jagomart
digital resources
picture1_Report Excel Template 40213 | Trans Bid Item List


 238x       Filetype XLSX       File size 0.04 MB       Source: www.alberta.ca


File: Report Excel Template 40213 | Trans Bid Item List
search bid items robert quinton 20oct2016 0746 search bid items number of results found 764 report parameters bid item classconstruction bid item category any bid item code bid item description ...

icon picture XLSX Filetype Excel XLSX | Posted on 14 Aug 2022 | 3 years ago
Partial file snippet.
                                                                                      Search Bid Items                                                                    Robert Quinton
                                                                                                                                                                       20-Oct-2016 07:46
     Search Bid Items
     Number of results found: 764
     Report Parameters
                         Bid Item ClassConstruction
                      Bid Item Category-- Any --
                          Bid Item Code
                    Bid Item Description
                  Standard Spec Manual-- Any --
            Standard Spec Manual Edition-- Any --
           Standard Spec Manual Section-- Any --
                                ActiveYes
     Bid Item                         Description                                             Standard Spec Section                                  Aggregate        Unit Of Measure
     A001                             Pit Reclamation                                                                                                                 lump sum
     A018                             Misc. Agg. Production                                                                                                           lump sum
     A026                             Misc. Agg. Production                                                                                                           cubic metre
     A028                             Haul of Misc. Agg. Production                                                                                                   cubic metre
     A029                             Haul of Misc. Agg. Production                                                                                                   cubic metre 
                                                                                                                                                                      kilometre
     A040                             Misc. Agg. Production                                                                                                           tonne
     A048                             Haul of Misc. Agg. Production                                                                                                   tonne
     A049                             Haul of Misc. Agg. Production                                                                                                   tonne.kilometre
     A050                             Supply of Aggregate - With Option                       HCS - 5.2.5                                                             cubic metre
     A051                             Supply of Aggregate - No Option                         HCS - 5.2.5                                                             cubic metre
     A345                             Crush to Stockpile                                      HCS - 3.2.4                                                             tonne
     A498                             Haul Crushed Gravel to Stockpile                                                                                                tonne
     A499                             Haul Crushed Gravel to Stockpile                                                                                                tonne.kilometre
     A500                             Crush to Stockpile                                      HCS - 3.2.4                                                             cubic metre
     A501                             Crush, Haul and Stockpile Gravel                        HCS - 3.2.4                                                             cubic metre
     A598                             Haul Crushed Gravel to Stockpile                                                                                                cubic metre
     A599                             Haul Crushed Gravel to Stockpile                                                                                                cubic metre 
                                                                                                                                                                      kilometre
     A800                             Supply of Aggregate - With Option                       HCS - 5.2.5                                                             tonne
     A805                             Supply of Aggregate - No Option                         HCS - 5.2.5                                                             tonne
     B018                             Misc. Base Course Work                                                                                                          lump sum
     B020                             Misc. Base Course Work                                                                                                          kilometre
     B022                             Misc. Base Course Work                                                                                                          square metre
     B026                             Misc. Base Course Work                                                                                                          cubic metre
     B028                             Haul of Misc. Base Course Work                                                                                                  cubic metre
     B029                             Haul of Misc. Base Course Work                                                                                                  cubic metre 
                                                                                                                                                                      kilometre
     B040                             Misc. Base Course Work                                                                                                          tonne
     Source: PMA Delivery                                                                                                                                                   Page 1 of 20
                                                                                      Search Bid Items                                                                    Robert Quinton
                                                                                                                                                                       20-Oct-2016 07:46
     Bid Item                         Description                                             Standard Spec Section                                  Aggregate        Unit Of Measure
     B048                             Haul of Misc. Base Course Work                                                                                                  tonne
     B049                             Haul of Misc. Base Course Work                                                                                                  tonne.kilometre
     B100                             Subgrade Excavation                                     HCS - 3.1.3                                                             cubic metre
     B152                             Granular Fill                                           HCS - 3.8.5, 5.2.5                                     6-80             tonne
     B153                             Granular Fill                                           HCS - 3.8.5, 5.2.5                                     2-25             tonne
     B154                             Granular Fill (Pit-Run)                                 HCS - 3.8.5, 5.2.5                                                      tonne
     B155                             Granular Fill                                           HCS - 3.8.5, 5.2.5                                     6-125            tonne
     B172                             Granular Fill                                           HCS - 3.8.5, 5.2.5                                     6-80             cubic metre
     B173                             Granular Fill                                           HCS - 3.8.5, 5.2.5                                     2-25             cubic metre
     B174                             Granular Fill (Pit-Run)                                 HCS - 3.8.5, 5.2.5                                                      cubic metre
     B175                             Granular Fill                                           HCS - 3.8.5, 5.2.5                                     6-125            cubic metre
