picture1_Free Excel Construction Templates 40288 | 012 B23 Fwce Cmg Feasibility Working Cost Estimate V2


 156x       Filetype XLSX       File size 0.12 MB       Source: www.nationaltransport.ie


File: Free Excel Construction Templates 40288 | 012 B23 Fwce Cmg Feasibility Working Cost Estimate V2
sheet 1 cost estimate feasibility working cost estimate template note for band 2 amp 3 projects the activity cost heads presented are the minimum expected for a linear road project ...

icon picture XLSX Filetype Excel XLSX | Posted on 14 Aug 2022 | 3 years ago
Partial file snippet.
Sheet 1: Cost Estimate














Feasibility Working Cost Estimate Template














NOTE: For Band 2 & 3 Projects the activity cost heads presented are the minimum expected for a linear road project and are to be proposed, discussed and agreed in writing with NTA prior to production of the cost estimate.


Project Title:

















Project / Contract Code:
Prepared By (Individual/Organisation):

















Approving Authority:
Date Estimate Prepared:

















Sponsoring Agency:
Base Date of Estimate: Estimating Methodology: Period in which prices in the cost estimate relate to (e.g. Q1 2021)

















Project Information











1













2
Mainline Cross-Section Type:
Location:


3



4
Total Mainline Length (m):
Road Rating:


5




Total Mainline Width (m):
Land take Required:







Potential Construction Works Start Date:
Anticipated Construction Works Duration:
Months






Other Relevant Project Information:







1 Construction Costs


Ref Description Total


1.1 Site Clearance



1.2 Fencing



1.3 Road Restraint Systems



1.4 Earthworks



1.5 Drainage



1.6 Pavements



1.7 Kerbing & Footways



1.8 Traffic Signs & Road Marking



1.9 Road Lighting



1.10 Structural Concrete (Including Structures Generally)



1.11 Accommodation Works



1.12 Works for Statutory Undertakers



1.13 Landscaping & Ecology



1.14 Other Project Costs



1.15 Preliminaries Including Site Compounds (excluding traffic management)



Sub-Total A - Construction Costs € -


Add-On Costs


Ref Description Quantity Unit Rate Total


1.16 Preparation and Administration Costs


€ -


1.16.1 Scope & Purpose


€ -


1.16.2 Concept, Development & Option Selection


€ -


1.16.3 Preliminary Design


€ -


1.16.4 Statutory Processes


€ -


1.16.5 Detailed Design & Procurement


€ -


1.16.6 Construction & Implementation


€ -


1.16.7 Close Out & Review


€ -


1.17 Traffic Management Related Costs
% € - € -


1.18 Land and Property Costs
Item
€ -

m2
Sub-Total B - Add-On Costs € -

HA



Item
2 Adjustments



Description Quantity Unit Rate Total



Add Inflation


€ -

%

Add Contingency (001_B123_CC_CMG)
% € - € -

Item

Total Adjustments € -





















Total Feasibility Working Cost Estimate Exclusive of VAT € -
















VAT on Construction Costs, TM and Associated Adjustment Costs




% € - € -


VAT on Preparation and Administration Costs
% € - € -


VAT on Land and Property
Item Estimating Methodology The applicable VAT rate is to be determined by each user individually. A hyperlink to applicable rules/laws relating to the applicability of VAT is included for reference and assessment purposes.
€ -


https://www.revenue.ie/en/vat/vat-on-property-and-construction/vat-and-the-supply-of-property/index.aspx
















Total Feasibility Working Cost Estimate Inclusive of VAT € -






























Mainline Length

10 Km

Rate Per Km (Excluding VAT) € -









Rate Per Km (Including VAT) € -






























Source of Cost Data (Please provide a brief narrative on the source of cost data in the box below)












































Revision Title Prepared By Checked By Issue Date














































NOTE: Costs are considered to include all allowances for overheads and profits.
Costs are reflective of costs at the base date stated above.
VAT is not applicable to all land and property therefore it is not appropriate to apply a uniform percentage. The value associated with VAT on land and property is to be determined on an individual basis and included as a lump sum.





Sheet 2: PCD Summary











Project Control Document Summary
NOTE: The information below will be auto-generated from the main cost estimate template to obtain the relevant totals in line with the seven costs heads required for inclusion within the project control document.
Project Title: 0

Project / Contract Code: 0 Prepared By (Individual & Organisation) 30/12/1899

Approving Authority: 0 Date Estimate Prepared: 30/12/1899

Sponsoring Agency: 0 Base Date of Estimate: Estimating Methodology Period in which prices in the cost estimate relate to (e.g. Q1 2021) 30/12/1899











1 PCD Summary









1.1 Scope & Purpose 1 Item € - € -

1.2 Concept, Development & Option Selection 1 Item € - € -

1.3 Preliminary Design 1 Item € - € -

1.4 Statutory Processes 1 Item € - € -

1.5 Detailed Design & Procurement 1 Item € - € -

1.6 Construction & Implementation 1 Item € - € -

1.7 Close Out & Review 1 Item € - € -



Total (excluding VAT) € -













NOTE: Costs are reflective of costs at the base date stated above.
Costs are considered to include allowances for overheads and profit.


Sheet 3: Assumptions












Estimate Assumptions, Exclusions and Inclusions













Project Title: 0












Project / Contract Code: 0












Approving Authority: 0












Sponsoring Agency: 0












Prepared By (Individual/Organisation) 0












1 Construction Costs
The basis upon which the construction costs have been estimated shall be identified in this section, including any assumptions, exclusions or inclusions that would help the reader understand the basis of the estimate. The source of the cost data used to develop the cost estimate should also be clearly detailed.









2 Delivery and Construction Programme
Any assumptions, exclusions or inclusions that have been made in relation to the delivery methodology of construction programme shall be clearly identified in this section.






3 Preparation and Administration Costs
Any assumptions, exclusions or inclusions that have been made in relation to preparation and administration (design & supervision) shall be clearly identified in this section. Substantiation/justification of the percentage applied in the cost estimate shall be provided in this section.






4 Traffic Management Related Costs
Any assumptions, exclusions or inclusions that have been made in relation to traffic management related costs shall be clearly identified in this section. Substantiation/justification of the percentage applied in the cost estimate shall be provided in this section.






5 Land and Property Costs
Any assumptions, exclusions or inclusions that have been made in relation to land and property costs shall be clearly identified in this section. Substantiation/justification of the value included in the cost estimate shall be provided.






6 Other Relevant Information
Any other relevant information, general assumptions, exclusions or inclusions that have been used to develop the cost estimate shall be included in this section.






























Revision Title Prepared By Checked By Issue Date

























































































































































































































































































































































































































































































































































































The words contained in this file might help you see if this file matches what you are looking for:

...Sheet cost estimate feasibility working template note for band amp projects the activity heads presented are minimum expected a linear road project and to be proposed discussed agreed in writing with nta prior production of title contract code prepared by individualorganisation approving authority date sponsoring agency base estimating methodology period which prices relate eg q information mainline crosssection type location total length m rating width land take required potential construction works start anticipated duration months other relevant costs ref description site clearance fencing restraint systems earthworks drainage pavements kerbing footways traffic signs marking lighting structural concrete including structures generally accommodation statutory undertakers landscaping ecology preliminaries compounds excluding management subtotal euro addon quantity unit rate preparation administration scope purpose concept development option selection preliminary design processes detail...

no reviews yet
Please Login to review.