Equipment 
                                                                                 Division 45 – Industry-Specific Manufacturing 
                                                                                                Equipment 
                                                                                 Division 46 – Water and Wastewater Equipment 
                                                                                 Division 47 – Reserved for Future Expansion 
                                                                                 Division 48 – Electrical Power Generation 
                                                                                 Division 49 – Reserved for Future Expansion 
                                              
                                                                          19                            Introduction and Applications Guide 
                                                                        DIVISION 01 
           NUMBER TITLE EXPLANATION                                       
           DIVISION 01 – GENERAL 
                                   REQUIREMENTS 
           01 00 00        General                     May be used as Division level 
                           Requirements                Section title. 
            
           01 10 00  Summary 
            
           01 11 00    Summary of Work 
                                   Includes: description of construction delivered under a single 
                                   contract. Description of provisions for future construction. 
                                    
                                   May Include: list of products ordered in advance, owner-
                                   furnished products, salvaged material and equipment, products 
                                   delivered to owner, and owner-installed products. 
                                    
                                   Alternate Terms/Abbreviations: purchase contract: procurement 
                                   contract: purchase order. 
                                    
                                   See: 00 24 00 for procurement scopes. 
                                   00 54 13 for agreement form supplementary scope statement. 
                                   01 31 00 for coordination of work under a single contract. 
                                   01 64 00 for owner-supplied products. 
            
           01 11 13    Work Covered by Contract Documents 
           01 11 16    Work by Owner 
           01 11 19    Purchase Contracts 
            
           01 12 00    Multiple Contract Summary 
                                   Includes: description of construction delivered under more than 
                                   one construction contract; for example, multiple prime, 
                                   construction management, and design-build. Summary of 
                                   contracts, related prior construction, related concurrent 
                                   construction, contract interface, phasing of construction, and 
                                   temporary facilities and controls responsibility. 
                                    
                                   May Include: list of products ordered in advance, owner-
                                   furnished products, salvaged material and equipment, products 
                                   delivered to owner, and owner-installed products, future 
                                   construction, and provisions for future construction associated 
                                   with each contract. 
                                    
                                   See: 00 24 00 for procurement scopes. 
                                   00 54 13 for agreement form supplementary scope statement. 
                                   01 31 16 for multiple contract coordination. 
                                          61          Master List of Numbers, Titles, and Explanations 
                DIVISION 01 
                NUMBER TITLE EXPLANATION                                                                                                        
                01 12 13                  Summary of Contracts 
                01 12 16                  Work Sequence 
                01 12 19                  Contract Interface 
                 
                01 14 00                  Work Restrictions 
                                                                  Includes: restrictions that affect construction operations. 
                                                                  Location of construction, occupancy requirements, and use of 
                                                                  premises and site.
                                                                                            
                                                                   
                                                                  See: 01 53 00 for temporary construction related to access and 
                                                                  use of site. 
                                                                  01 55 00 for temporary vehicular access and parking. 
                                                                  01 56 00 for temporary barriers and enclosures. 
                 
                01 14 13                  Access to Site 
                01 14 16                  Coordination with Occupants 
                01 14 19                  Use of Site 
                01 14 33                  Work in Rights-of-Way 
                 
                01 18 00                  Project Utility Sources 
                                                                  Includes: information concerning utility companies providing 
                                                                  permanent services to the project. 
                                                                   
                                                                  See: 01 51 00 for temporary utilities. 
                 
                01 18 13                  Utility Service Connections 
                                                                  Notes: this is the location to specify information necessary for 
                                                                  connecting utilities and where connection is made by utility. 
                 
                01 20 00  Price and Payment Procedures 
                 
                01 21 00                  Allowances 
                                                                  Includes: administrative and procedural requirements for cash 
                                                                  and quantity allowances for products, installation, testing, and 
                                                                  contingencies. Time allowances. In a project manual 
                                                                  application, other titles affected by allowances should reference 
                                                                  this title.
                                                                              
                                                                   
                                                                  May Include: allowance amounts and descriptions. 
                                                                   
                                                                  See: 00 70 00 for conditions of the contract for allowance 
                                                                  requirements. 
                                                                   
                                                                  See Also: 00 24 00 for procurement scopes for allowance 
                                                                  amounts and items. 
                                                                  00 40 00 for allowances included in procurement forms. 
                                                                  00 43 21 for allowances procurement form supplement. 
                                                                  00 54 21 for allowances schedule agreement form supplement. 
                Master List of Numbers, Titles, and Explanations              62 
                                                                                                     DIVISION 01 
               NUMBER TITLE EXPLANATION                                                                 
               01 21 13          Cash Allowances 
               01 21 16          Contingency Allowances 
               01 21 19          Testing and Inspecting Allowances 
               01 21 23          Installation Allowances 
               01 21 26          Product Allowances 
               01 21 29          Quantity Allowances 
               01 21 43          Time Allowances 
                
               01 22 00          Unit Prices 
                                                 Includes: administrative and procedural requirements for unit 
                                                 prices and measurement and payment. 
                                                  
                                                 May Include: list and description of unit price items. 
                                                  
                                                 See Also: 00 24 00 for procurement scopes for unit price 
                                                 descriptions. 
                                                 00 40 00 for unit prices included in procurement forms. 
                                                 00 43 22 for unit price procurement form supplement. 
                                                 00 54 22 for unit prices schedule agreement form supplement. 
                
               01 22 13          Unit Price Measurement 
               01 22 16          Unit Price Payment 
                
               01 23 00          Alternates 
                                                 Includes: administrative and procedural requirements for 
                                                 alternate bids or proposals. Includes submission and 
                                                 acceptance procedures. 
                                                  
                                                 May Include: list and description of each alternate. 
                                                  
                                                 Alternate Terms/Abbreviations: alternates: alternatives: bid 
                                                 items. 
                                                  
                                                 See Also: 00 24 00 for procurement scopes for alternate 
                                                 descriptions. 
                                                 00 40 00 for alternates included in procurement forms. 
                                                 00 43 23 for alternates procurement form supplement. 
                
               01 24 00          Value Analysis 
                                                 Includes: administrative and procedural requirements for value 
                                                 analysis, application for consideration, and consideration of 
                                                 proposals.
                                                            
                                                 May Include: appropriate forms. 
                                                 Alternate Terms/Abbreviations: value analysis: value 
                                                 management: value improvement. 
                                                 See: 00 63 00 for modification forms. 
                                                 01 26 00 for contract modification procedures. 
                                                          63                Master List of Numbers, Titles, and Explanations 
The words contained in this file might help you see if this file matches what you are looking for:

...Applications guide masterformat groups subgroups and divisions procurement contracting facility services subgroup requirements group division reserved for future expansion fire suppression plumbing introductory information heating ventilating air conditioning hvac integrated automation electrical specifications communications electronic safety security general site infrastructure construction earthwork existing conditions exterior improvements concrete utilities masonry transportation metals waterway marine wood plastics composites thermal moisture protection openings finishes specialties process equipment interconnections furnishings material processing handling special conveying cooling drying gas liquid purification storage pollution waste control industry specific manufacturing water wastewater power generation introduction number title explanation may be used as level section summary of work includes description delivered under a single contract provisions include list products or...

no reviews yet
Please Login to review.