190x Filetype XLS File size 0.11 MB Source: austintexas.gov
Sheet 1: FutureSol
City of Austin Future Professional Services and Construction Solicitations - April 2021 | ||||||||||
*Projected from April 2021 to April 2022, dates and information subject to change | ||||||||||
*For more information after a solicitation has been issued, go to: https://www.austintexas.gov/financeonline/account_services/solicitation/solicitations.cfm | ||||||||||
Tentative Date | Solicitation Name | Managing Department | Responsible Department | Est. Amount | Project Scope | Type | ||||
Apr-21 | Beverly Road Water and Wastewater Pipeline Renewal | Public Works | Austin Water | $1,224,000 | Replacement of water and wastewater pipelines on Beverly Rd between W. 30th St and W. 34th St. This project is part of Austin Water’s effort to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Apr-21 | West 9th and 12th Streets Water and Wastewater Renewal | Public Works | Austin Water | $2,353,778 | Water and wastewater system renewal in the area bound by W 9th, W 12th, Winflo Dr, Maufrais St, Elm St, and Brownlee Cir. This project is part of Austin Water’s efforts to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Apr-21 | Polybutylene Water Services Replacement Program | Public Works | Public Works | $2,100,000 | Approximately 2,400 existing polybutylene water services within approximately 70 subdivisions around the Austin area with pressures over 100 psi will be replaced with copper or HDPE. Due to pressure and material, these services have a high risk of breakage, and many have previously experienced a break with subsequent repair by AW | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Apr-21 | Springdale/290 Water Line Improvements | Public Works | Austin Water | $6,703,360 | The water system in the US Hwy 290/Springdale Rd area is aged, undersized, and has extremely high pressures, increasing the risk for leakage. These water lines are poorly gridded, resulting in an unreliable system with poor fire flow. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Apr-21 | Handcox Water Treatment Plant Process Buildings HVAC Improvements Project | Public Works | Public Works | $539,289 | HVAC will be added to the sodium hypochlorite (SH) building. A salt dust collection system will be added to the SH brine tank salt offloading. HVAC will be added to the filter building backwash blower room. Ventilation will be increased for the chemical building fluoride room. The absence of HVAC for the three (3) process buildings creat | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Apr-21 | Boggy Creek - MLK TOD Stormwater Conveyance Improvements Phase 2 | Public Works | Watershed Protection | $9,000,000 | This project completes implementation of stormwater conveyance infrastructure improvements in the MLK-TOD funded by the Watershed Protection Department. Improvements include new stormdrain infrastructure on MLK, Alexander, and 22nd Street. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Apr-21 | Northern Walnut Creek Hike and Bike Trail Phase 2 | Public Works | Parks and Recreation | $4,000,000 | This project consists of design and construction of a new trail on the Walnut Creek Greenbelt from Walnut Creek Metro Park to Walnut Bluffs. The trail is approx 1.3 miles in length and will consist of a 12' wide concrete trail with 2' shoulders. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Apr-21 | Rosewood-Zaragosa Neighborhood Center | Building Services | Building Services | $1,500,000.00 | Provide back up power and associated infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
May-21 | Elisabet Ney Museum - Building Restoration and Site Improvements | Public Works | Public Works | $1,710,000 | Next phase of building and landscape renovations to the Elisabet Ney Museum. Project scope to include but not limited to weatherization, building and interior improvements and additional site enhancements. | Competitive Sealed Proposal | ||||
May-21 | Southwest Allandale Neighborhood Water and Wastewater System Renewal | Watershed Protection | Austin Water | $1,587,000 | Water & wastewater system renewal in the area generally bound by West Park(west), Perry Ln(south), Bull Creek Dr(east), and Hancock(north). This project is part of Austin Water’s effort to replace aging/deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
May-21 | Academy Drive Water & Wastewater Pipeline Renewal | Public Works | Austin Water | $2,462,800 | Water and wastewater system renewal in the area bound by Academy Rd, Bickler Rd, and Pecan Grove Rd. This project is part of Austin Water’s efforts to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
May-21 | Southland Oaks Lift Station Wet Well Conversion | Public Works | Austin Water | $1,350,000 | Convert Southland Oaks Lift Station from a steel casing to submersible. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