     B180                             Preparing Subgrade Surface (First Layer)                HCS - 3.1.3                                                             square metre
     B181                             Preparing Subgrade Surface (Second Layer)               HCS - 3.1.3                                                             square metre
     B185                             Preparing Granular Surface                                                                                                      square metre
     B280                             Granular Base Course                                    HCS - 3.6.8, 5.2.5                                     2-16             tonne
     B281                             Granular Base Course                                    HCS - 3.6.8, 5.2.5                                     2-20             tonne
     B282                             Granular Base Course                                    HCS - 3.6.8, 5.2.5                                     2-25             tonne
     B283                             Granular Base Course                                    HCS - 3.6.8, 5.2.5                                     2-40             tonne
     B315                             Cement Stabilized Base Course                           HCS - 3.9.5                                            7-40             tonne
     B320                             Portland Cement                                         HCS - 3.9.5, 5.11.3                                    7-40             tonne
     C002                             Unforseen Work                                                                                                                  Allowance
     C003                             Miscellaneous Work or Materials                                                                                                 lump sum
     C004                             Miscellaneous Work or Materials                                                                                                 cubic metre
     C005                             Miscellaneous Work or Materials                                                                                                 hectare
     C006                             Miscellaneous Work or Materials                                                                                                 kilogram
     C007                             Miscellaneous Work or Materials                                                                                                 metre
     C008                             Miscellaneous Work or Materials                                                                                                 square metre
     C009                             Miscellaneous Work or Materials                                                                                                 tonne
     C010                             Miscellaneous Work or Materials                                                                                                 unit
     C011                             Miscellaneous Work or Materials                                                                                                 application
     C012                             Miscellaneous Work or Materials                                                                                                 each
     C013                             Miscellaneous Work or Materials                                                                                                 group
     C014                             OverHaul                                                                                                                        cubic metre 
                                                                                                                                                                      kilometre
     C015                             Overhaul of Wet Excavation - Type 1                                                                                             cubic metre 
                                                                                                                                                                      kilometre
     C016                             Overhaul of Wet Excavation - Type 2                                                                                             cubic metre 
                                                                                                                                                                      kilometre
     C020                             Mobilization and Demobilization                                                                                                 lump sum
     C021                             Miscellaneous Work or Materials                                                                                                 cubic centimetres
     C025                             Care of Water                                                                                                                   lump sum
     C030                             Existing and Temporary Roads                                                                                                    lump sum
     Source: PMA Delivery                                                                                                                                                   Page 2 of 20
                                                                                      Search Bid Items                                                                    Robert Quinton
                                                                                                                                                                       20-Oct-2016 07:46
     Bid Item                         Description                                             Standard Spec Section                                  Aggregate        Unit Of Measure
     C050                             Site Clearing and Grubbing                                                                                                      square metre
     C051                             Site Clearing and Grubbing                                                                                                      hectare
     C055                             Topsoil and Subsoil Stripping                                                                                                   cubic metre
     C056                             Topsoil and Subsoil Placement                                                                                                   cubic metre
     C057                             Imported Topsoil Placement                                                                                                      cubic metre
     C060                             Common Excavation                                                                                                               cubic metre
     C062                             Borrow Area Excavation                                                                                                          cubic metre
     C063                             Wet Excavation - Type 1                                                                                                         cubic metre
     C064                             Wet Excavation - Type 2                                                                                                         cubic metre
     C065                             Impervious Fill Zone 1A                                                                                                         cubic metre
     C069                             Random Fill Zone 2A                                                                                                             cubic metre
     C070                             Random Fill Zone 2B                                                                                                             cubic metre
     C080                             Road Gravel Zone 4B                                                                                                             cubic metre
     C090                             Pitrun Gravel Zone 4C                                                                                                           cubic metre
     C091                             Pitrun Gravel Zone 4C                                                                                                           tonne
     C100                             Riprap Bedding Gravel Zone 5A                                                                                                   cubic metre
     C102                             Coarse Rip-rap Bedding Zone 5B                                                                                                  cubic metre
