140x Filetype XLS File size 0.06 MB Source: www.nh.gov
Appendix 2.1.5 - Scope of Work Checklist City/Town Bedford Contract No.: Location: FE Everett Turnpike Assignment No.: Bridge No. BIN: Project No.: 16100 Consultant: Est. Constr. Cost: $10.45 Million Project Manager:Nancy Spaulding PROJECT NARRATIVE This project consists of implementing All Electronic Toll (AET) collection facility at the FE Everett Turnpike Toll Plaza in the Town of Bedford. The existing barrier tollbooth collection facility will be removed and roadway reconstructed to accommodate high speed AET toll collection operation. The original facility was constructed in 1987, expanded in 2004 and again in 2012 with the Airport Access project. The project scope shall be developed in accordance with the NHDOT Design Manual to ensure the proposed scope of work is complete and appropriate Preliminary and Final Design, as well as construction support services, contract for conversion of the existing Bedford Tolling facility to an All Electronic Tolling (AET) facility. Preliminary design will consist of review of the ORT design that was brought to PS&E for vertical alignment, 3D model, drainage design and associated details for roadway construction. The vertical alignment for the ORT will be refined to accommodate the removal of the existing tolling facility. The Department will provide lane and ramp layouts with a conceptual estimate for the three lane in each direction configuration. Final design is expected to include development of all aspects of conversion contract plans, including but not limited to, plans and associated details for roadway construction AET infrastructure and gantry design, drainage design, signing, construction sequencing with traffic management considerations. The Tolling Vendor will be responsible for all tolling equipment installation and commissioning. The successful consultant will be responsible for coordination efforts between Civil Contractor and Tolling Equipment installation. The contract plans will include complete toll plaza demolition plans for existing concrete barriers, tunnel decommissioning and administration building demolition. The Department will develop the environmental study with the support of a statewide on-call environmental services consultant. Environmental services specific to the project to be completed by the selected consultant will include the development of a wetland permit application package including associated wetland plans and other resource delineation as necessary. There are no requirements for a Noise Analysis or Air Quality Analysis. The consultant is responsible for a Hazardous Waste Assesment for PFAS and LRS. Preparation of Soil and Groundwater management plans are anticipated. The consultant should be pre pared to submit an Erosion Control plan and MS4 Compliance documentation. At this time the Department projects must comply with Alteration of Terrain rules, while a permit is not necessary, the consultant will be responsible for oversight for this compliance . The Consultant will be required to assist the Department in the public outreach and public involvement process. Geotechnical and Survey support will be the responsibility of the consultant. The consultant will either have in-house support or have under agreement a sub-consultant for Geotech and Survey. This work will require Professional Engineer licensure in the State of New Hampshire. Consultants submitting a Letter of Interest will be assessed on their capability to perform the above-mentioned services, other related project experiences with project references noted, and their current workload with the Department. The compensation format for this agreement will be cost plus fixed fee and have a duration of approximately 18 months. The project has a target advertising date and construction funding availability in Fiscal Year 2023 in the current 2021-2030 Ten Year Transportation Improvement Plan. WORK ITEM DESCRIPTION STATUS Describes existing conditions, evaluates Design Report alternatives, and recommends proposed geometrics. Describes reasons for requesting a design Design Exceptions exception and forms the basis for a Design None Anticipated Exception Report. Bridge Appr. Width Rail to Rail Curb to Curb Width Span Configuration N/A Exist: None Proposed: None Refer to detailed Bridge Scope Typical Cross Section a) Mainline 12' lanes with 12' inner &10' outer shoulders b) Side Streets N/A Design Speed 70 MPH a) Mainline b) Side Streets N/A a) Mainline approx. 10,750' Project Lengths b) Ramps connection with existing c) Side Streets N/A Page 1 ScopeofServices Draft.xls Project Phases Appendix 2.1.5 - Scope of Work Checklist City/Town Bedford Contract No.: Location: FE Everett Turnpike Assignment No.: Bridge No. BIN: Project No.: 16100 Consultant: Est. Constr. Cost: $10.45 Million Project Manager:Nancy Spaulding a) Pre-Preliminary No b) Preliminary (abbreviated) Yes Project Phases c) Slope and Drain Yes d) PPS&E Yes e) PS&E Yes f) Contract Plans Yes Page 2 ScopeofServices Draft.xls Appendix 2.1.5 - Scope of Work Checklist City/Town Bedford Contract No.: Location: FE Everett Turnpike Assignment No.: Bridge No. BIN: Project No.: 16100 Consultant: Est. Constr. Cost: $10.45 Million Project Manager:Nancy Spaulding WORK ITEM DESCRIPTION STATUS a) Manage Bureaus no b) Conduct Meetings yes Project Management and Miscellaneous c) Special Provisions yes d) Estimates yes e) Prepare Bid Documents yes a) Data Collection yes Survey b) Base Plan Preparation yes c) Survey Updates yes a) Boring Location Plan yes b) Take Borings yes Geotechnical c) Test Pits yes if necessary d) Geotechnical Report yes e) Boring Logs and Plans yes f) Pavement/Subbase Recommendations no a) Open Drainage System yes b) Closed Drainage System yes c) Temporary Drainage no Drainage d) Underdrain no e) Pollutant Loading Calculations possibly f) Major Culverts possibly Hydraulics Hydraulics Report yes Landscaping a) Landscaping Plans no a) Traffic Counts no b) TMP/Detour yes Traffic c) Safety Analysis no d) Signals no e) Signs/Supports yes f) Markings yes a) Takings not anticipated ROW b) Easements not anticipated c) Demolitions yes d) Plans not anticipated a) Electric yes b) Telephone yes c) Gas yes d) Water yes Utilities e) Sewer yes f) Cable yes g) Fire Alarm yes h) Street Lighting no i) Railroad Coordination no Page 3 ScopeofServices Draft.xls Appendix 2.1.5 - Scope of Work Checklist City/Town Bedford Contract No.: Location: FE Everett Turnpike Assignment No.: Bridge No. BIN: Project No.: 16100 Consultant: Est. Constr. Cost: $10.45 Million Project Manager:Nancy Spaulding WORK ITEM DESCRIPTION STATUS a) Environmental Document (CE, EA, or EIS) no (BOE) b) Wetland Delineation yes c) Noise Analysis no d) Air Quality Analysis no e) Hazardous Waste Assessment yes Environmental f) Historical no g) Archeological no h) COE 404 Permit no i) NHDES Alteration of Terrain Permit yes j) NHDES Shoreland Protection Permit no k) Erosion Control Plan yes l) MS4 Compliance documentation/memo yes a) Public Hearing no b) Presentation Plans yes c) Presentation Documents yes Public Involvement d) Context Sensitive Solutions no e) Steering Committee no f) Visualizations no g) Web Site Creation/Maintenance yes a) Pre-Construction limited b) Advice limited Construction Phase c) Shop Drawings yes d) Signal Inspection no e) Permit Plan no f) Bridge Rating Report ("As Built" structure) no g) Additional design no Page 4 ScopeofServices Draft.xls
no reviews yet
Please Login to review.