               RFP Cost Proposal Template - sample project               Fill in blue shaded areas - the remainder should populate on its own.
                                                                         NOTE:  You are not required to use this spreadsheet for your cost proposal.  
                                                                                      However, the cost proposal submittal must contain all tasks and hours as shown below.
               Sample Project Location:  On T.H. 60 from ¾ mile west of West Jct. T.H. 4 to ¾ miles west of West Jct. T.H. 15 both directions 
               Sample Project Description: Unbonded Concrete Overlay, Culvert Lining, Bituminous Surfacing 
               Project Identification:    ☒ Project Manager        ☒ Construction Project Supervisor       
               Sample Letting Date:  November 2020 (construction limits are due two years before letting)
               Sample Construction Dates:  May through September 2021
               Scope of work:  Contractor will provide the following to the State in accordance with Exhibit B, Scope of Work and the indicated schedule:
               1.  Coordinate with District and Central Office functional groups and local governments to identify potential scope items and determine the project scope, 
                    schedule and budget.
               For purposes of developing a contract bid, assume that item one above led to determination of the following scope:
               ·         Remove existing bituminous
               ·         Unbonded concrete overlay; 1.5” Passrac; 7.5” concrete (up to 9” grade raise); 28’ top (3’ inside shoulder, 2x12’ lanes, 1’ of outside shoulder)
               ·         Reclaim 4” shoulders; add gravel for grade raise; paving outside shoulder 4” bit 8’ wide
               ·         Unbonded concrete overlay on all ramps in project area; tie in at ramp terminal
               ·         Widen shoulder (as gravel) for truck parking at top of on ramps
               ·         Reconstruct roadway under overpasses
               ·         Reconstruct roadway at tie ins on each end and at bridge over Watonwan river
               ·         Reconstruct side road to tie in to new elevations
               ·         Striping
               ·         Rumble strips
               ·         Grading inslopes to maintain 1:4 inslope
               ·         Culvert extensions at 18 culverts
               ·         Repair (or replace) 6 condition 3 and 4 culverts
               ·         Riprap basins as needed
               ·         Replace triple 10’ CSP culvert with precast concrete box culverts
               ·         Update existing guardrail
               ·         Add lighting at paved county road at-grade intersections
               ·         Hwy 4 east Jct bridge over TH 60 - Mill and overlay deck, strip seal, update guardrail (if needed), patching delaminated members
               ·         CR 27bridge over TH 60 - Mill and patch and overlay deck, strip seal, update guardrail (if needed), patching delaminated members
               ·         Construct one cross over and utilize existing cross over to allow 2 lane 2 way traffic during construction;
               ·         Detour for duration of box culvert replacement
               ·         Right of way for culvert extensions
               ·         Agreement with Watonwan County for lighting maintenance
                   2.      Manage the project through letting.
                   3.      Manage the project through construction to closeout.
                   4.      Serve as Project Supervisor during construction.
         RFP Cost Proposal - Project Manager
                                                                                    Estimated                                                  Travel Expenses                   Total Cost Per 
            Task                                Task                                 Hours      Hourly Rate Total Labor Costs    miles        $0.535         Meals    Lodging        Task
            1.1    Document project plans                                              40                                $0.00                       $0.00                                 $0.00
                   Work Breakdown Structure                                            10                                $0.00                       $0.00                                 $0.00
                   Schedule                                                            60                                $0.00                       $0.00                                 $0.00
                   Cost Estimate                                                       20                                $0.00                       $0.00                                 $0.00
                   Risk Register                                                       20                                $0.00                       $0.00                                 $0.00
                   Public Engagement Plan                                              20                                $0.00                       $0.00                                 $0.00
                   Project Management Plan                                             20                                $0.00                       $0.00                                 $0.00
            1.2    Develop quantities for early cost estimates                         40                                $0.00                       $0.00                                 $0.00
            1.3    Provide project controls - update/analyze project schedule          70                                $0.00                       $0.00                                 $0.00
                   identify/update issues/action items                                 100                               $0.00                       $0.00                                 $0.00
            1.4    Guide project delivery - determine team functional unit actions     100                               $0.00                       $0.00                                 $0.00
                   archive deliverables/distribute as appropriate                      50                                $0.00                       $0.00                                 $0.00
                   schedule meetings/prepare agendas/keep meeting minutes              100                               $0.00                       $0.00                                 $0.00
            1.5    Quality Manager - deliverables from functional units                80                                $0.00                       $0.00                                 $0.00
            1.6    Collect/distribute project documents to project team work units     160                               $0.00                       $0.00                                 $0.00
                   track schedule progress on functional units                         50                                $0.00                       $0.00                                 $0.00
            1.7    Develop public and agency contact lists                             20                                $0.00                       $0.00                                 $0.00
