dhcd submission instructions for gb2 and gb3 the green communities criteria 2011 intended methods checklist gb2 must be completed and submitted with applications for funding for residential projects this checklist ...

icon picture XLS Filetype Excel XLS | Posted on 08 Aug 2022 | 3 years ago
Partial file snippet.
          DHCD Submission Instructions for GB-2 and GB-3:
          The Green Communities Criteria 2011 Intended Methods Checklist (GB-2) must be completed and submitted with applications for funding for residential 
          projects. This checklist will serve as the basis for the project’s pre-construction certification submission to Enterprise Community Partners.   As a preliminary 
          checklist at time of funding application, the checklist should be completed to the best of the project team’s ability, with all mandatory criteria and the 
          required number of optional criteria documented. Signatures should be included, as appropriate.
          By the time of application submission, the project team must have conducted a preliminary integrated design charrette, the results of which are to be 
          documented in GB-3, Charrette Documentation.
                                             GB-2: GREEN COMMUNITIES INTENDED METHODS WORKSHEET
                      Project Name                                  Organization Name
                     Project Address                                Organization Contact
                      Project Status                                      Date
          INTENDED METHODS WORKSHEET:  This worksheet identifies how the project team intends to incorporate all the Mandatory and adequate number of Optional Criteria into the development.
          This worksheet must be filled out and submitted before the construction start date. For additional information on how to submit go to www.greencommunitiesonline.org/tools/certification/
          INSTRUCTIONS: 
          1) Select an answer provided in the drop-down menu under Column D ("How Criterion will be implemented") for each criterion.
          2) Explain special circumstances or request a waiver using Column E ("If necessary, describe deviations from intended approach"). This may include information on an approach proposed by the project team that does not appear as an 
          option in the drop-down menu. 
          3) Indicate where the Criterion references can be found within the project documents in Column F and G ("Criteria Documentation").  This is required for Critierion 1.1b
          4) Indicate the project team member who is responsible for documenting and ensuring the completion of the Criterion under Column 'H' (Champion).
          5) Indicate the number of optional points being pursued by completing Column H ("Intended Points").        
          **Gray text within the spreadsheet (under "Green Development Agreement" section at bottom) indicates the type of information that could occupy that cell. It is not intended to be left in your final submission documents.
          Complete this document by signing the Green Development Agreement at the bottom of this worksheet. Without the mandatory signatures, this document 
          remains incomplete and the project will not recieve Step 1 Certification.
                       1: INTEGRATIVE DESIGN
                                                                                                                                                                                                           Criteria Documentation
                                                                                                                                                       If necessary, provide additional 
                                              Criteria Item                              How Criterion will be implemented                        information or explanation of alternative                                                            Champion        Intended Points
                                                                                                                                                     approach to meeting this measure        Location of Measure in    Spec page number / plan 
                                                                                                                                                                                               Project Documents      type for locating measure
                                      Green Development Plan: 
                            1.1a      Integrative Design                                                                                                                                                                                                                      M
                                      Meeting(s)
                            1.1b      Green Development Plan:                                                                                                                                                                                                                 M
                                      Criteria Documentation
                            1.2a      Universal Design (New                                                                                                                                                                                                                   0
                                      Construction only)
                            1.2b      Universal Design (Substantial                                                                                                                                                                                                           0
                                      & Moderate Rehab only)
                                                                                                                                                                                                                                                                              0
                                                                                                                                                                                                                                                                          Intended 
                                                                                                                                                                                                                                                                            Points
                       2: LOCATION + NEIGHBORHOOD FABRIC
                                                                                                                                                                                                           Criteria Documentation
                                                                                                                                                       If necessary, provide additional 
                                              Criteria Item                              How Criterion will be implemented                        information or explanation of alternative  Location of Measure in    Spec page number / plan         Champion        Intended Points
                                                                                                                                                     approach to meeting this measure          Project Documents      type for locating measure
                             2.1      Site Sensitive Selection (New                                                                                                                                                                                                           M
                                      Construction Only)
                                      Connections to Existing 
                                      Development and 
                                      Infrastructure (New 
                                      Construction only, except for 
                             2.2      projects located on rural                                                                                                                                                                                                               M
                                      tribal lands, in colonias 
                                      communities, or in 
                                      communities of population 
                                      less than 10,000)
                             2.3      Compact Development (New  Provide the net density and net density calculation for the project.                                                                                                                                          M
                                      Construction Only)
                             2.4      Compact Development           Provide the net density and net density calculation for the project.                                                                                                                                      0
                             2.5      Proximity to Services (New                                                                                                                                                                                                              M
                                      Construction only)
                             2.6      Preservation of and Access                                                                                                                                                                                                              M
                                      to Open Space
                             2.7       Preservation of and Access                                                                                                                                                                                                                      0
                                       to Open Space
                             2.8       Access to Public               Provide a brief narrative that summarizes the location, quantity and type of                                                                                                                                     0
                                       Transportation                 public transportation choices around project site
                                       Walkable Neighborhoods:        Provide summary of the project’s sidewalk and pathway connections to 
                             2.9       Connections to Surrounding  public spaces, open spaces or adjacent development                                                                                                                                                                  0
                                       Neighborhood
                             2.10      Smart Site Location: Passive   Provide a brief narrative that describe passive solar heating/cooling tactics                                                                                                                                    0
                                       Solar Heating / Cooling
                             2.11      Brownfield or Adaptive                                                                                                                                                                                                                          0
                                       Reuse Site
                             2.12      Access to Fresh, Local Foods                                                                                                                                                                                                                    0
