jagomart
digital resources
picture1_Construction Template Excel 41850 | Pbw Item Download 2022-08-15 06-42-12


 264x       Filetype XLSX       File size 2.85 MB       Source: www.wisconsin.edu


File: Construction Template Excel 41850 | Pbw Item Download 2022-08-15 06-42-12
quick inflation factor update qifu worksheet a b c 1 location x 2 project title x 3 4 062022 base date 5 012027 inflation date defaults to bid date from ...

icon picture XLSX Filetype Excel XLSX | Posted on 15 Aug 2022 | 3 years ago
Partial file snippet.
                        Quick Inflation Factor Update (QIFU) Worksheet
                                         A                           B                                                                   C
                  1                         LOCATION:                           X
                  2                 PROJECT TITLE:                              X
                  3
                  4                              06/2022                        Base Date
                  5                              01/2027                        Inflation Date (defaults to Bid Date from PBW, can be manually overwritten)
                  6                               1.6134                        Inflation Factor (Value)
                  7             ENR Index'!$EL$202                              Inflation Factor (ENR Index Worksheet Cell Reference)
                  8
                  9
                 10         REVISED ESTIMATE
                 11
                 12  $                                    -                     Construction Cost (Unescalated)
                 13  $                                    -                     Hazardous Materials (Unescalated)
                 14  $                                    -                     Construction Total (Unescalated)
                 15  $                                    -         0.0000%Design Contingency
                 16  $                                    -         0.0000%Overhead & Profit (OH&P)
                 17  $                                    -                     Total Construction (Unescalated)
                 18  $                                    -          1.6134  ENR Inflation Factor and Inflation Budget Estimate
                 19  $                                    -                     Total Construction (Escalated)
                 20
                 21
                 22
                 23  $                                    -                     Construction Budget Total
                 24
                 25                             #VALUE!                         Design Fees (Basic)
                 26                             #VALUE!                         Design Fees (Other)
                 27                             #VALUE!                         Design Fees Budget Total
                 28
                 29                             #VALUE!                         Contingency
                 30
                 31                             #VALUE!                         Management Fees
                 32
                 33  $                                    -                     FF&E: Owner Furnished, Contractor Installed (OFCI)
                 34  $                                    -                     FF&E: Owner Furnished, Owner Installed (OFOI)
                 35  $                                    -                     Furnishings, Fixtures, & Equipment Budget (FF&E) Total
                 36
                 37                             #VALUE!                         TOTAL BUDGET
                 38
                 39 Notes:
                 40
                 41 This worksheet references data from the [PBW] and [PBW_Summary] worksheets. It is intended to provide a quick budget estimate based on updated 
                 42 ENR Building Cost Index values when they are published in subsequent PBW templates. The current budget estimate is based on the Inflation Factor 
                 43 displayed in cells [A6] and [B17]. Assuming no other changes to the PBW content other than ENR Index values, the value in cell [B17] may be 
                 44 overwritten based on the new Inflation Factor contained in subsequent PBW templates. Simply open the newest PBW template and find the current 
                 45 Inflation Factor calculated for the specified Based Date and Bid Date in the [ENR] worksheet, which is located in the cell reference displayed in cell [A7]. 
                 46 Enter that new Inflation Factor value in cell [B17] in this workbook, and the new project budget estimate will be calculated and updated to current ENR 
                 47 Index standards.
                 48
                 49
                 50
                 51
              08/15/2022                                                                    PBW Quick Inflation Factor Upate (QIDU)                                                                             1 of 40
         Quick Inflation Factor Update (QIFU) Worksheet
                D
       1
       2
       3
       4           06/2022
       5           12/1899
       6           1.6134 
       7
       8
       9
       10 ORIGINAL ESTIMATE
       11
       12  $                                    - 
       13  $                                    - 
       14  $                                    - 
       15  $                                    - 
       16  $                                    - 
       17  $                                    - 
       18  $                                    - 
       19  $                                    - 
       20
       21
       22
       23  $                                    - 
       24
       25  $                                    - 
       26  $                                    - 
       27  $                                    - 
       28
       29  $                                    - 
       30
       31  $                                    - 
       32
       33  $                                    - 
       34  $                                    - 
       35  $                                    - 
       36
       37  $                                    - 
       38
       39
       40
       41
This worksheet references data from the [PBW] and [PBW_Summary] worksheets. It is intended to provide a quick budget estimate based on updated 
       42
ENR Building Cost Index values when they are published in subsequent PBW templates. The current budget estimate is based on the Inflation Factor 
displayed in cells [A6] and [B17]. Assuming no other changes to the PBW content other than ENR Index values, the value in cell [B17] may be 
       43
overwritten based on the new Inflation Factor contained in subsequent PBW templates. Simply open the newest PBW template and find the current 
       44
Inflation Factor calculated for the specified Based Date and Bid Date in the [ENR] worksheet, which is located in the cell reference displayed in cell [A7]. 
       45
Enter that new Inflation Factor value in cell [B17] in this workbook, and the new project budget estimate will be calculated and updated to current ENR 
       46
       47
       48
       49
       50
       51
