jagomart
digital resources
picture1_Transport And Communication Pdf 43471 | Ch 11 (english 2017) Final


 160x       Filetype PDF       File size 0.98 MB       Source: mof.portal.gov.bd


File: Transport And Communication Pdf 43471 | Ch 11 (english 2017) Final
bangladesh economic review 2017 chapter 11 transport and communication transport and communication system as an essential physical infrastructure plays an important role in socio economic development of the country it ...

icon picture PDF Filetype PDF | Posted on 16 Aug 2022 | 3 years ago
Partial capture of text on file.
                                Bangladesh Economic Review 2017 
                                                                                                                               CHAPTER 11 
                                                                                      TRANSPORT AND COMMUNICATION 
                                                                                                                                                     
                                              Transport  and  communication  system  as  an  essential  physical  infrastructure  plays  an 
                                              important role in socio-economic development of the country. It is very much necessary to 
                                              make  a  developed  and  efficient  transport  and  communication  system  compatible  with 
                                              international,  national  and  regional  road  network.  Considered  this  view,  Padma  Bridge, 
                                              Metro-rail,  Dhaka  Elevated  Express  way  and  some  other  mega-projects  are  being 
                                              implemented.  To  operate  Railway  as  an  environment-friendly,  safe,  affordable  and 
                                              dependable means of transport and to gain commercial and financial success, professional 
                                              knowledge based organisational reforms and sector improvement are being implemented. 
                                              Several  measures  have  already  been  undertaken  for  dredging  of  dying  river  ways, 
                                              development  and  maintenance  of  navigability  of  different  river  routes,  ensuring  safe 
                                              movement of water crafts, development of inland river ports, creating infrastructure facilities 
                                              to carry container goods in inland waterways etc. With limited resources Biman Bangladesh 
                                              Airlines  Limited  is  conducting  international  and  national  flights  in  different  routes.  To 
                                              modernise, develop and expand the country's telecommunications system, various measures 
                                              have been undertaken by the government. Keeping consistency with the targets of Vision-
                                              2021, SDG and Seventh Five Year Plan, the Government has undertaken various initiatives to 
                                              expand  information  technology.  Various  development  projects  and  programmes  are  in 
                                              progress to ensure the use and application of information and communication technology by 
                                              increasing  digital  literacy  at  all  walks  of  life,  extend  public  service  through  IT-based 
                                              activities and, finally, build a modern and developed Bangladesh through the introduction of 
                                              e-governance and e-commerce. 
                                Transport  and  communication  system  is  a                                                                               21,302.08  km,  of  which  18,202.06  km  is 
                                vital  physical  infrastructure  for  the  socio                                                                           paved, under the management of Roads and 
                                economic                      development                           of          a         country.                         Highways Department. Out of the total road 
                                According to the final estimate of Bangladesh                                                                              network under this Department, 3812.78 km 
                                Bureau of Statistics (BBS) the contribution of                                                                             is National Highway (17.90%), 4,246.97 km 
                                the  transport  and  communication  sector  to                                                                             Regional  Highway  (19.94%)  and  remaining 
                                GDP  was  11.26  percent  and  the  rate  of                                                                               13,242.30  km  is  Zila  roads  (62.16%). 
                                growth was 6.76 percent during FY2016-17.                                                                                  Besides, RHD has 4,507 bridges and 13,751 
                                In  context  of  globalisation  and  the  market                                                                           culverts  under  its  control.  Moreover,  RHD 
                                economy  involvement  with  regional  and                                                                                  has currently been operating about 124 ferry 
                                international                               transport                           international                              boats in 41 ferry Ghats on its road network 
                                networking is crucial for Bangladesh.                                                                                      throughout the country. It may be mentioned 
                                                                                                                                                           here  that  the  length  of  road  network  under 
                                Roads Communication                                                                                                        RHD did not increase during last couple of 
                                Roads and Highways Department (RHD)                                                                                        years. But the quality of different important 
                                The  total  length  of  road  in  the  country  is                                                                         road              segments                     has            been              significantly 
                                                                                                                                                             Chapter 11- Transport and Communication | 151  
                                                                                                                                                                                                                                                           159 
                                                                                                                                                      