                   correspondence                                                      40                                $0.00                       $0.00                                 $0.00
                   display preparation                                                 20                                $0.00                       $0.00                                 $0.00
                   conduct public engagement meetings                                  40                                $0.00                       $0.00                                 $0.00
            1.8    Represent MnDOT in coordination with external stakeholders          100                               $0.00                       $0.00                                 $0.00
            1.9    provide ongoing project leadership                                  100                               $0.00                       $0.00                                 $0.00
                   Provide support to District Resident Office during construction     50                                $0.00                       $0.00                                 $0.00
            1.10   Identify/motivate/manage project team work units                    80                                $0.00                       $0.00                                 $0.00
            1.11   Participate in Program Management meetings                          50                                $0.00                       $0.00                                 $0.00
            1.12   Communications with State's Project Manager                         60                                $0.00                       $0.00                                 $0.00
                                                                                                                                                                                           $0.00
                                                                         Subtotal     1500                               $0.00         0             $0.00     $0.00     $0.00             $0.00
                   RFP Cost Proposal - Construction Project Supervisor
                                                                                    Estimated                                                  Travel Expenses                   Total Cost Per 
                                                Task                                 Hours      Hourly Rate Total Labor Costs    miles        $0.535         Meals    Lodging        Task
                   Start-up Meeting                                                    10                                $0.00                       $0.00                                 $0.00
                   Contract Time Determination                                         40                                $0.00                       $0.00                                 $0.00
                   Pre-bid Meeting and Preparation                                     16                                $0.00                       $0.00                                 $0.00
                   CPM Reviews                                                         100                               $0.00                       $0.00                                 $0.00
                   Site Visits (3/wk @ 8 hrs for 20 weeks)                             480                               $0.00                       $0.00                                 $0.00
                   Unscheduled Site Visits                                             54                                $0.00                       $0.00                                 $0.00
                   Documentation, daily entries review                                 100                               $0.00                       $0.00                                 $0.00
                                                                                                                         $0.00                       $0.00                                 $0.00
                                                                         Subtotal      800                               $0.00     0                 $0.00   $0.00     $0.00               $0.00
                   RFP Cost Proposal - Hourly Rate Calculation
                                                                                  Basic Labor    Overhead                           Total Labor Rate
                                                Task                                  Rate          160.00% Fixed Fee 10%
                   Project Manager
                                                                                      0.00         $0.00           $0.00                  $0.00
                                                                                                   $0.00           $0.00                  $0.00
                   Construction Project Supervisor
                                                                                                   $0.00           $0.00                  $0.00
                                                                                                   $0.00           $0.00                  $0.00
                   RFP Cost Proposal - Total Sample Project Costs
                                                Task                                  Total Labor Costs         Total Travel Expenses             Total Cost
                   Project Manager
                                                                                                                                                    $0.00
                                                                                                                                                    $0.00
                   Construction Project Supervisor
                                                                                                                                                    $0.00
                                                                                                                                                    $0.00
                                                                         Subtotal           $0.00                      $0.00                       $0.00
The words contained in this file might help you see if this file matches what you are looking for:

...Rfp cost proposal template sample project fill in blue shaded areas the remainder should populate on its own note you are not required to use this spreadsheet for your however submittal must contain all tasks and hours as shown below location th from mile west of jct miles both directions description unbonded concrete overlay culvert lining bituminous surfacing identification manager construction supervisor letting date november limits due two years before dates may through september scope work contractor will provide following state accordance with exhibit b indicated schedule coordinate district central office functional groups local governments identify potential items determine budget purposes developing a contract bid assume that item one above led determination remove existing passrac up grade raise top inside shoulder x lanes outside reclaim shoulders add gravel paving bit wide ramps area tie at ramp terminal widen truck parking reconstruct roadway under overpasses ins each end ...

no reviews yet
Please Login to review.