File: Contractor's Cost Certification Form
sheet 1 cost breakdown kentucky housing corporation 2 contractor s cost certification forms project name contractor name owner name project location all amounts shown below have been reduced to give ...

icon picture XLSX Filetype Excel XLSX | Posted on 14 Aug 2022 | 3 years ago
Partial file snippet.
Sheet 1: Cost Breakdown
Kentucky Housing Corporation
2. CONTRACTOR'S COST CERTIFICATION FORMS







Project Name:
Contractor Name:







Owner Name:
Project Location:







All amounts shown below have been reduced to give effect to the amounts of any rebates, adjustments, discounts (except as allowed in the Cost Certification Guidelines), or any other devices, which if included, would have the effect of overstating the actual costs.
Please insert additional lines if more space is needed





CSI Section Title New Construction Rehabilitation Commercial Total Name of Subcontractor
or Payee
1 General Requirements (Including Construction Management, Building Permit Fees, Tap Fees, Impact Fees, Construction Insurances, Bond Premiums, Site Security, Sewage Disposal Fees, etc.) $- $- $- $-















Subtotal $- $- $- $-
2 Existing Conditions $- $- $- $-















Subtotal $- $- $- $-
3 Concrete $- $- $- $-















Subtotal $- $- $- $-
4 Masonry $- $- $- $-















Subtotal $- $- $- $-
5 Metals $- $- $- $-















Subtotal $- $- $- $-
6 Wood, Plastics and Composites $- $- $- $-















Subtotal $- $- $- $-
7 Thermal and Moisture Protection $- $- $- $-















Subtotal $- $- $- $-
8 Openings $- $- $- $-















Subtotal $- $- $- $-
9 Finishes $- $- $- $-















Subtotal $- $- $- $-
10 Specialties $- $- $- $-















Subtotal $- $- $- $-
11 Equipment $- $- $- $-















Subtotal $- $- $- $-
12 Furnishings $- $- $- $-















Subtotal $- $- $- $-
13 Special Construction $- $- $- $-















Subtotal $- $- $- $-
14 Conveying Equipment $- $- $- $-















Subtotal $- $- $- $-
15 Reserved $- $- $- $-
16 Reserved $- $- $- $-
17 Reserved $- $- $- $-
18 Reserved $- $- $- $-
19 Reserved $- $- $- $-
20 Reserved $- $- $- $-
21 Fire Suppression $- $- $- $-















Subtotal $- $- $- $-
22 Plumbing $- $- $- $-















Subtotal $- $- $- $-
23 HVAC $- $- $- $-















Subtotal $- $- $- $-
24 Reserved $- $- $- $-
25 Integrated Automation $- $- $- $-















Subtotal $- $- $- $-
26 Electrical $- $- $- $-















Subtotal $- $- $- $-
27 Communications $- $- $- $-















Subtotal $- $- $- $-
28 Electronic Safety and Security $- $- $- $-















Subtotal $- $- $- $-
29 Reserved $- $- $- $-
30 Reserved $- $- $- $-
31 Earthwork $- $- $- $-















Subtotal $- $- $- $-
32 Exterior Improvements $- $- $- $-















Subtotal $- $- $- $-
33 Utilities $- $- $- $-















Subtotal $- $- $- $-
34 Transportation $- $- $- $-















Subtotal $- $- $- $-
35 Waterway and Marine Construction $- $- $- $-















Subtotal $- $- $- $-
36 Reserved $- $- $- $-
37 Reserved $- $- $- $-
38 Reserved $- $- $- $-
39 Reserved $- $- $- $-
40 Process Interconnections $- $- $- $-















Subtotal $- $- $- $-
41 Material Processing and Handling Equipment $- $- $- $-















Subtotal $- $- $- $-
42 Process Heating, Cooling, and Drying Equipment $- $- $- $-















Subtotal $- $- $- $-
43 Process Gas and Liquid Handling, Purification and Storage Equipment $- $- $- $-















Subtotal $- $- $- $-
44 Pollution and Waste Control Equipment $- $- $- $-















Subtotal $- $- $- $-
45 Industry-Specific Manufacturing Equipment $- $- $- $-















Subtotal $- $- $- $-
46 Water and Wastewater Equipment $- $- $- $-















Subtotal $- $- $- $-
47 Reserved $- $- $- $-
48 Electrical Power Generation $- $- $- $-















Subtotal $- $- $- $-
49 Reserved $- $- $- $-
50 Reserved $- $- $- $-








Sub-Total $- $- $- $-















Total Construction Costs (Without General Requirements) $0 $0 $0 $0

Total Construction Costs (Including General Requirements) $0 $0 $0 $0

Sheet 2: Profit and Overhead
KENTUCKY HOUSING CORPORATION




2. CONTRACTOR'S COST CERTIFICATION FORMS








Project Name: 0




Owner Name: 0




Contractor Name: 0








Contractor Profit, Overhead, and General Requirements Calculation







General Contractor Contractor

Requirements Overhead Profit
General Contractor Costs $0 $0 $0
Allowable Percentages 6% 2% 6%
Maximum Fee $0 $0 $0
Certified Amounts


Subcontractors* (list below)






















Total** $0 $0 $0








* - Reduce the amount of the above items payable to the General Contractor by the amounts paid for general requirements, contractor overhead and contractor profit to any identity of interest sub-contractor, material supplier or equipment lessor included within the trade item cost breakdown.






** - Totals must match amounts listed as General Requirements, Contractor Overhead and Contractor Profit on "Project Cost" breakdown on the Owner's Cost Certification.




If space is insufficient on this form for any line item, insert additional lines.



Sheet 3: Contractor Certification
KENTUCKY HOUSING CORPORATION

2. CONTRACTOR'S COST CERTIFICATION FORMS
























Project Name: 0


















Owner Name: 0


















Contractor Name: 0






























General Contractor Certification






















The undersigned hereby certifies that: (Check One)























There has not been and is not now any identity of interest between the general contractor on the one hand and the










owner or any subcontractor, material supplier, or equipment lessor on the other.






















An identity of interest exists between the general contractor on the one hand and the owner or any










subcontractor, material supplier or equipment lessor on the other.










The following statement fully describes the identity of interest relationship(s):














































All amounts shown have been reduced to give effect to the amount(s) of any kickbacks, rebates, adjustments, discounts,










(except as allowed in the Cost Certification Guidelines), or any other devices which, if included, would have the effect of










overstating the actual costs.






















I hereby certify that all the information stated herein, as well as any information provided in the accompaniment herewith, is










true and accurate.





































Contractor







By

















Its

















Date

The words contained in this file might help you see if this file matches what you are looking for:

...Sheet cost breakdown kentucky housing corporation contractor s certification forms project name owner location all amounts shown below have been reduced to give effect the of any rebates adjustments discounts except as allowed in guidelines or other devices which if included would overstating actual costs please insert additional lines more space is needed csi section title new construction rehabilitation commercial total subcontractor payee general requirements including management building permit fees tap impact insurances bond premiums site security sewage disposal etc subtotal existing conditions concrete masonry metals wood plastics and composites thermal moisture protection openings finishes specialties equipment furnishings special conveying reserved fire suppression plumbing hvac integrated automation electrical communications electronic safety earthwork exterior improvements utilities transportation waterway marine process interconnections material processing handling heating ...

no reviews yet
Please Login to review.