203x Filetype XLSX File size 0.04 MB Source: www.procurement.govt.nz
Procurement delivery model evaluation tool Project name Date Evaluation panel members Delivery model: Traditional Design and build Package based Direct managed Alliance Public private Early contractor Panel of suppliers Options evaluation criteria (and considerations) Criteria partnership involvement weight % Score Weighted Score Weighted Score Weighted Score Weighted Score Weighted Score Weighted Score Weighted Score Weighted score score score score score score score score Time: 0 0 0 0 0 0 0 0 Is early completion required? Certainty of time: 0 0 0 0 0 0 0 0 Is project completion on time critical to operations? Certain of cost: Is a firm price needed before any commitment to construction given?_x000D_ 0 0 0 0 0 0 0 0 Price competition: What is the relative importance of price versus quality in determining the degree of price 0 0 0 0 0 0 0 0 competition? Flexibility: Are variations necessary or possible after work has begun on-site? 0 0 0 0 0 0 0 0 Complexity: Does the building need to be highly specialised, technologically advanced or highly 0 0 0 0 0 0 0 0 serviced? Quality: Is high quality of the product, in terms of material and workmanship and design concept, 0 0 0 0 0 0 0 0 important?_x000D_ Responsibility: Is the client willing to take design risk, or does the single point of responsibility for design 0 0 0 0 0 0 0 0 and construction need to be with the contractor? Risk: What is the project risk profile, and how are these risks to be allocated and managed - 0 0 0 0 0 0 0 0 time, cost, quality, health and safety? 0% 0 0 0 0 0 0 0 0 1
no reviews yet
Please Login to review.