     C105                             Gravel Armour Zone 5C                                                                                                           cubic metre
     C106                             Gravel Armour Zone 5C                                                                                                           tonne
     C110                             Riprap Zone 6A                                                                                                                  cubic metre
     C120                             Riprap Zone 6B                                                                                                                  cubic metre
     C130                             Riprap Zone 6B                                                                                                                  cubic metre
     C140                             Riprap Zone 6C                                                                                                                  cubic metre
     C143                             Salvage and Reinstall Existing Riprap                                                                                           cubic metre
     C145                             Impervious Fill Zone 1A                                                                                                         cubic metre
     C150                             Fine Filter Zone 3A                                                                                                             cubic metre
     C160                             Coarse Filter Zone 3B                                                                                                           cubic metre
     C169                             Bedding Gravel Zone 5A                                                                                                          cubic metre
     C170                             Bedding Gravel - Zone 5B                                                                                                        cubic metre
     C200                             Geotextile                                                                                                                      square metre
     C225                             Erosion Control Blanket                                                                                                         square metre
     C230                             Drill Seeding                                                                                                                   square metre
     C232                             Hydroseeding                                                                                                                    square metre
     C248                             Temporary Fencing                                                                                                               metre
     C250                             Barbed Wire Fence                                                                                                               metre
     C254                             Barbed Wire Fencing and Gates                                                                                                   metre
     C255                             Steel Fence Gates                                                                                                               each
     C260                             Texas Gates                                                                                                                     each
     C265                             Vehicle Access Control Gate                                                                                                     each
     C280                             Guardrail                                                                                                                       metre
     Source: PMA Delivery                                                                                                                                                   Page 3 of 20
                                                                                                        Search Bid Items                                                                                    Robert Quinton
                                                                                                                                                                                                         20-Oct-2016 07:46
      Bid Item                                Description                                                       Standard Spec Section                                              Aggregate           Unit Of Measure
      C300                                    Subsurface Drainage System                                                                                                                               metre
      C325                                    Watering                                                                                                                                                 application
      D018                                    Misc. Drainage Work                                                                                                                                      lump sum
      D020                                    Misc. Drainage Work                                                                                                                                      metre
      D021                                    Misc. Drainage Work                                                                                                                                      unit
      D022                                    Misc. Drainage Work                                                                                                                                      square metre
      D023                                    Misc. Drainage Work                                                                                                                                      inlet
      D026                                    Misc. Drainage Material                                                                                                                                  cubic metre
      D028                                    Haul of Misc. Drainage Material                                                                                                                          cubic metre
      D029                                    Haul of Misc. Drainage Material                                                                                                                          cubic metre 
                                                                                                                                                                                                       kilometre
      D040                                    Misc. Drainage Material                                                                                                                                  tonne
      D041                                    Misc. Drainage Material                                                                                                                                  metre
      D042                                    Misc. Drainage Material                                                                                                                                  square metre
      D048                                    Haul of Misc. Drainage Material                                                                                                                          tonne
      D049                                    Haul of Misc. Drainage Material                                                                                                                          tonne.kilometre
      D052                                    Misc. Drainage Material                                                                                                                                  unit
      D100                                    Culverts  - Remove and Dispose (C.S.P.) (up to 700 mm dia.)       HCS - 2.4.4                                                                            metre
      D105                                    Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.)         HCS - 2.4.4                                                                            metre
      D110                                    Culverts - Remove and Dispose                                     HCS - 2.4.4                                                                            metre
      D120                                    Culverts - Remove, Salvage and Re-Install  (C.S.P.) (up to 700 mm  HCS - 2.4.4                                                                           metre
                                              dia.)