May-21 | Hornsby Bend BMP Centrifuges | Public Works | Austin Water | $6,320,000 | Project primarily replaces two gravity belt thickeners with two centrifuges within the Hornsby Bend Biosolids Management Plant (BMP) Thickener Building. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
May-21 | Truman Heights Water & Wastewater Pipeline Renewal | Public Works | Austin Water | $2,825,004 | Water and wastewater system renewal in the area bound by MLK (north) and Jackie Robinson St (south). This project is part of Austin Water’s efforts to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
May-21 | 8th St - IH-35 Intersection Safety Improvements | Austin Transportation | Austin Transportation | $310,000 | The planned improvements include addition or modification of raised medians for access management, enhanced pedestrian and bicycle facilities, signal phasing changes, intersection reconfiguration, associated signing, striping and paving. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
May-21 | IH-35 SR (NB) - 7th St Intersection Safety Improvements | Austin Transportation | Austin Transportation | $345,000 | The planned improvements include addition or modification of raised medians for access management, enhanced pedestrian and bicycle facilities, signal phasing changes, intersection reconfiguration, associated signing, striping and paving. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Jun-21 | Davis WTP HSPS Hydraulic and Area Improvements | Public Works | Austin Water | $4,563,774 | Install hydraulic and energy efficiency improvements at the Low and High Service Pump Stations, and improve various high service pump station area operational components at the Davis Water Treatment Plant. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Jun-21 | Violet Crown Trail - North | Public Works | Public Works | $1,655,000 | This project is part of the overall Violet Crown Trail (Walk for a Day) in coordination with the Hill Country Conservancy. This phase connects Home Depot Blvd. to the southwest corner of Arbor Trails. This phase will be 10' wide, 1.75 mile long. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Jun-21 | Ullrich WTP Process Drain & Support Systems Improvements | Public Works | Austin Water | $6,737,850 | Improvements to multiple process areas at Ullrich Water Treatment Plant, including Sludge Cross-over Vault (Spaghetti Bowl) and entire clarifier flushing system. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Jul-21 | Motheral Drive Site Improvements | Public Works | Austin Water | $528,400 | AW crews used 10414 McKalla Place for construction materials storage until this site was chosen for a Major League Soccer stadium in 2018. 11100 Motheral Drive is now being used for this purpose, but site upgrades and a site plan permit are needed. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Jul-21 | William Cannon Drive Corridor - Running Water Dr to McKinney Falls Pkwy | Austin Transportation | Austin Transportation | $22,539,000 | Design and construction of mobility, safety and connectivity improvements as part of the Corridor Construction Program. Funding is provided by both the 2016 Mobility Bond and by a CAMPO grant. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Jul-21 | South Austin Regional WWTP Sludge Transfer Line and Reclaimed Water Line | Public Works | Austin Water | $6,200,000 | Stabilize the sludge transfer line and reclaimed line from South Austin Regional Wastewater Treatment Plant (WWTP) and Hornsby Bend Biosolids Management Plant where they cross the Colorado River. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Aug-21 | Walnut Creek Wastewater Treatment Plant Effluent Sample Pump Modifications | Public Works | Austin Water | $825,000 | Make modifications to the effluent sample pump located at the effluent meter station at Walnut Creek Wastewater Treatment Plant. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Aug-21 | South Tarrytown Water & Wastewater Pipeline Renewal | Public Works | Austin Water | $7,884,494 | Water and wastewater system renewal in the area bound by Exposition (west), Windsor (north), Sharon Rd (east) and Enfield (south). This project is part of Austin Water’s efforts to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Aug-21 | Stormwater Improvements Phase 2 | Public Works | Aviation | $1,887,186 | PER for drainage improvements and evaluations at several locations airside and landside. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Aug-21 | Barton Springs Rd - South 1st St Intersection Safety Improvements | Austin Transportation | Austin Transportation | $1,028,000 | The planned improvements include addition or modification of raised medians for access management, enhanced pedestrian and bicycle facilities, signal phasing changes, intersection reconfiguration, associated signing, striping and paving. