proposal contract no project no change request no contractor s change order proposal contractor name date address allowance telephone no change order section a contractor work dasny revisions 1 total contractor  ...

icon picture XLS Filetype Excel XLS | Posted on 08 Aug 2022 | 3 years ago
Partial file snippet.
Sheet 1: Instructions



Sheet 2: Contractor Proposal






Contract No.

Project No.

Change Request No.




CONTRACTOR'S CHANGE ORDER PROPOSAL


















Contractor Name:





Date:


Address:
















Allowance


Telephone No.:





Change Order

















SECTION A: CONTRACTOR WORK





DASNY REVISIONS


1. Total Contractor Labor (from Labor Worksheet)
$0.00



2. Total Contractor Material (from Material Worksheet)
$0.00



3. Total Contractor Equipment (from Equipment Expense Proposal) $0.00



4. Total Non-Specified Unit Price Costs (from Unit Price Worksheet) $0.00



5. SUBTOTAL (total lines 1 through 4)




$0.00



6. Premium Portion of Overtime (from Labor Worksheet) $0.00



7. Contractor's Markup Combined Overhead and Profit (20% of line 5) $0.00



8. CONTRACTOR TOTAL (Total lines 5, 6 and 7) $0.00
















SECTION B: SUBCONTRACTOR WORK (From Subcontractor's Proposal - Use a separate form for each Sub)


9. Names of Subcontractors: Base Cost Only (Line D3)
20% Markup (Line D4)




A.







B.







C.







D.






10. TOTAL SUBCONTRACTORS' PROPOSALS



$0.00
$0.00



11. Contractor's Markup on Subs' Cost (per DASNY General Conditions):




11a. 10% of first $10,000 of line 10 ($1,000 maximum) $0.00




11b. 5% of next $90,000 of line 10 ($4,500 maximum) $0.00




11c. 3% of sum in excess of $100,000 of line 10

$0.00



12. Subcontractors' Premium Portion of Overtime $0.00



13. SUBCONTRACTOR TOTAL


$0.00





























SECTION C: TOTAL CONTRACTED UNIT PRICE COSTS (from Unit Price Worksheet) 14. $0.00
















SECTION D: CONTRACTOR'S REQUESTED TOTAL

Round Totals to Nearest Dollar


15. AMOUNT REQUESTED



(Total lines 8,13, and 14.) $0.00












Signature of Contractor's Authorized Representative



Date















Print Name





Print name of Contact Person (if different)













Print Title





Phone No. (if different from above)


















SECTION E: CONSTRUCTION MANAGER'S REVIEW






I have reviewed the labor hours, material quantities and equipment and





no exceptions are taken to the Proposal.




see comments noted on proposal or below:

























By:







Construction Manager





Date

Phone No.















Credit Change Order Payment Lines Affected














Line Amount
Line Amount

Line Amount






























































Sheet 3: Labor Worksheet











Contract No.



Project No.



Change Request No.







CHANGE ORDER LABOR WORKSHEET
















Contractor Name:
Date:

Address:










Telephone No.:















STRAIGHT TIME LABOR AND PREMIUM PORTION OF OVERTIME (PPO)








DASNY USE ONLY
Work Description Trade Straight Time Hours Straight Time Rate Overtime Hours Overtime Rate Straight Time Cost PPO Cost DASNY Revisions






$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00







$0.00 $0.00


SUBTOTALS $0.00 $0.00


SUBTOTALS (FROM CONTINUATION WORKSHEET) $0.00 $0.00


TOTAL LABOR $0.00

Labor Worksheet (04/04)









The words contained in this file might help you see if this file matches what you are looking for:

...Sheet instructions contractor proposal contract no project change request s order name date address allowance telephone section a work dasny revisions total labor from worksheet material equipment expense nonspecified unit price costs subtotal lines through premium portion of overtime markup combined overhead and profit line b subcontractor use separate form for each sub names subcontractors base cost only d c proposals on subs per general conditions first maximum next sum in excess contracted requested round totals to nearest dollar amount signature authorized representative print contact person if different title phone above e construction manager review i have reviewed the hours quantities exceptions are taken see comments noted or below by credit payment affected straight time ppo description trade rate subtotals continuation...

no reviews yet
Please Login to review.