jagomart
digital resources
picture1_Case Study Presentation Pdf 81014 | 19 Project Feasibility


 190x       Filetype PPTX       File size 0.34 MB       Source: www.afpc.tamu.edu


File: Case Study Presentation Pdf 81014 | 19 Project Feasibility
project feasibility analysis for me it all started with a term paper ice plant article by richardson and mapp southern journal of agricultural economics sjae 1976 used risk for feasibility ...

icon picture PPTX Filetype Power Point PPTX | Posted on 08 Sep 2022 | 3 years ago
Partial capture of text on file.
      Project Feasibility Analysis
  • For me it all started with a term paper
   –Ice Plant article by Richardson and Mapp, 
    Southern Journal of Agricultural Economics 
    (SJAE) 1976 – used risk for feasibility 
    analysis
   –The article demonstrated the methodology 
    for risk based feasibility studies, and it was 
    first to report
     • Probability of Economic Success
     • Probabilistic Cash Flows to meet cash needs
  • Financial/Economic analyses have been 
   used hundreds of times for a wide 
   variety of firm based problems
    Project Feasibility Analysis
   • In business most feasibility studies use 
     Excel spreadsheet models
     – This trend by business started in mid-90s 
     – Excel is the language of business analysis
   • Feasibility studies generally ignore risk – 
     many do a “What if …” study for the Best 
     Case and Worst Case scenarios
   • Some analysts think they considered risk 
     by including a 10 year “average” price
   • Excel deterministic feasibility models are 
     easily converted to stochastic feasibility 
     models
     – Just make the forecasted variables stochastic 
      using the residuals from the forecast models
    Project Feasibility Analysis
   • Risks to consider for a feasibility 
     analysis are:
     – Price of raw inputs, as fuel and labor  
     – Price of the product or output
     – Production risk
     – Black Swan events
     – Competition and market share over the life 
      of investment (business)
     – Cost of the plant and product development
     – Cost of production for the finished product
   • Project feasibility is where we put it all 
     together in an analysis of Time, Money, 
     and Economic Viability
       Project Feasibility Analysis
       • Project Feasibility: consider the Time, Money 
         (Cost), and Economic Viability of the finished 
         business
       • Simulate the Time to complete or build the 
         plant
       • Simulate the Cost of developing the plant 
         incorporating risk into the plant’s development 
         costs                              PP((T)T)
                            PPrroojejecct t 
       •                     MMaannaaggeemmeenntt
         Simulate the Economic Viability of the 
         completed plant (business)                   TTiimmee
                                            PP((CC))
                             Bid
                             AAnnaallysisysis
                                                    CCoosstt  ((mmoonneey)y)
                                            P( )
                                            P( )
                              PPrroojejectct
                              FFeeaasibsibiilitylity
                                                    RRaattee  ooff  RReettuurrnn
          Project Feasibility Analysis
         •   Proposed business with a new product
         •   Tasks and duration/costs
         Tasks         Description               Time (mo.) Costs ($1,000)
             1         Plant Modification3-5                    300-325
             2         Product Development                 1-3            200-300
             3         Distribution System 2-3                  50-100
             4         Marketing Program              3-4       100-150
         •   Finance 100% of project costs @ 9%
         •   Marginal cost of production/unit Uniform(10,15), a scenario 
             variable
         •   Fixed Costs/year  $200,000
         •   Inflation      Uniform(0.04, 0.05) percent per year
         •   Demand Projections
         Years         Price/Unit           Quantity Sold/Year
         1-3           U(13.5,14)           U(500K, 600K)
         4-5           U(13,13.5)           U(400K, 500K)
         6-10          U(12.5,13)           U(300K, 400K)
The words contained in this file might help you see if this file matches what you are looking for:

...Project feasibility analysis for me it all started with a term paper ice plant article by richardson and mapp southern journal of agricultural economics sjae used risk the demonstrated methodology based studies was first to report probability economic success probabilistic cash flows meet needs financial analyses have been hundreds times wide variety firm problems in business most use excel spreadsheet models this trend mid s is language generally ignore many do what if study best case worst scenarios some analysts think they considered including year average price deterministic are easily converted stochastic just make forecasted variables using residuals from forecast risks consider raw inputs as fuel labor product or output production black swan events competition market share over life investment cost development finished where we put together an time money viability simulate complete build developing incorporating into costs pp t pprroojejecct mmaannaaggeemmeenntt completed ttiimm...

no reviews yet
Please Login to review.