picture1_Construction Template Excel 40286 | 2022 Trail Construction Cost Estimate Form


 235x       Filetype XLSX       File size 0.03 MB       Source: www.morriscountynj.gov


File: Construction Template Excel 40286 | 2022 Trail Construction Cost Estimate Form
sheet 1 2022 cost est sht 1 applicant name project title date general notes 1 below is a list of typical construction cost items for use in preparing your project ...

icon picture XLSX Filetype Excel XLSX | Posted on 14 Aug 2022 | 3 years ago
Partial file snippet.
Sheet 1: 2022 Cost Est. Sht. 1

APPLICANT NAME:

PROJECT TITLE:
DATE:






GENERAL NOTES
1) Below is a list of typical construction cost items for use in preparing your project cost estimate. This form is required and must be completed and submitted if you are preparing a grant application under the MINOR CONSTRUCTION CATEGORY. The list below is not all inclusive and should include individual needs of your project.

2) It is critical that you prepare and submit an accurate cost estimate at the time of application. The cost estimate should include all items necessary to complete your project. Grant awards will not be modified to account for unanticipated costs.

3) All cost items should be quantified using current year pricing.

4) A maximum 10% contingency is allowable.
SECTION A: TOTAL PROJECT COSTS






SECTION A1: DIRECT COSTS - LABOR
ITEM DESCRIPTION QUANTITY UNIT UNIT COST AMOUNT
1 Equipment Operator
Hrly/Daily/Wk
$-
2 Supervisor/Foreman
Hrly/Daily/Wk
$-
3 Laborer
Hrly/Daily/Wk
$-
4 Volunteer (complete if using volunteers)
Hrly/Daily/Wk
$-
5 other:


$-
6 other:


$-
7 other:


$-
Labor Subtotal: $-






SECTION A2: DIRECT COSTS - EQUIPMENT
8 Equipment Rental
Hrly/Daily/Wk
$-
9 other:


$-
10 other:


$-
11 other:


$-
Equipment Subtotal: $-

SECTION A3: DIRECT COSTS - MATERIAL
12 Excavation
C.Y.
$-
13 Mobilization/Demobilization
L.S.
$-
14 Site Clearing
L.S.
$-
15 Slope Stabilization
S.Y.
$-
16 Lumber
L.F.
$-
17 Bridge Structure (Prefabricated)
Unit
$-
18 Drains/Underdrain/Piping
L.F.
$-
19 Geotextile Fabric
S.Y.
$-
20 DGA
Ton
$-
21 Stone Dust
Ton
$-
22 Rip-Rap
Ton
$-
23 Asphalt
Ton
$-
24 Concrete
C.Y.
$-
25 Pervious Pavement
Ton
$-
26 Soil Erosion Control Measures
L.S.
$-
27 Silt Fence
L.F.
$-
28 Topsoil
Ton
$-
29 Fertilize & Seed
S.Y.
$-
30 Mulch
S.Y.
$-
31 Tree Removal
Unit
$-
32 Disposal
Ton
$-
33 Posts
Unit
$-
34 other:


$-
35 other:


$-
36 other:


$-
Material Subtotal: $-






SECTION A4: DIRECT COSTS - AMENITIES
37 Signs/Wayfinding
Unit
$-
38 Interpretive Signs
Unit
$-
39 Kiosks
Unit
$-
40 Gates
Unit
$-
41 Benches
Unit
$-
42 Landscaping
L.S.
$-
43 Fencing
L.F.
$-
44 Trail Markers
Unit
$-
45 Overlooks
Unit
$-
46 Piers
Unit
$-
47 Boat launch
Unit
$-
48 other:


$-
49 other:


$-
50 other:


$-
Amenity Subtotal: $-
Ai) Costs of all trail amenities shall be itemized separately and shall not exceed the cost of trail construction. Individual grants for amenities are not eligible, including trail head facilities and parking areas.
LINE 1: DIRECT COSTS TOTAL (Section A1 through A4): $-
LINE 2: Contingency (10% Maximum of Line 1) $-
LINE 3: TOTAL PROJECT COSTS (Total of Line 1 & 2) $-
SECTION B: REQUIRED MATCH

AMOUNT
LINE 4: REQUIRED MATCH (20% OF LINE 3) $-







SECTION B1: MATCHING DIRECT COSTS
ITEM TYPE
AMOUNT

Direct Costs


Direct Costs


Direct Costs


Direct Costs

Direct Costs


Direct Costs

Direct Cost Subtotal: $-

SECTION B2: MATCHING OPEN SPACE FUNDS

Municipal Open Space Funds


SECTION B3: MATCHING OTHER GRANT RESOURCES

Other Grant Source


Other Grant Source


Other Grant Source


Other Grant Source


Other Grant Source

Other Grant Resource Subtotal: $-

SECTION B4: MATCHING OTHER MUNICIPAL FUNDS

Municipal Funds


LINE 5: MATCHING DIRECT COST TOTAL (Section B1 through B4) $-













Bi) The match can be made up of a combination of sources including direct cost items, select indirect cost items, Municipal Open Space funding, other grants, and municipal funds.

Bii) In Section B1 above, include the item number and description of direct cost items being used toward the required match. Use specific item numbers outlined in Section A1 through Section A4.

Biii) The total match must be equal to or exceed 20% of the Total Project Cost.

Biv) Provide name of grant and include copy of official award letter with application for verification of each grant resource listed above in Section B4.
SECTION C: REQUESTED GRANT & SUMMARY
DESCRIPTION AMOUNT
TOTAL PROJECT COSTS (LINE 3) $-
MATCHING DIRECT COST TOTAL (LINE 5) $-
MATCHING IN-DIRECT COST TOTAL (SECTION C1) $-
REQUESTED GRANT (Cannot exceed LINE 3) $-

SECTION D: SIGNATURES






Di) I certify that this information reflects the accurate costs required to complete the project.






Dii) I understand that the grant is awarded on a reimbursement basis, and if awarded the Municipality would be required to provide full funding in advance.






Diii) I understand that additional grant funds will not be available after grant awards are made.














Authorizing Signature

Date of Signature

(Engineer, Administrator, CFO)




The words contained in this file might help you see if this file matches what you are looking for:

...Sheet cost est sht applicant name project title date general notes below is a list of typical construction items for use in preparing your estimate this form required and must be completed submitted if you are grant application under the minor category not all inclusive should include individual needs it critical that prepare submit an accurate at time necessary to complete awards will modified account unanticipated costs quantified using current year pricing maximum contingency allowable section total direct labor item description quantity unit amount equipment operator hrlydailywk supervisorforeman laborer volunteer volunteers other subtotal rental material excavation cy mobilizationdemobilization ls site clearing slope stabilization sy lumber lf bridge structure prefabricated drainsunderdrainpiping geotextile fabric dga ton stone dust riprap asphalt concrete pervious pavement soil erosion control measures silt fence topsoil fertilize amp seed mulch tree removal disposal posts amenit...