                             2.13      LEED for Neighborhood                                                                                                                                                                                                                           0
                                       Development certification
                                                                                                                                                                                                                                                                                       0
                                                                                                                                                                                                                                                                                  Intended 
                                                                                                                                                                                                                                                                                    Points
                        3: SITE IMPROVEMENTS
                                                                                                                                                                                                                 Criteria Documentation
                                                                                                                                                           If necessary, provide additional 
                                                Criteria Item                               How Criterion will be implemented                         information or explanation of alternative  Location of Measure in      Spec page number / plan          Champion         Intended Points
                                                                                                                                                         approach to meeting this measure           Project Documents        type for locating measure
                             3.1       Environmental Remediation                                                                                                                                                                                                                      M
                                       Erosion and Sedimentation 
                             3.2       Control (Except for infill sites                                                                                                                                                                                                               M
                                       with buildable area smaller 
                                       than one acre)
                             3.3       Low Impact Development                                                                                                                                                                                                                         M
                                       (New Construction only)
                             3.4       Landscaping                                                                                                                                                                                                                                    M
                             3.5       Efficient Irrigation and Water  Provide a brief narrative describing type of irrigation systems to be                                                                                                                                          M
                                       Reuse                          implemented
                                       Surface Stormwater             Provide a brief narrative of the design strategies and systems that will be 
                             3.6       Management                     implemented, and indicate the calculated volume of water being retained,                                                                                                                                         0
                                                                      infiltrated, or harvested on site
                                                                                                                                                                                                                                                                                       0
                                                                                                                                                                                                                                                                                  Intended 
                                                                                                                                                                                                                                                                                    Points
                       4: WATER CONSERVATION
                                                                                                                                                                                                           Criteria Documentation
                                                                                                                                                       If necessary, provide additional 
                                              Criteria Item                              How Criterion will be implemented                        information or explanation of alternative  Location of Measure in    Spec page number / plan         Champion        Intended Points
                                                                                                                                                     approach to meeting this measure          Project Documents      type for locating measure
                             4.1      Water-Conserving Fixtures                                                                                                                                                                                                               M
                             4.2      Advanced Water-Conserving                                                                                                                                                                                                               0
                                      Appliances and Fixtures
                             4.3      Water Reuse                                                                                                                                                                                                                             0
                                                                                                                                                                                                                                                                              0
                                                                                                                                                                                                                                                                          Intended 
                                                                                                                                                                                                                                                                            Points
                       5: ENERGY EFFICIENCY
                                                                                                                                                                                                           Criteria Documentation
                                                                                                                                                       If necessary, provide additional 
                                              Criteria Item                              How Criterion will be implemented                        information or explanation of alternative  Location of Measure in    Spec page number / plan         Champion        Intended Points
                                                                                                                                                     approach to meeting this measure          Project Documents      type for locating measure
                                      Building Performance 
                                      Standard: Single family & 
                            5.1a      Multifamily, 3 stories or                                                                                                                                                                                                               M
                                      fewer (New Construction 
                                      only)
                                      Building Performance 
                            5.1b      Standard: Multifamily, 4                                                                                                                                                                                                                M
                                      stories or more (New 
                                      Construction Only)
                                      Building Performance 
                                      Standard: Single family & 
                            5.1c      Multifamily, 3 stories or                                                                                                                                                                                                               M
                                      fewer (Substantial and 
                                      Moderate Rehab)
                                      Building Performance 
                            5.1d      Standard: Multifamily, 4                                                                                                                                                                                                                M
                                      stories or more (Substantial 
                                      and Moderate Rehab)
                             5.2      Additional Reductions in                                                                                                                                                                                                                0
                                      Energy Use
The words contained in this file might help you see if this file matches what you are looking for:

...Dhcd submission instructions for gb and the green communities criteria intended methods checklist must be completed submitted with applications funding residential projects this will serve as basis project s preconstruction certification to enterprise community partners a preliminary at time of application should best team ability all mandatory required number optional documented signatures included appropriate by have conducted integrated design charrette results which are in documentation worksheet name organization address contact status date identifies how intends incorporate adequate into development filled out before construction start additional information on submit go wwwgreencommunitiesonlineorgtoolscertification select an answer provided dropdown menu under column d criterion implemented each explain special circumstances or request waiver using e if necessary describe deviations from approach may include proposed that does not appear option indicate where references can fou...

no reviews yet
Please Login to review.