                                                                    Bangladesh Economic Review 2017 
                                                                    improved through carrying out development/                                                                                                                                                                                                                            a  ten  year  time  series  data  on  RHD  road 
                                                                    improvement works of various standards as                                                                                                                                                                                                                             lengths since 2008. 
                                                                    per requirement. The following table provides 
                                                                     
                                                                                                  Table 11.1: Various Categories of Roads under Roads and Highways Department 
                                                                                                                                                                                                                                                                                                                                                                                                       (Kilometer) 
                                                                                        Year                                             National Highway                                                                                                            Regional Highway                                                                                                                            Zilla Road                                                                                             Total 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       
                                                                                        2008                                                                                 3570                                                                                                                         4323                                                                                                               13678                                                                                     21571 
                                                                                        2009                                                                                 3477                                                                                                                         4165                                                                                                               13248                                                                                     20890 
                                                                                        2010                                                                                 3478                                                                                                                         4222                                                                                                               13248                                                                                     20948 
                                                                                        2011                                                                                 3492                                                                                                                         4268                                                                                                               13280                                                                                     21040 
                                                                                        2012                                                                                 3538                                                                                                                         4276                                                                                                               13458                                                                                     21272 
                                                                                        2013                                                                                 3570                                                                                                                         4323                                                                                                               13678                                                                                     21571 
                                                                                        2014                                                                                 3544                                                                                                                         4278                                                                                                               13659                                                                                     21481 
                                                                                        2015                                                                                 3813                                                                                                                         4247                                                                                                               13242                                                                                     21302 
                                                                                        2016                                                                                 3813                                                                                                                         4247                                                                                                               13242                                                                                     21302 
                                                                                        2017                                                                                 3813                                                                                                                         4247                                                                                                               13242                                                                                     21302 
                                                                       Source: Roads and Highways Department; Ministry of Road, Transport and Bridges. 
                                                                    Moreover,                                                          the                          Government  has  taken                                                                                                                                                 Construction of Dhaka Circular Road with 
                                                                    necessary initiatives to implement 6 road and                                                                                                                                                                                                                                  provision  of  service  lanes:  2nd  phase 
                                                                    bridge projects by public private partnership                                                                                                                                                                                                                                  Improve to 4 Lane Highway (Abdullahpur- 
                                                                    arrangement.  The  procedure  of  selecting                                                                                                                                                                                                                                    Dhour-                                               Birulia-                                                Gabtoli-                                                  Babubazar 
                                                                    investors  is  underway  of  the  following                                                                                                                                                                                                                                    Fatullah-                                                    Chashara  -  Signboard,  67 
                                                                    projects:                                                                                                                                                                                                                                                                      kilometer).  
                                                                                                                                                                                                                                                                                                                                                    
                                                                     Construction                                                                              of                           Dhaka-                                                 Chittagong                                                                            The draft of ‘Road Transport Act, 2017’ has 
                                                                             Expressway                                                                                                                                                                                                                                                   been  approved  on  27  March  2017  by  the 
                                                                      Upgrading                                                                          of                             Madanpur-                                                                    Bhulta-                                                             Cabinet  in  order  to  replace  the  ‘Motor 
                                                                             Debogram-  Joydevpur  to  4  Lane  (Dhaka                                                                                                                                                                                                                    Vehicle Ordinance 1983’ with a modern and 
                                                                             Bypass)                                                                                                                                                                                                                                                      up-to-date one. Meanwhile, the ‘Road Fund 
                                                                      Hatirjheel-Rampura-Banosree  Ideal  School                                                                                                                                                                                                                         Board Act, 2013’ has been approved by the 
                                                                             and  Collage  Shieker  Jayga-Amulia-Demra                                                                                                                                                                                                                    Government to ensure proper and continuous 
                                                                             Highway  (Chittagong  Road  Mour  and                                                                                                                                                                                                                        supply  of  fund  for  road  repairing  and 
                                                                             Tarabo Link Road).                                                                                                                                                                                                                                           maintenance. The ‘Bus Rapid Transit Law’ is 
                                                                                                                                                                                                                                                                                                                                          also underway.  
                                                                    Other projects under RHD are:                                                                                                                                                                                                                                          
                                                                     Improvement                                                                                        of                                Gabtoli-Nabinagar                                                                                                              A flawless road design is being implemented 
                                                                             Highway to Expressway with provision of                                                                                                                                                                                                                      through identifying the accident black  spots 
                                                                             service lanes                                                                                                                                                                                                                                                on the National Highways. The intensity of 
                                                                                                                                                                                                                                                                                                                                          road accident has been reduced due to proper 
                                                                                                                                                                                                                                                                                                                                            Chapter 11- Transport and Communication | 152  
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   160 
                                                                                                                                                                                                                                                                                                                             
