picture1_Construction Template Excel 32955 | Qsm   S01 Site Duty And Responsibilities 05aug2013


 171x       Filetype XLSX       File size 0.17 MB       Source: www.mod.gov.bn


File: Construction Template Excel 32955 | Qsm S01 Site Duty And Responsibilities 05aug2013
sheet 1 flowchart101 no sheet 2 checklist101 project no standard check remarks a general 1 site supervisor present at the site throughout the construction period 2 site diary or logbook ...

icon picture XLSX Filetype Excel XLSX | Posted on 09 Aug 2022 | 3 years ago
Partial file snippet.
Sheet 1: Flowchart101

























































































No



































































Sheet 2: Checklist101












Project:














NO. STANDARD CHECK REMARKS
A GENERAL



1 Site Supervisor present at the site throughout the construction period



2 Site Diary or Logbook is kept for the project



B DUTIES AND RESPONSIBILITIES



1 Record site daily activities



2 Check and record deliveries of materials



3 Record daily weather condition



4 Update daily progress, number of workers on site



5 Record types of equipments and machineries



6 Ensure safety requirement is adhered to



7 Ensure proper material storage



8 Submit weekly Project Report, use Form 101



9 Submit weekly Main Contractor's Labour Return,
use Form 102




10 Submit Site Meeting Report, follow up matter/action discussed in meetings, use Form 103



C IMPORTANCE OF SITE SUPERVISION



1 To ensure main contractor complying with the contract/construction drawings, details and specifications



2 To ensure Quality Control and Assurance



3 To monitor progress



4 To ensure site problems is highlighted earlier & resolved timely



5 For accountability and traceability



















































































Name of SS: Name of OIC:
Checked & Signed: Reviewed Non-compliance: Verified & Signed: Reviewed Non-compliance:
Date: Date: Date: Date:

Sheet 3: Form101
Report No:______


Week ending:___________



















Project
Location
Vote No.
Architect
C&S Engineer
Q.S.
M&E Engineer
Main Contractor


Contract Start Date
Clerk of Works


Contract Completion Date
Site Tel.
Fax.
Progress against programme
Visitors to site Name Date
(including statutory inspectors)





GENERAL COMMENTS
Issued Site Memo No. Item Date















Delays
Defective Work
Drawings/ Information received on site
Drawings/ Information requested on site
Plant/ Materials delivered to site or removed
Health and safety matters
Lost Time Injury
Working conditions on site
PROGRESS TO DATE Item T C Item T C Item T C
Preliminaries

Plastering

Landscape





Piling/Foundation

Floor screeds

Road works

T= % Target


Excavation/Backfilling

Plumbing

Drainage works

C= % Completed


Concrete Structure

Electrical

Sewerage works





Steel Structure

Air-conditioning

Water works





Roof structure/cover

Fire Fighting System

Earthworks





External wall

Wall/ Floor tiles

Mains: Electrical





Internal wall/Partitions

Ceiling grid/ Tiles

Mains: Telecoms





Cladding/Curtain wall

Decoration

Mains: Gas





Windows - glazing

Lifts

Defects/Handover





Doors/Joinery

External works

Welding

GENERAL REPORT


Summary of work proceeding



Contractor's Daily weather report shall be attached.
Name & Signature of SS :
Date
Tick as appropriate Enclosures Copy to

Main Contractor's Labour Return
Officer In Charge (OIC)
M&E Engineer

Site Memo
Architect
QS

Weather Report
C&S Engineer

OIC comment
This form to be prepared by SS and submitted weekly to OIC.

























The words contained in this file might help you see if this file matches what you are looking for:

...Sheet flowchart no checklist project standard check remarks a general site supervisor present at the throughout construction period diary or logbook is kept for b duties and responsibilities record daily activities deliveries of materials weather condition update progress number workers on types equipments machineries ensure safety requirement adhered to proper material storage submit weekly report use form main contractor s labour return meeting follow up matteraction discussed in meetings c importance supervision complying with contractconstruction drawings details specifications quality control assurance monitor problems highlighted earlier amp resolved timely accountability traceability name ss oic checked signed reviewed noncompliance verified date week ending location vote architect engineer qs m e contract start clerk works completion tel fax against programme visitors including statutory inspectors comments issued memo item delays defective work information received requested p...