187x Filetype PPTX File size 1.13 MB Source: ec.europa.eu
GPP Training Toolkit Module 1: Module 4: Needs Introduction Assessment Module 2: Strategic Module 5: Circular Aspects of GPP Procurement Module 3: Legal Module 6: Market Aspects of GPP Engagement Module 7: Operational (Office Buildings) Module 7.5 –Office Building Design, Construction and Management 2 Environmental impacts Key choices about building design to reduce impacts Construction: • Construction products (recycled materials such as aggregates from construction and demolition waste) • Transportation of aggregates to Construction and use of production sites by rail or buildings in the EU: • Uses approx. half of all shipping materials extracted • Environmental management of • Consumes 40% of energy construction and demolition • Consumes 1/3 of water • Generates 1/3 of all waste waste Module 7.5 –Office Building Design, Construction and Management 3 Environmental impacts Key choices about building design to reduce impacts (cont.) Use: • Energy performance during occupation (lighting, heating, cooling and ventilation) • Lifespan of the building and its elements (service life): - adaptation of building and its structure at the end of service life - healthy and attractive working environment (good indoor air quality , natural light, etc.) Module 7.5 –Office Building Design, Construction and Management 4 Environmental impacts Key choices about building design to reduce impacts (cont.) Use (cont.): • Nature-based solutions (green roofs and walls, habitats in courtyards and patios, sustainable urban drainage systems, street trees) Module 7.5 –Office Building Design, Construction and Management 5 Scope What is included in the EU GPP Criteria • Renovation of existing buildings and construction of new office buildings: design, site preparation, construction, servicing and ongoing management Module 7.5 –Office Building Design, Construction and Management 6
no reviews yet
Please Login to review.