368x Filetype XLSX File size 0.10 MB Source: living-future.org
Sheet 1: Instructions
| MATERIALS TRACKING TABLE | |
| Living Building Challenge 3.0 | |
| This Tracking Tool is for LBC 3.0 Project Teams to track Materials information for four Imperatives (I-10, I-12, I- 13, and CDPH information for I-08). Supplemental documentation is also required. See the 3.0 Documentation Requirements for full information. This Tracking Table should be provided as part of Audit Documentation in sortable Excel format. | |
| Instructions: | |
| Fill in CSI and General Product Information for every material in the project. | |
| Fill in the Imperative information as applicable. For example I-10 Red List applies to all materials, and all materials costs must be included in the Materials Construction Budget (see note below). Distance information is not required for all products. | |
| For I-12 & I-13, Teams must say "Yes" to double or track costs. Blank cells are treated as "No", therefore the use of "No" is up to the discretion of the team. | |
| Rows may be added through the "insert" function. Row contents &/or formulas can be "pulled down" using the "+" that appears in the right lower corner of selected cells. | |
| Column Specific Notes: | |
| Column | Notes |
| Red List Free | Project team must fill in "Yes" or "No" for each product. |
| Exception No. | An Exception Number should be provided for all products with "No" under "Red List Free?" |
| Wood Product? | None |
| COC No. | None |
| Declare Product? | None |
| Declare Information Sent | Declare information must be sent to at least 10 manufacturers not currently in Declare. |
| Salvaged Product? | None |
| Include Double Salvaged/Declared Value in I-13? | Doubling the materials value of salvaged or Declare products is up to the project team, on a product by product basis. |
| Actual Material Cost (=> Materials Construction Budget) |
Actual cost. Do not adjust cost based on product type. All material costs must be included. Materials that are not tracked for I-13 may be included as "grouped" costs within the column (i.e. framing package vs. 2x4s; sheathing; glulams), or within a "bulk" cost at the bottom (right before the MCB total), as long this is clearly explained or noted in comments. |
| Materials Subtotal | Includes any "doubled" materials costs. |
| Natural Material Construction?* | Natural Material Construction includes certain construction methods that are labor intensive and usually based on low cost, locally sourced materials (e.g. straw bale, cobb, rammed earth, etc). |
| Labor Cost | Only added to Materials + Labor subtotal if adjacent columns are both "Yes". |
| Include Labor Costs in I-13? | Including labor costs for Natural Material Construction is up to the project team, on a product by product basis |
| Materials + Labor Subtotal | Includes both "doubled" materials costs and applicable labor costs. |
| Track Product for I-13? |
Up to 25% of the total Materials Construction Budget may be excluded from tracking. |
| Manufacturer Location Information | See I-13 Changes in 3.0 in the 3.0 Materials Petal Handbook for when raw materials extraction is relevant. |
| Living Economy Sourcing (I-13) Total |
None |
| I-13 Living Economy Zone Calculations | None |
| Amount over/under Minimum Requirement. | Excess can be applied to Economy Zones further from project. Please clarify intentions in comments. |
| MATERIALS TRACKING TABLE | LEGEND | Minimum % of MCB required for Econ. Zone. | 20% | 30% | 25% | |||||||||||||||||||||||||||||
| Living Building Challenge 3.x Updated February 9, 2018 (see comment) |
Team to fill in | Estimated Minimum $ by Economy Zone | $200,000.00 | $300,000.00 | $250,000.00 | |||||||||||||||||||||||||||||
| Pull down menus | Declare Products | Salvaged Products | Actual Material Cost = Materials Const. Budget (MCB) |
Subtotals for Reference | Living Economy Sourcing (I-13) Total |
|||||||||||||||||||||||||||||
| Project Name | Select Project Area Units |
ESTIMATED Material Construction Budget (MCB): |
Key totals | Min. # Declare Products: | 0 | Min. # Required | 0 | Materials Subtotal | Labor Cost | Materials + Labor Subtotal | Actual Total by Economy Zone | $0.00 | $0.00 | $0.00 | ||||||||||||||||||||
| Formulas & sub-totals | # Installed | 0 | # Installed | 0 | Actual Minimum $ to Comply |
$0.00 | $0.00 | $0.00 | ||||||||||||||||||||||||||
| Project Area | $1,000,000.00 | Sample inputs | # Declare Advocay Sent | 0 | $0 | $0 | $0 | $0 | 0 | Amount Over/Under Minimum Requirement: | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||
| CSI Division | General Product Information | I-08 Healthy Air | I-10 Red List | I-12 Responsible Industry | I-13 Living Economy Sourcing (LES) | I-13 Living Economy Sourcing: Economy Zone Calculations | ||||||||||||||||||||||||||||
| Number | Name | Product Type | Product Manufacturer | Product Name | Primary Ingredients (2-3) |
Red List Free? | Exception No. | Wood Product? | COC No. | Extracted (Stone, Metal or Mineral) Product? | Declare Product? | Declare Information Sent? | Salvaged Product? | Include Double Salvaged/Declared Value in LES? | Actual Material Cost (=> Materials Construction Budget) |
Materials Subtotal | Natural Material Construction?* | Labor Cost | Include Labor Costs in I-13? | Materials + Labor Subtotal | Track Product for I-13? |
Living Economy Sourcing (I-13) Total |
Manufacturer Location (or Raw Materials Source Location when applicable) |
Totals by Economy Zone: | ||||||||||
| Manufacturer Contact information (optional) | CDPH Applies? | CDPH Compliant? | Wet Applied Product? | Meets SCAQMD 1168 or CARB 2007 SCM |
Manufacturer Name | Location (city, state/province, country) | Distance from Project Site (km) | 500 km (310 miles) |
1000 km (621 miles) |
5000 km (3107 miles) |
||||||||||||||||||||||||
| 00 00 00 | Sample Entry | Flooring | Acme Co | Eco-floor | Yes | Yes | Cork, binder | No | I10-E1 | Yes | 1168 | Yes | Yes | No | Yes | No | 3,475 | 3475 | Yes | 100 | Yes | 3575 | Yes | 3575 | Acme Co | City, State, USA | 25 | 3575 | ||||||
| 01 00 00 | General Requirements | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 02 00 00 | Existing Conditions | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 03 00 00 | Concrete | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 04 00 00 | Masonry | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 05 00 00 | Metals | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 06 00 00 | Wood, Plastics, and Composites | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 07 00 00 | Thermal and Moisture Protection | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 08 00 00 | Openings | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 09 00 00 | Finishes | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 10 00 00 | Specialties | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 11 00 00 | Equipment | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 12 00 00 | Furnishings | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 13 00 00 | Special Construction | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 14 00 00 | Conveying Equipment | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 21 00 00 | Fire Suppression | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 22 00 00 | Plumbing | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 23 00 00 | Heating, Ventilating, and Air-Conditioning (HVAC) | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 25 00 00 | Integrated Automation | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 26 00 00 | Electrical | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 27 00 00 | Communications | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 28 00 00 | Electronic Safety and Security | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 31 00 00 | Earthwork | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 32 00 00 | Exterior Improvements | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 33 00 00 | Utilities | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| 34 00 00 | Transportation | $0 | $0 | 0 | ||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| $0 | $0 | 0 | ||||||||||||||||||||||||||||||||
| DO NOT INSERT ROWS BELOW THIS LINE; Insert a "copied" row within the table boundary to preserve formulas/ formats. | "Bulk" costs not included individually above: | |||||||||||||||||||||||||||||||||
no reviews yet
Please Login to review.