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Aug-21 | Rosedale/Lawnmont Avenue Water and Wastewater Pipeline Renewal | Public Works | Austin Water | $8,904,896 | Water and wastewater system renewal in the area bound by Rosedale/Lawnmont. This project is part of Austin Water’s efforts to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Sep-21 | Boggy Creek - 6610 Shelton Road Erosion Repair and Grade Control Project | Public Works | Watershed Protection | $2,530,000 | Channel stabilization of Boggy Creek immediately downstream US Hwy 183 South | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Sep-21 | PEC Plumbing and Restroom Upgrade | Public Works | Austin Convention Center | $1,600,365 | Project will address plumbing and piping issues at the Palmer Events Center. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Sep-21 | Krieg Fields Reclaimed Water Line – Permanent Restoration | Public Works | Austin Water | $1,096,000 | An October 2015 storm event exposed and damaged a 16-inch reclaimed water main in Country Club West Creek on the east side of Krieg Fields, depriving the fields and a bulk fill station of reclaimed water service. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Sep-21 | Barton Creek – Oak Acres Creek Flood Risk Reduction Project | Public Works | Watershed Protection | $3,200,000 | Model and map the flood risk along the Gaines Tributary of Barton Creek, assess potential solutions for flooding in the Oak Park and Oak Acres subdivisions, and implement solutions that reduce the risk of flooding in the Oak Acres neighborhood. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Oct-21 | 38th and 40th Streets Water and Wastewater Pipeline Renewal | Public Works | Austin Water | $1,850,000 | Water and wastewater system renewal in the area bound by 38th, 39th, 40th, Red River, and IH-35. This project is part of Austin Water’s efforts to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Oct-21 | Davis WTP Raw Water Efficiency Low and High Service Pump Station | Public Works | Austin Water | $700,000 | Improvements to the Davis Water Treatment Plant Low Service Pump Station (LSPS). | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Oct-21 | Spicewood Springs Road Regional Mobility Improvements | Public Works | Public Works | $17,002,155 | The project includes design and construction of improvements that may include a roadway expansion from two lane section to a four lane divided roadway, signals, medians, waterlines, bicycle and pedestrian facilities, and driveway reconstruction. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Oct-21 | Bull Creek - Old Lampasas #3 Dam Modernization (R01475) | Public Works | Watershed Protection | $4,000,000 | Old Lampasas Dam was damaged by Tropical Storm Hermine in 2010. This is a modernization project to repair the dam and upgrade it to safely pass the design flood required by the City Drainage Criteria Manual and State of Texas Dam Safety Rules. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Oct-21 | South Austin Regional WWTP Trains A & B Improvements | Public Works | Austin Water | $78,230,000 | Due to aging infrastructure and deterioration of assets, the assets in Train A and B of the South Austin Regional Wastewater Treatment Plant need to be replaced to provide reliable and sustainable treatment process. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Nov-21 | Multi-Site - WQ Pond Repairs in the EARZ PER | Watershed Protection | Watershed Protection | $700,000 | This project is to determine the best approach to address specific malfunctioning or damaged Water Quality Treatment Ponds in the Edwards Aquifer Recharge Zone. The funding is for the PER only. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Nov-21 | Wildhorse Ranch Wastewater Treatment Plant Expansion | Public Works | Austin Water | $35,000,000 | Due to increasing growth in Austin and Manor as well as the diversion of the Harris Branch WWTP and future diversion of Dessau WWTP flows to Wild Horse Ranch Wastewater Treatment Plant (WWTP), the plant’s existing capacity of 0.75 MGD. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Nov-21 | Fallwell Lane Capital Renewal Project | Public Works | Public Works | $40,830,250 | Provide improved access to the South Austin Regional Wastewater Treatment Plant and the Sand Hill Energy Center. Relocate the existing access road and protect against flood erosion from major floods. More info: www.austintexas.gov/fallwellrenew | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Nov-21 | Dessau Wastewater Treatment Plant Capacity Expansion | Public Works | Austin Water | $8,650,000 | Due to increasing growth and resulting increase flows within the Dessau Wastewater Treatment Plant (WWTP) service area, the plant’s existing capacity of 0.5 million gallons per day (MGD) will need to be expanded to meet the projected year 2028 flows. