225x Filetype XLSX File size 0.02 MB Source: wsdot.wa.gov
Sheet 1: LSTC Worksheet
Washington State Department of Transportation | ||||||||||
Lump Sum Traffic Control Risk Assessment | ||||||||||
Project Title: | ||||||||||
CN Cost Est: | ||||||||||
SR | Begin MP | End MP | Length: | 0 | miles | |||||
SR | Begin MP | End MP | Length: | 0 | miles | |||||
SR | Begin MP | End MP | Length: | 0 | miles | |||||
Brief Project Description: | ||||||||||
<Insert Text> | ||||||||||
Considerations | ||||||||||
Risk Rating | Explanation For Rating and Mitigation Measures Implemented | |||||||||
1 | Contract Duration and Schedule | |||||||||
1a | Contract Duration | Provide an explanation for rating and any mitigation measures | ||||||||
1b | Contract Schedule | Provide an explanation for rating and any mitigation measures | ||||||||
2 | Construction stages | |||||||||
2a | Number of construction stages | Provide an explanation for rating and any mitigation measures | ||||||||
3 | Traffic Control Needs | |||||||||
3a | Intersection Closures | Provide an explanation for rating and any mitigation measures | ||||||||
3b | Interchange Closures | Provide an explanation for rating and any mitigation measures | ||||||||
3c | Rolling Slowdowns | Provide an explanation for rating and any mitigation measures | ||||||||
3d | Mainline Closures | Provide an explanation for rating and any mitigation measures | ||||||||
3e | Other High Impact Closures | Provide an explanation for rating and any mitigation measures | ||||||||
3f | Closure Approval By Others | Provide an explanation for rating and any mitigation measures | ||||||||
3g | Transit Impacts | Provide an explanation for rating and any mitigation measures | ||||||||
3h | Pedestrian Route Closures | Provide an explanation for rating and any mitigation measures | ||||||||
3i | Bicycle Route Closures | Provide an explanation for rating and any mitigation measures | ||||||||
3j | Traffic Control Provided for Others | Provide an explanation for rating and any mitigation measures | ||||||||
3k | Multiple Shifts (day & night) | Provide an explanation for rating and any mitigation measures | ||||||||
3l | Roadway Detours | Provide an explanation for rating and any mitigation measures | ||||||||
4 | Traffic Control Plans | |||||||||
4a | Is the contract missing traffic control plans? | Provide an explanation for rating and any mitigation measures | ||||||||
4b | Does the contract have significant number of TC plan | Provide an explanation for rating and any mitigation measures | ||||||||
0 | ||||||||||
Design-Bid-Build Traffic Control Risk Level | ||||||||||
Score | Level | Candidate for LS Traffic Control | ||||||||
0 to 35 | Low | Good candidate for LSTC | ||||||||
35 to 70 | Medium | Consider LSTC w/ minor mitigation | ||||||||
70 to 105 | High | Bid items or LSTC w/ mitigation | ||||||||
105 or greater | Very High | Not a good candidate for LSTC |