210x Filetype PPTX File size 0.73 MB Source: sig-uk.org
What is APQP & PPAP? AS9145 Inputs Processes Outputs Program Advanced Productio Needs Product n Quality Part Planning Approval APQP Process PPAP • Structured methodology with defined outputs to ensure new products satisfy customer needs and wants • Uses project management to drive delivery and quality performance to targets • Proactive and preventative approach through cross functional collaboration. Why Use APQP? Discuss the benefits of using APQP Safety: Proactively seeks to identify and mitigate risks to product and process safety Quality: Concerned with building quality into product and process designs; Provides a toolset and culture to achieve Zero Defects Delivery: Drives on-time delivery of initial parts and ensures ongoing rate capability Cost: Avoids the high costs associated with problems occurring during initial volume production People: Uses a cross-functional team to capitalise on available skills, knowledge & experience Discuss the reasons for applying APQP in your own areas AS9145: The Standard AEROSPACE AS9145 STANDARD Issued 2016-11 Technically equivalent writings published in IAQG sectors. Aerospace Series – Requirements for Advanced Product Quality Planning and Production Part Approval Process RATIONALE This standard was created to define the aviation, space and defence process requirements for Advanced Product Quality Planning (APQP) and Productions Part Approval Process (PPAP). The APQP aspects of this standard define a methodology for ensuring that the product development processes deployed throughout the aviation, space and defence industries are fully integrated phased processes that extend from concept and deign through manufacturing process planning and execution and on into product use, service and customer feedback. The PPAP is an output of APQP confirming that the production process had demonstrated the potential to produce products that consistently fulfil all requirements at the customer demand rate. The IAQG created a multi-member group to author AS9145. The standard is issued under the authority of SAE international, as per all AS standards. Associated Standards The processes and supporting activities for achieving APQP and PPAP should be embedded in the organisation’s quality management system to ensure: • The process is documented & controlled • Documents are treated as quality records • The process is subject to audits • AS13003 Measurement Systems Analysis (MSA) • AS13004 Process Failure Mode & Effects Analysis (PFMEA) and Control • AS9100 Plans • AS9102 Requirements for Aviation, Space & Defence Organisations • AS9103 Aerospace First Article Inspection Requirement • AS9110 Variation Management of Key Characteristics Requirements for Maintenance Organisations. APQP Phases Preliminar Critical y Design Design Review Review Initial Kick off End of Design Production Production Concept Release (CDP) Approval Launch (PDR) Product Development Process (PDP) 1. Planning 5. On-going Production, Use Phases of Advanced and Post-delivery Service Product Quality 2. Product Design and Development 4. Product & Planning (APQP) Process Validation 3. Process Design and Development Key Production Part Production FAIR PPAP Approval Process Readiness Approval Review Production (PPAP) Events Process Run Product Status Prototype / test Production trial Production products product products Discuss: how does your gated NPI process fit around this?
no reviews yet
Please Login to review.