appendix 215 scope of work checklist citytown bedford contract no location fe everett turnpike assignment no bridge no bin project no 16100 consultant est constr cost 1045 million project managernancy ...

icon picture XLS Filetype Excel XLS | Posted on 08 Aug 2022 | 3 years ago
Partial file snippet.
                Appendix 2.1.5 - Scope of Work Checklist
                 City/Town         Bedford                                                                         Contract No.:
                 Location:         FE Everett Turnpike                                                         Assignment No.:
                 Bridge No.                                                     BIN:                                Project No.:          16100
                 Consultant:                                      Est. Constr. Cost: $10.45 Million
                                                                  Project Manager:Nancy Spaulding
                 PROJECT NARRATIVE
                 This project consists of implementing All Electronic Toll (AET) collection facility at the FE Everett Turnpike Toll Plaza in the Town of Bedford.  
                 The existing barrier tollbooth collection facility will be removed and roadway reconstructed to accommodate high speed AET toll collection 
                 operation.  The original facility was constructed in 1987, expanded in 2004 and again in 2012 with the Airport Access project.  
                 The project scope shall be developed in accordance with the NHDOT Design Manual to ensure the proposed scope of work is complete and appropriate
                 Preliminary and Final Design, as well as construction support services, contract for conversion of the existing Bedford Tolling facility to an All Electronic Tolling (AET) facility.
                 Preliminary design will consist of review of the ORT design that was brought to PS&E for vertical alignment, 3D model, drainage design and associated details for roadway 
                 construction.   The vertical alignment for the ORT will be refined to accommodate the removal of the existing tolling facility.  The Department will provide lane and ramp layouts 
                 with a conceptual estimate for the three lane in each direction configuration.
                 Final design is expected to include development of all aspects of conversion contract plans, including but not limited to, plans and associated details for roadway construction AET 
                 infrastructure and gantry design, drainage design, signing, construction sequencing with traffic management considerations.  The Tolling Vendor will be responsible for all tolling 
                 equipment installation and commissioning.  The successful consultant will be responsible for coordination efforts between Civil Contractor and Tolling Equipment installation.   The 
                 contract plans will include complete toll plaza demolition plans for existing concrete barriers, tunnel decommissioning and administration building demolition.
                 The Department will develop the environmental study with the support of a statewide on-call environmental services consultant.  Environmental services specific to the project to 
                 be completed by the selected consultant will include the development of a wetland permit application package including associated wetland plans and other resource delineation 
                 as necessary.  There are no requirements for a Noise Analysis or Air Quality Analysis.  The consultant is responsible for  a Hazardous Waste Assesment  for PFAS and LRS.  
                 Preparation of Soil and Groundwater management plans are anticipated.  The consultant should be pre pared to submit an Erosion Control plan and MS4 Compliance 
                 documentation.  At this time the Department projects must comply with Alteration of Terrain rules, while a permit is not necessary, the consultant will be responsible for oversight 
                 for this compliance .
                 The Consultant will be required to assist the Department in the public outreach and public involvement process.
                 Geotechnical and Survey support will be the responsibility of the consultant.  The consultant will either have in-house support or have under agreement a sub-consultant for 
                 Geotech and Survey.   
                 This work will require Professional Engineer licensure in the State of New Hampshire.
                 Consultants submitting a Letter of Interest will be assessed on their capability to perform the above-mentioned services, other related project experiences with project references 
                 noted, and their current workload with the Department.  
                 The compensation format for this agreement will be cost plus fixed fee and have a duration of approximately 18 months.
                 The project has a target advertising date and construction funding availability in Fiscal Year 2023 in the current 2021-2030 Ten Year Transportation Improvement Plan.
                  