     08/15/2022                    PBW Quick Inflation Factor Upate (QIDU)    2 of 40
                           Quick Inflation Date Update (QIDU) Worksheet
                                         A                           B                                                                   C
                  1                         LOCATION:                           X
                  2                 PROJECT TITLE:                              X
                  3
                  4                              06/2022                        Base Date
                  5                              01/2027                        Inflation Date (defaults to Bid Date from PBW, can be manually overwritten)
                  6                               1.6134                        Inflation Factor (Value)
                  7                        ex'!$EL$202                          Inflation Factor (ENR Index Worksheet Cell Reference)
                  8
                  9
                 10         REVISED ESTIMATE
                 11
                 12  $                                    -                     Construction Cost (Unescalated)
                 13  $                                    -                     Hazardous Materials (Unescalated)
                 14  $                                    -                     Construction Total (Unescalated)
                 15  $                                    -         0.0000%Design Contingency
                 16  $                                    -         0.0000%Overhead & Profit (OH&P)
                 17  $                                    -                     Total Construction (Unescalated)
                 18  $                                    -          1.6134  ENR Inflation Factor and Inflation Budget Estimate
                 19  $                                    -                     Total Construction (Escalated)
                 20
                 21
                 22
                 23  $                                    -                     Construction Budget Total
                 24
                 25                             #VALUE!                         Design Fees (Basic)
                 26                             #VALUE!                         Design Fees (Other)
                 27                             #VALUE!                         Design Fees Budget Total
                 28
                 29                             #VALUE!                         Contingency
                 30
                 31                             #VALUE!                         Management Fees
                 32
                 33  $                                    -                     FF&E: Owner Furnished, Contractor Installed (OFCI)
                 34  $                                    -                     FF&E: Owner Furnished, Owner Installed (OFOI)
                 35  $                                    -                     Furnishings, Fixtures, & Equipment Budget (FF&E) Total
                 36
                 37                             #VALUE!                         TOTAL BUDGET
                 38
                 39 Notes:
                 40
                 41 This worksheet references data from the [PBW] and [PBW_Summary] worksheets. It is intended to provide a quick budget estimate based on updated 
                 42 ENR Building Cost Index values when they are published in subsequent PBW templates. The current budget estimate is based on the Inflation Factor 
                 43 displayed in cells [A6] and [B17]. Changing the Inflation Date value in cell [A5], which defaults to the Projected Bid Date value from the [PBW] worksheet 
                 44 cell [H11], will change the Inflation Factor used in calculating the budget estimate in cells [A6] and [B17]. This methodology assumes no other changes to 
                 45 PBW content values other than the ENR Index values corresponding to the new Inflation Date.
                 46
                 47
                 48
                 49
                 50
                 51
              08/15/2022                                                                     PBW Quick Inflation Date Upate (QIDU)                                                                              3 of 40
          Quick Inflation Date Update (QIDU) Worksheet
                D
       1
       2
       3
       4           06/2022
       5           12/1899
       6           1.6134 
       7
       8
       9
       10 ORIGINAL ESTIMATE
       11
       12  $                                    - 
       13  $                                    - 
       14  $                                    - 
       15  $                                    - 
       16  $                                    - 
       17  $                                    - 
       18  $                                    - 
       19  $                                    - 
       20
       21
       22
       23  $                                    - 
       24
       25  $                                    - 
       26  $                                    - 
       27  $                                    - 
       28
       29  $                                    - 
       30
       31  $                                    - 
       32
       33  $                                    - 
       34  $                                    - 
       35  $                                    - 
       36
       37  $                                    - 
       38
       39
       40
       41
This worksheet references data from the [PBW] and [PBW_Summary] worksheets. It is intended to provide a quick budget estimate based on updated 
       42
ENR Building Cost Index values when they are published in subsequent PBW templates. The current budget estimate is based on the Inflation Factor 
displayed in cells [A6] and [B17]. Changing the Inflation Date value in cell [A5], which defaults to the Projected Bid Date value from the [PBW] worksheet 
       43
cell [H11], will change the Inflation Factor used in calculating the budget estimate in cells [A6] and [B17]. This methodology assumes no other changes to 
       44
       45
       46
       47
       48
       49
       50
       51
     08/15/2022                    PBW Quick Inflation Date Upate (QIDU)      4 of 40
The words contained in this file might help you see if this file matches what you are looking for:

...Quick inflation factor update qifu worksheet a b c location x project title base date defaults to bid from pbw can be manually overwritten value enr index el cell reference revised estimate construction cost unescalated hazardous materials total design contingency overhead profit oh p and budget escalated fees basic other management ff e owner furnished contractor installed ofci ofoi furnishings fixtures equipment notes this references data the worksheets it is intended provide based on updated building values when they are published in subsequent templates current displayed cells assuming no changes content than may new contained simply open newest template find calculated for specified which located enter that workbook will standards upate qidu of d original ex ow...

no reviews yet
Please Login to review.