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Dec-21 | Wilshire Blvd Area Water & Wastewater Pipeline Renewal | Public Works | Austin Water | $4,500,000 | Water and wastewater system renewal in the area bound by IH-35 (west), Airport (north and east), and 38th 1/2 (south). This project is part of Austin Water’s efforts to replace aging and deteriorated water and wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Jan-22 | Boggy Creek - MLK TOD Stormwater Conveyance Improvements Phase 3 | Public Works | Watershed Protection | $3,000,000 | This project completes the third phase of implementation of stormwater conveyance infrastructure improvements in the MLK-TOD funded by the Watershed Protection Department. |
Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Jan-22 | Hornsby Bend Biosolids Management Plant Roadway Improvements | Public Works | Austin Water | $1,000,000 | Improve road access to composting work pads/area at Hornsby Bend Biosolids Management Plant. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Feb-22 | Barton Creek – Oak Park Local Flood Risk Reduction Project | Public Works | Watershed Protection | $4,601,250 | Design and construct drainage systems including storm drain pipes, open channel and culvert improvements to reduce the risk of flooding to homes, streets, and low water crossings in the Oak Park subdivision in Southwest Austin. Companion Creek Flood | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Feb-22 | Williamson Creek - Tributary 4 Channel Stabilization | Public Works | Watershed Protection | $2,700,000 | Stream stabilization project along approximately 1500 linear feet (total) of a tributary to Williamson Creek. The channel is degrading in two priority locations and impacting multiple properties, both single family and commercial. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Feb-22 | Garden Villa Lane Water & Wastewater Pipeline Renewal | Public Works | Austin Water | $2,412,000 | Water and wastewater system renewal in the area of Garden Villa Lane. This project is part of Austin Water’s efforts to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Mar-22 | Little Walnut Creek - Park Plaza Stream Stabilization | Public Works | Watershed Protection | $1,797,060 | Bank stabilization project along Little Walnut Creek to reduce the risk of damaging five multifamily homes. General project location starts about 800 LF downstream of I-35 and is approximately 800 LF in length. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Mar-22 | Zilker Metro Park - Barton Springs Bathhouse Rehabilitation | Public Works | Parks and Recreation | $6,180,676 | Next phase of improvements to the historical bathhouse at Barton Springs Pool according to master plan. Project scope includes additional historical and structural evaluation and renovation of historic entry rotunda. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Apr-22 | Old Enfield Water & Wastewater Pipeline Renewal | Public Works | Austin Water | $4,290,000 | Water and wastewater system renewal in the area bound by Windsor Rd (north), Pease Rd (east), Enfield Rd (south) and MoPac (west). This project is part of Austin Water’s efforts to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
Early Summer 2021 | Professional Services for Convention Center Expansion | Public Works | Austin Convention Center | $68,000,000 | Improvements, renovations, and redevelopment to the existing Austin Convention Center site. Construction Manager at Risk Project. | Construction Manager at Risk | ||||
June-July 2021 | Waller Creek District - Creek Delta Link | Watershed Protection | Watershed Protection | $46,000,000 | The Creek Delta project is a component of the Creek Delta Link phase of the Waller Creek District. The trail will be located on both banks of Waller Creek from Lady Bird Lake to 4th St. and will be approximately 1 mile in total length. There will be top of bank trails, creek level elevated walkways, and 3 new pedestrian bridges. 11 new trail connections to adjacent ROWs are proposed. The creek will be reconstructed to stabilize the severely eroded slopes and restore the riparian zone and ecosystem. Public-private partnership with the Waterloo Greenway Conservancy acting as managing party. | Competitive Sealed Proposal | ||||
Late Summer 2021 | Convention Center Expansion Construction Manager at Risk | Public Works | Austin Convention Center | $1,200,000,000 | Improvements, renovations, and redevelopment to the existing Austin Convention Center site. | Construction Manager at Risk | ||||
