GUIDELINES FOR THE CONSTRUCTION
OF EARTH-FILL DAMS
Water Resources Policy
Policy #2008/1
November 2008
Department of Primary Industries and Water
© State of Tasmania 2008
Water Resources Division
Department of Primary Industries and Water
GPO Box 44
Hobart TAS 7001
Phone: (03) 6233 6753, Fax (03) 6233 6055
Email: water@dpiw.tas.gov.au
Home Page: http://www.dpiw.tas.gov.au/water
ISBN 978-0-7246-6467-2
The Water Management Act 1999 (‘the Act’) provides for the sustainable
management and allocation of Tasmania’s water resources. Amongst other
things the Act provides for the promotion and fostering of social and economic
benefits from the development of the State’s water resources.
With the commencement of the Act in 2000, a new process for assessing dam
permit applications was established. Under the Act, a dam permit is generally
required for all dams except in circumstances such as:
• a dam that is not on a watercourse and that holds less than one
megalitre of water; or
• a dam constructed for the primary purpose of storing waste as defined
in the Act.
In addition to a barrier across a watercourse, a "dam" includes an excavation
in a watercourse and a flood levee, both of which also require a permit under
the Act.
Under the Act, a statutory committee, the Assessment Committee for Dam
Construction (the Assessment Committee), was established as the body
responsible for assessing applications for the construction of dams. The
Assessment Committee members have expertise in the management of water
resources; the use and economic development of water resources;
engineering and safety matters relating to dams; integrated natural resource
management; and best practice environmental management.
The Guidelines for the Construction of Earth-Fill Dams detail the specifications
for the construction of earth-fill dams, and outline the precautions and
methods which should be employed in order to obtain the soundest possible
structure. These guidelines will provide an overview for dam permit holders
and existing dam owners of the major matters to be considered in the
construction of such dams.
Dr Alan Harradine
General Manager (Water Resources)
Department of Primary Industries and Water
TABLE OF CONTENTS
1. INTRODUCTION ...................................................................... 1
1.1 Purpose of the Guidelines ................................................................... 1
1.2 Classification of earth-fill dams ........................................................... 1
2. PLANNING AND MANAGEMENT SPECIFICATIONS ............ 3
2.1 Introduction ......................................................................................... 3
2.2 Risk downstream of a dam ................................................................. 4
2.3 Contract .............................................................................................. 5
2.4 Easements & boundaries .................................................................... 5
2.5 Site investigations ............................................................................... 5
2.6 Filling of the dam ................................................................................ 6
2.7 Dam permit conditions ........................................................................ 6
3. ENGINEERING AND CONSTRUCTION SPECIFICATIONS .. 7
3.1 Engineering ......................................................................................... 7
3.2 Clearing .............................................................................................. 8
3.3 Foundation* ........................................................................................ 8
3.4 Cut-off trench* or keyway .................................................................... 8
3.5 When to use filters .............................................................................. 8
3.6 Rock .................................................................................................... 9
3.7 Outlet pipe .......................................................................................... 9
3.8 Outlet pipe materials and installation ................................................ 10
3.9 Baffle plates on outlet pipes .............................................................. 10
3.10 Borrow pits ..................................................................................... 11
3.11 Embankment compaction .............................................................. 11
3.12 Compaction testing requirements .................................................. 12
3.13 Batter slope* .................................................................................. 13
3.14 Settlement of the embankment ...................................................... 13
3.15 Vegetation ..................................................................................... 13
3.16 Spillway* or stream return.............................................................. 14
3.17 Freeboard*..................................................................................... 14
3.18 Protection from wave action .......................................................... 15
3.19 Sedimentation ................................................................................ 15
3.20 Maintenance and inspections ........................................................ 15
3.21 Your engineer ................................................................................ 16
4. ACRONYMS AND DEFINITIONS .......................................... 18
4.1 Acronyms .......................................................................................... 18
4.2 Definitions ......................................................................................... 18
5. BIBLIOGRAPHY .................................................................... 19