                                                                    Bangladesh Economic Review 2017 
                                                                    maintenance of road and straightening of road                                                                                                                                                                                                                         projects/programmers for the development of 
                                                                    alignment. The ‘Improvement of Black Spots                                                                                                                                                                                                                            rural and urban infrastructures of the country. 
                                                                    in  National  Highways’  for  the  treatment  of                                                                                                                                                                                                                      Since its inception up to FY2016-17, LGED  
                                                                    121  black  spots  at  an  estimated  cost  of                                                                                                                                                                                                                        so far developed 1,07,910 km upazila, union 
                                                                    Tk.168.05  crore  has  been  completed  during                                                                                                                                                                                                                        and rural roads, constructed 1,335,174 meters 
                                                                    FY2016-17.  Besides,  a  vast  programme  for                                                                                                                                                                                                                         bridges/culverts  and  planted  trees  along 
                                                                    safety  on  road  through  overload  control  by                                                                                                                                                                                                                      24,839 km of those roads. Moreover, as many 
                                                                    means  of  installing  weigh-bridge  at  each                                                                                                                                                                                                                         as  2,041  growth  centers,  2,059  rural  bazars 
                                                                    important  traffic  origination  point,  signing                                                                                                                                                                                                                      have  been  developed  and  3,150  Union 
                                                                    and  signaling  of  roads  etc.  is  under                                                                                                                                                                                                                            Parishad  Complex  buildings  have  been 
                                                                    implementation for long time.                                                                                                                                                                                                                                         constructed during the period. 
                                                                                                                                                                                                                                                                                                                                          The following table depicts achievements in 
                                                                    Local Government Engineering                                                                                                                                                                                                                                          Transport                                                        Infrastructure                                                                      under                                        various 
                                                                    Department (LGED)                                                                                                                                                                                                                                                     development  projects  of  Local  Government 
                                                                    Local  Government  Engineering  Department                                                                                                                                                                                                                            Engineering  Department  up  to  FY2016-17 
                                                                    (LGED) has been implementing a number of                                                                                                                                                                                                                              since its inception. 
                                                                     
