274x Filetype XLSX File size 0.19 MB Source: www.nhvr.gov.au
Sheet 1: Home
Self-Assessment Requirements Checklist The following checklist has been developed as a self-assessment measure for technology providers and developers of candidate Electronic Work Diaries (EWDs) to ensure compliance with the EWD Standards. The checklist specifies requirements as stated in the NHVR EWD Standards Version 1.0 - May 2018 (inclusive of the EWD Standards - Schedule A), in accordance with the Heavy Vehicle National Law Act 2012. Note: Compliance with all requirements outlined in this checklist does not automatically guarantee approval. Only EWDs approved by the NHVR shall be accepted as an alternative work diary format to Written Work Diaries (WWD). |
||||||
Checklist Guidelines 1. Throughout the checklist 'the Standards' refers to the current published verion of the EWD Standards (inclusive of Schedule A). 2. 'Requirement ID' is only used within this checklist for ease of reference. 3. 'Requirement Division' corresponds to relevant requirement division within the EWD Standards. 4. 'Requirement Section' corresponds to the relevant requirement section within the EWD Standards. 5. 'Test Result' refers to the outcome of tests performed to verify system’s compliance with each requirement. 6. Once tests have been completed, the outcomes must be recorded as 'Yes', 'No' or 'Partial' in the 'Test Results' column. 7. Each test must have an explanation in the 'Objective evidence/Comments' section. 8. 'Test Date' refers to the date when tests were completed and must be recorded in the following format - DD/MM/YYYY. 9. A valid test date must be recorded against each requirement with a test result. 10. 'Objective evidence/Comments' are to be used to explain how the candidate system does or does not comply with a particular requirement. 11. On some worksheets, Requirement Sections may be collapsed to help with usability, check each sheet for a + on the far left side to expand sections and ensure all requirements are displayed. |
EWD Applicant Details |
|||
Company Details | This section to be completed | ||
Organisation Name | |||
Trading as Name | |||
Organisation Type | |||
Australian Company Number | |||
Address Details | Physical | Postal | |
Address Line 1 | |||
Address Line 2 | |||
Suburb | |||
State | |||
Country | |||
EWD System Details | This section to be completed | ||
Device Name (if applicable) | |||
System Name | |||
System Version Number | |||
Assessment Details | This section to be completed | ||
Assessment Start Date and Time | |||
Assessment End Date and Time | |||
Assessor Name | |||
Assessor Company (if external to applicant) | |||
Assessor Contact Phone | |||
Assessor Email Address | |||
Assessment Summary | x Please do not update this section manually x | ||
Yes | No | Partial | |
1. General | Not applicable | Not applicable | Not applicable |
2. Design and Operations | 0 | 0 | 0 |
3. Technology Provider | 0 | 0 | 0 |
4. Enforcement Requirements | 0 | 0 | 0 |
5. Data Interoperability | 0 | 0 | 0 |
6. Data Specification | 0 | 0 | 0 |
7. Work and Rest Options | 0 | 0 | 0 |
8. Approvals | 0 | 0 | 0 |
9. Definitions | Not applicable | Not applicable | Not applicable |
Part 1 | General | ||||||
Requirement Division | Requirement Section | Req ID | Requirement Description | No comment required from applicants | |||
1. Scope | 1.1 | The Electronic Work Diary (EWD) Policy Framework establishes the National Heavy Vehicle Regulator’s (the NHVR’s) approach to administering the EWD provisions in the Heavy Vehicle National Law (the HVNL). The framework consists of the following documents which are designed to be read in conjunction with each other: (a) The EWD Policy Framework (b) The EWD Privacy Policy (c) The EWD Compliance Policy (d) The EWD Standards (e) The EWD Standards – Schedule A |
|||||
1.2 | The EWD Standards (this document an inclusive of EWD Standards – Schedule A) specifies the requirements for EWDs for use as a tool for the safe management of fatigue-related heavy vehicles in accordance with the Heavy Vehicle National Law Act 2012. | ||||||
1.3 | Work diaries are a regulatory requirement introduced to combat the adverse safety impact of fatigue in the heavy vehicle industry. Only EWDs approved by the NHVR shall be accepted as an alternative work diary format to the Written Work Diary (WWD) as the primary method for keeping records. | ||||||
1.4 | The use of an EWD approved to these Standards shall not change the legal obligations of the parties in the chain of responsibility. The Heavy Vehicle National Law Act 2012 will take precedence in all matters. | ||||||
2. Application | 2.1 | An EWD is a system that meets all requirements of this Standard and has been accepted by the NHVR. The use of non-approved electronic recording devices must be accompanied by a WWD meeting obligations in accordance with the Heavy Vehicle National Law Act 2012. | |||||
3. Reference documents | 3.1 | The NHVR acknowledges that the development of the EWD Standard was influenced by the Austroads Research Report: Performance-based Specification for Electronic Work Diary and Heavy Speed Monitoring (AP-R386/11, July 2011), specifically Appendix A – Specified EWD. Parts were adapted for use throughout the EWD standards. | |||||
3.2 | Heavy Vehicle National Law Act 2012 | ||||||
3.3 | Heavy Vehicle Fatigue Management National Regulation (HV(FM)NR) | ||||||
3.4 | NHVR Setting the Agenda: 2016 – 2022 | ||||||
3.5 | The EWD Policy Framework | ||||||
3.6 | The EWD Privacy Policy | ||||||
3.7 | The EWD Compliance Policy | ||||||
3.8 | The EWD Standards – Schedule A | ||||||
The following references or the most recent iteration: | |||||||
3.9 | The Australian Road Rules | ||||||
3.11 | Standards Australia 2007, Data elements and interchange formats -Information interchange -Representation of dates and times, AS ISO 8601 | ||||||
3.12 | Standards Australia 2017, Document Management – Portable Document Format, AS ISO 32000.1:2017 | ||||||
3.13 | Standards Australia 2016, Quality Management Systems – Requirements, AS/NZS ISO 9001 | ||||||
3.14 | Standards Australia 2006, Security Techniques – Information Security Management Systems – Requirements, AS/NZS ISO 27001 | ||||||
3.15 | Standards Australia 2000, Electromagnetic compatibility (EMC) General - Application and interpretation of fundamental definitions and terms, AS/NZS 61000.1.12000 (R2016) | ||||||
3.16 | International Electrotechnical Commission, Electromagnetic compatibility (EMC) – Part 1: General – Section 1: Application and interpretation of fundamental definitions and terms, IEC/TR EN 61000-1-1 | ||||||
3.17 | International Organization for Standardization 2015, Information Technology – Document Container File, ISO/IEC 21320-1:2015 | ||||||
3.18 | Rivest, R., The MD5 Message-Digest Algorithm, RFC 1321, DOI 10.17487/RFC1321, April 1992, <https://www.rfc-editor.org/info/rfc1321> |
no reviews yet
Please Login to review.