      D125                                    Culverts - Remove, Salvage and Re-Install  (C.S.P.) (over 700 mm  HCS - 2.4.4                                                                            metre
                                              dia.)
      D130                                    Culverts - Remove, Salvage and Re-Install                         HCS - 2.4.4                                                                            metre
      D135                                    Culverts - Remove and Salvage up to 700 mm dia.                                                                                                          metre
      D140                                    Culverts - Remove and Salvage over 700 mm dia.                                                                                                           metre
      D200                                    Granular Backfill - Culverts                                      HCS - 5.2.5, 2.4.4                                                                     cubic metre
      D235                                    Granular Backfill - Culverts                                      HCS - 5.2.5, 2.4.4                                                                     tonne
      D26                                     Smooth Wall Steel Pipe - Supply and Install (    mm dia.)         HCS - 5.22.4                                                                           metre
      D326                                    Culverts - Supply and Install (up to 700 mm dia. R.G.R.C.P.)      HCS - 5.16.4, 2.4.4                                                                    metre
      D327                                    Culverts - Supply and Install (over 700 mm dia. R.G.R.C.P.)       HCS - 5.16.4, 2.4.4                                                                    metre
      D400                                    Culverts - Supply and Install (400 mm dia. C.S.P.)                HCS - 5.23.4, 2.4.4                                                                    metre
      D405                                    Culverts - Supply and Install (500 mm dia. C.S.P.)                HCS - 5.23.4, 2.4.4                                                                    metre
      D410                                    Culverts - Supply and Install (600 mm dia. C.S.P.)                HCS - 5.23.4, 2.4.4                                                                    metre
      D415                                    Culverts - Supply and Install (700 mm dia. C.S.P.)                HCS - 5.23.4, 2.4.4                                                                    metre
      D420                                    Culverts - Supply and Install                                     HCS - 5.23.4, 2.4.4                                                                    metre
      D425                                    Culverts - Supply and Install (800 mm dia. C.S.P.)                HCS - 5.23.4, 2.4.4                                                                    metre
      D430                                    Culverts - Supply and Install (900 mm dia. C.S.P.)                HCS - 5.23.4, 2.4.4                                                                    metre
      D431                                    Culverts - Supply and Install (1 000 mm dia. C.S.P.)              HCS - 5.23.4, 2.4.4                                                                    metre
      D435                                    Culverts - Supply and Install (1 200 mm dia. C.S.P.)              HCS - 5.23.4, 2.4.4                                                                    metre
      D437                                    Culverts - Supply and Install (1 400 mm dia. C.S.P.)              HCS - 5.23.4, 2.4.4                                                                    metre
      Source: PMA Delivery                                                                                                                                                                                     Page 4 of 20
The words contained in this file might help you see if this file matches what you are looking for:

...Search bid items robert quinton oct number of results found report parameters item classconstruction category any code description standard spec manual edition section activeyes aggregate unit measure a pit reclamation lump sum misc agg production cubic metre haul kilometre tonne tonnekilometre supply with option hcs no crush to stockpile crushed gravel and b base course work square source pma delivery page subgrade excavation granular fill pitrun preparing surface first layer second...

no reviews yet
Please Login to review.