                                                                     
                                                                                                   Table 11.2: Achievement in Transport Infrastructure Development under LGED 
                                                                                                                                                                                                                                                                                                                            
                                                                        Component                                                                                                                                                                                                            Financial Year                                                                                                                                                                                                                                      Total 
                                                                                                                             Cumulative                                        2007-08                           2008-09                           2009-10   2010-11    2011-12                                                                           2012-13   2013-14                                                    2014-15     2015-16   2016-17                                                                          (Cumulative 
                                                                                                                               up to June                                                                                                                                                                                                                                                                                                                                                                                                        Up to 
                                                                                                                                        2007                                                                                                                                                                                                                                                                                                                                                                                            June 2017) 
                                                                                          1                                                  2                                           3                                  4                                  5                                 6                                  7                                 8                                 9                               10                                11                               12                                        13 
                                                                        Earthen                                            64691                                               -                                   -                                 -                                 -                                  -                                  -                                 -                                 -                                  -                               -                                64691 
                                                                        Road (km) 
                                                                        Paved Road                                         57908                                               3993                                3277                              4023                              4614                               4905                               6639                              6548                              5990                               4813                            5200                             107910 
                                                                        (km) 
                                                                        Bridge/                                            1038355                                             30020                               33800                             29363                             38502                              26415                              27057                             32707                             24455                              28500                           29000                            1335174 
                                                                        Cuvert  (m) 
                                                              Source: LGED.                                                                                                                                                                                                                                                                                                                                                                                                                                                                        
                                                                    Since  2009,  LGED  removed  water-logging                                                                                                                                                                                                                            infrastructures                                                                       in                      urban                                     area                               covering 
                                                                    from  6,34,901  hectors  along  with  the                                                                                                                                                                                                                             improvement  of  845  km  roads,  776  meters 
                                                                    increasing                                                         water                                      preservation                                                                 capacity,                                                                  bridges/culverts and construction of 120 km 
                                                                    irrigation  facilities  and  irrigable  areas  by                                                                                                                                                                                                                     drains. 
                                                                    implementing  436  sub  projects  under  small                                                                                                                                                                                                                         To liberate the traffic jam of Dhaka City this 
                                                                    scale                                          water                                             resources                                                             development                                                                                    organisation  takes  initiative  to  build  two 
                                                                    programmes. Besides, that 23 rubber dams on                                                                                                                                                                                                                           flyovers.  The  progress  of  8.70  km  length 
                                                                    perennial rivers were constructed. In FY2016-                                                                                                                                                                                                                         Flyover  under  Mogbazar-Mouchack Flyover 
                                                                    17, LGED has implemented 27 development                                                                                                                                                                                                                               Development Project is about 95 percent and 
                                                                    projects                                                     for                                  the                                  development                                                                           of 
                                                                                                                                                                                                                                                                                                                                            Chapter 11- Transport and Communication | 152  
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   161 
                                                                                                                                                                                                                                                                                                                             
                                                                    Bangladesh Economic Review 2017 
                                                                    620 meters Khilgoan Flyover Loop has been                                                                                                                                                                                                                             Following  measures  have  been  taken  to 
                                                                    completed in January 2016.                                                                                                                                                                                                                                            enhance                                                 standard                                                  of                        service,                                             prevent 
                                                                    Bangladesh  Road  Transport  Authority                                                                                                                                                                                                                                environment pollution and reduce traffic jam 
                                                                    (BRTA)                                                                                                                                                                                                                                                                during FY2016-17:  
                                                                                                                                                                                                                                                                                                                                                           Draft  of  National  Road  Safety  Action 
                                                                     