                       
                                 WORK ITEM                                     DESCRIPTION                                     STATUS
                                                               Describes existing conditions, evaluates 
                 Design Report                                 alternatives, and recommends proposed 
                                                               geometrics.
                                                               Describes reasons for requesting a design 
                 Design Exceptions                             exception and forms the basis for a Design                  None Anticipated
                                                               Exception Report.
                      Bridge          Appr. Width Rail to Rail   Curb to Curb Width  Span Configuration                           N/A
                             Exist: None
                         Proposed: None                        Refer to detailed Bridge Scope
                 Typical Cross Section                         a) Mainline                                         12' lanes with 12' inner &10' outer shoulders
                                                               b) Side Streets                                                    N/A
                 Design Speed                                                                                                  70 MPH
                                                               a) Mainline
                                                               b) Side Streets                                                    N/A
                                                               a) Mainline                                                  approx. 10,750'
                 Project Lengths                               b) Ramps                                                 connection with existing 
                                                               c) Side Streets                                                    N/A
                                                                                       Page 1                                                     ScopeofServices Draft.xls
                 Project Phases
               Appendix 2.1.5 - Scope of Work Checklist
                City/Town        Bedford                                                                    Contract No.:
                Location:        FE Everett Turnpike                                                     Assignment No.:
                Bridge No.                                                 BIN:                               Project No.:        16100
                Consultant:                                   Est. Constr. Cost: $10.45 Million
                                                              Project Manager:Nancy Spaulding
                                                           a) Pre-Preliminary                                              No
                                                           b) Preliminary (abbreviated)                                   Yes
                Project Phases                             c) Slope and Drain                                             Yes
                                                           d) PPS&E                                                       Yes
                                                           e) PS&E                                                        Yes
                                                           f) Contract Plans                                              Yes
                                                                                  Page 2                                                  ScopeofServices Draft.xls
               Appendix 2.1.5 - Scope of Work Checklist
                City/Town        Bedford                                                                    Contract No.:
                Location:        FE Everett Turnpike                                                     Assignment No.:
                Bridge No.                                                 BIN:                               Project No.:        16100
                Consultant:                                   Est. Constr. Cost: $10.45 Million
                                                              Project Manager:Nancy Spaulding
                               WORK ITEM                                   DESCRIPTION                                  STATUS
                                                           a) Manage Bureaus                                               no
                                                           b) Conduct Meetings                                            yes
                Project Management and Miscellaneous       c) Special Provisions                                          yes
                                                           d) Estimates                                                   yes
                                                           e) Prepare Bid Documents                                       yes
                                                           a) Data Collection                                             yes
                Survey                                     b) Base Plan Preparation                                       yes
                                                           c) Survey Updates                                              yes
                                                           a) Boring Location Plan                                        yes
                                                           b) Take Borings                                                yes
                Geotechnical                               c) Test Pits                                              yes if necessary
                                                           d) Geotechnical Report                                         yes
                                                           e) Boring Logs and Plans                                       yes
                                                           f) Pavement/Subbase Recommendations                             no
                                                           a) Open Drainage System                                        yes
                                                           b) Closed Drainage System                                      yes
                                                           c) Temporary Drainage                                           no
                Drainage                                   d) Underdrain                                                   no
                                                           e) Pollutant Loading Calculations                            possibly
                                                           f) Major Culverts                                            possibly
                Hydraulics                                 Hydraulics Report                                              yes
                Landscaping                                a) Landscaping Plans                                            no
                                                           a) Traffic Counts                                               no
                                                           b) TMP/Detour                                                  yes
                Traffic                                    c) Safety Analysis                                              no
                                                           d) Signals                                                      no
                                                           e) Signs/Supports                                              yes
                                                           f)  Markings                                                   yes
                                                           a) Takings                                                not anticipated
                ROW                                        b) Easements                                              not anticipated
                                                           c) Demolitions                                                 yes
                                                           d) Plans                                                  not anticipated
                                                           a) Electric                                                    yes
                                                           b) Telephone                                                   yes
                                                           c) Gas                                                         yes
                                                           d) Water                                                       yes
                Utilities                                  e) Sewer                                                       yes
                                                           f) Cable                                                       yes
                                                           g) Fire Alarm                                                  yes
                                                           h) Street Lighting                                              no
                                                           i) Railroad Coordination                                        no
                                                                                  Page 3                                                  ScopeofServices Draft.xls
               Appendix 2.1.5 - Scope of Work Checklist
                City/Town        Bedford                                                                    Contract No.:
                Location:        FE Everett Turnpike                                                     Assignment No.:
                Bridge No.                                                 BIN:                               Project No.:        16100
                Consultant:                                   Est. Constr. Cost: $10.45 Million
                                                              Project Manager:Nancy Spaulding
                               WORK ITEM                                   DESCRIPTION                                  STATUS
                                                           a) Environmental Document (CE, EA, or EIS)                   no (BOE)
                                                           b) Wetland Delineation                                         yes
                                                           c) Noise Analysis                                               no
                                                           d) Air Quality Analysis                                         no
                                                           e) Hazardous Waste Assessment                                  yes
                Environmental                              f) Historical                                                   no
                                                           g) Archeological                                                no
                                                           h) COE 404 Permit                                               no
                                                           i) NHDES Alteration of Terrain Permit                          yes
                                                           j) NHDES Shoreland Protection Permit                            no
                                                           k) Erosion Control Plan                                        yes
                                                           l) MS4 Compliance documentation/memo                           yes
                                                           a) Public Hearing                                               no
                                                           b) Presentation Plans                                          yes
                                                           c) Presentation Documents                                      yes
                Public Involvement                         d) Context Sensitive Solutions                                  no
                                                           e) Steering Committee                                           no
                                                           f) Visualizations                                               no
                                                           g) Web Site Creation/Maintenance                               yes
                                                           a) Pre-Construction                                           limited
                                                           b) Advice                                                     limited
                Construction Phase                         c) Shop Drawings                                               yes
                                                           d) Signal Inspection                                           no 
                                                           e) Permit Plan                                                  no
                                                           f) Bridge Rating Report ("As Built" structure)                  no
                                                           g) Additional design                                            no
                                                                                  Page 4                                                  ScopeofServices Draft.xls
The words contained in this file might help you see if this file matches what you are looking for:

...Appendix scope of work checklist citytown bedford contract no location fe everett turnpike assignment bridge bin project consultant est constr cost million managernancy spaulding narrative this consists implementing all electronic toll aet collection facility at the plaza in town existing barrier tollbooth will be removed and roadway reconstructed to accommodate high speed operation original was constructed expanded again with airport access shall developed accordance nhdot design manual ensure proposed is complete appropriate preliminary final as well construction support services for conversion tolling an consist review ort that brought ps e vertical alignment d model drainage associated details refined removal department provide lane ramp layouts a conceptual estimate three each direction configuration expected include development aspects plans including but not limited infrastructure gantry signing sequencing traffic management considerations vendor responsible equipment installati...

no reviews yet
Please Login to review.