                                                                    Bangladesh                                                                 Road                                       Transport                                                        Authority                                                                                        Plan, 2017-2020  has been prepared 
                                                                    (BRTA) has been entrusted with the task of                                                                                                                                                                                                                                             To  reduce  road  accident  and  enhancing 
                                                                    ensuring                                                       overall                                                supervision,                                                                     proper                                                                           road  safety  consciousness,  a  total  of 
                                                                    management  and  effective  control  with  a                                                                                                                                                                                                                                            52,670  professional  drivers  have  been 
                                                                    view  to  bring  about  discipline  in  the  road                                                                                                                                                                                                                                       provided training.  
                                                                    transport  sector  since  its  inception  in  1988.                                                                                                                                                                                                                                    Legal  actions  have  been  taken  against 
                                                                    This  organisation  is  responsible  for  issuing                                                                                                                                                                                                                                       black  smoke  emitting  defective  vehicles 
                                                                    registration and fitness certificates of vehicles                                                                                                                                                                                                                                       through mobile courts to control vehicular 
                                                                    as                     well  as  executing  other  regulatory                                                                                                                                                                                                                           pollution 
                                                                    activities  as  per  Motor  Vehicles  Ordinance                                                                                                                                                                                                                                        Up to June 2017 a total of 4,28,308 sets 
                                                                    1983.  In  FY2015-16,  BRTA  collected                                                                                                                                                                                                                                                  Retro Reflective Number Plates and radio 
                                                                    revenues Tk.1,619 crore against the target of                                                                                                                                                                                                                                           Frequency  Identification  (RFID)  tags 
                                                                    Tk.1,354 crore, that is 119.57 percent of the                                                                                                                                                                                                                                           have been produced and 3,97,055 sets of 
                                                                    target.                                      In                      FY2016-17,  BRTA  released                                                                                                                                                                                         the  same  have  been  affixed  to  various 
                                                                    Tk.1,469 crore against the target of Tk.1,771                                                                                                                                                                                                                                           vehicles.                                                      Production                                                                and                                 affixing 
                                                                    crore.  The  figures  of  target  and  actual                                                                                                                                                                                                                                           activates  of  Retro  Reflective  Number 
                                                                    collection of revenues from the FY2008-09 to                                                                                                                                                                                                                                            Plates                                      and                             RFID  tags  have  been 
                                                                    FY2016-17 are given below:                                                                                                                                                                                                                                                              continuing 
                                                                                                                                                                                                                                                                                                                                                           In  FY2016-17  a  total  of  3,77,802  chip-
                                                                      Table 11.3: Revenue Target and Collection                                                                                                                                                                                                                                             based  electronic  smart  Card  Driving 
                                                                                                                                                                of BRTA                                                                                                                                                                                     License                                                have                                   been                                   produced                                                      and 
                                                                                                                                                          (In crore Taka)                              distributed 
                                                                                     Fiscal                                          Target                                          Collection                                                Percentage                                                                                                  In  FY2016-17 a total of 4,77,205 Chip-
                                                                                        year                                      Amount                                                                                                    of Collection                                                                                                   based  Electronic  Digital  Registration 
                                                                                                                                                                                                                                                             (%)                                                                                            Certificate  (DRC)  have  been  produced 
                                                                                2008-09                                      550                                                  646                                                      117.59                                                                                                           and 3,12,592 DRC  was distributed 
                                                                                2009-10                                      660                                                  642                                                      97.35 
                                                                                2010-11                                      870                                                  685                                                      78.76                                                                                                           Collection of MV taxes and fees through 
                                                                                2011-12                                      903                                                  642                                                      71.09                                                                                                            online banking system is continuing 
                                                                                2012-13                                      1101                                                 769                                                      69.91                                                                                                           A modern central Data Center has been 
                                                                                2013-14                                      1156                                                 952                                                      82.33 
                                                                                2014-15                                      1249                                                 1062                                                     85.04                                                                                                            established                                                            for                            preserving                                                          different 
                                                                                2015-16                                      1354                                                 1619                                                     119.57                                                                                                           vehicle  and  driving  license  data  with 
                                                                                2016-17                                      1771                                                 1469                                                     82.95                                                                                                            safety and security  
                                                                      Source: BRTA 
                                                                                                                                                                                                                                                                                                                                                           Processing  registration  and  issuing  tax 
                                                                                                                                                                                                                                                                                                                                                            token,  fitness,  fitness  certificate,  route 
                                                                                                                                                                                                                                                                                                                                            Chapter 11- Transport and Communication | 152  
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  162 
                                                                                                                                                                                                                                                                                                                             
The words contained in this file might help you see if this file matches what you are looking for:

...Bangladesh economic review chapter transport and communication system as an essential physical infrastructure plays important role in socio development of the country it is very much necessary to make a developed efficient compatible with international national regional road network considered this view padma bridge metro rail dhaka elevated express way some other mega projects are being implemented operate railway environment friendly safe affordable dependable means gain commercial financial success professional knowledge based organisational reforms sector improvement several measures have already been undertaken for dredging dying river ways maintenance navigability different routes ensuring movement water crafts inland ports creating facilities carry container goods waterways etc limited resources biman airlines conducting flights modernise develop expand s telecommunications various by government keeping consistency targets vision sdg seventh five year plan has initiatives inform...

no reviews yet
Please Login to review.