TBD | Medical Arts Square Water and Wastewater System Renewal | Public Works | Austin Water | $2,575,018 | Water and wastewater system renewal in the greater Medical Arts Square area on the north side of UT campus. This project is part of Austin Water’s efforts to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | W. Bouldin Creek - Del Curto Storm Drain Improvements | Public Works | Watershed Protection | $2,955,103 | This project will improve the storm drain system in the South Lamar neighborhood roughly between Bluebonnet Lane and Thornton Road. It will help protect the area from flooding. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Zilker Water and Wastewater Pipeline Renewal | Public Works | Austin Water | $6,996,035 | Water and wastewater system renewal in the area of Treadwell St. This project is part of Austin Water’s efforts to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Meadow Lake Blvd Street Extension | Public Works | Public Works | $2,100,000 | Street reconstruction and extension to include bike lanes, sidewalks, curb and gutters, drainage, landscaping and parking on Meadow Lake Blvd | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Piland Triangle Interconnect | Public Works | Austin Water | $1,782,770 | Customers in this area are experiencing pressures under 35 PSI. There is much near-term development planned in this area that can not meet fire flow and velocity requirements without this project's 24-inch transmission main improvement. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Bull Creek Basin Wastewater Pipelines Renewal | Public Works | Austin Water | $5,112,500 | Wastewater system renewal in the Bull Creek Basin. This project is part of Austin Water’s efforts to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Cepeda Branch Trail | Public Works | Austin Public Library | $213,228 | The project proposes to connect the Govalle Neighborhood to the Cepeda Branch Library, under the E. Seventh Street overpass | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Onion Creek Reclaimed Water Main Phase 1 | Public Works | Austin Water | $7,700,000 | This project has the opportunity to build economies of scale in the reclaimed water system by connecting the following customers: Onion Creek Soccer Fields, Onion Creek District Park, Dove Springs Rec Center, Dove Springs Health Center, etc. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Cesar Chavez St. Promenade PH II | Public Works | Public Works | $5,777,450 | This project includes improvements on south side of Cesar Chavez intended to match the style and feel of the recently completed esplanade at San Antonio/Cesar Chavez. Includes street trees, landscaping, furnishings and other associated improvements. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Jain Lane Street Realignment | Public Works | Public Works | $3,843,400 | Jain Lane project consists of adding street surface/realignments, ADA Sidewalks, drainage, vegetation, and right-of-way acquisitions. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Kellam Road Water Pipeline Renewal | Public Works | Austin Water | $460,000 | Rehabilitation of approximately 1,800 linear feet of existing 6 inch cast iron water line with 12-inch PVC pipes. The proposed project will replace aging infrastructure as part of the Renewing Austin Program. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | 2021 IDIQ Right Of Way Chilled Water Contract | Austin Energy | Austin Energy | $20,000,000 | Provision of pipe, piping hot taps; excavation, tunneling, or boring as required for pipe installation, along with all required casing spacers, tunnel supports, tunnel safety provisions, tunnel dewatering, traffic control provisions including barricades, signage, and safety fencing, valve boxes with traffic rated lids, valve operator stem | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | 2nd Street Garage New Elevators Rebid | ACC | ACC | $5,000,000 | Elevator bank addition on Northeast corner of existing parking garage, corner of 2nd St. and San Jacinto. Also minor architectural finishes renovation on parking garage and security improvements at car and pedestrian entrances. | |||||
TBD | Airport Boulevard - N. Lamar Blvd to 55th Street | Public Works | Public Works | $2,000,000 | Design and construction of intersection improvements including new and/or upgraded bicycle and pedestrian facilities, pedestrian ramps, additional turn lanes, crosswalks, median islands, and upgraded traffic signals. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Architectural Services for the Mexic-Arte Museum Renovation | Parks and Recreation | Parks and Recreation | $2,600,000 | Improvements and renovations to the existing Mexic-Arte Museum. Construction Manager at Risk Project. | Construction Manager at Risk | ||||
TBD | Architectural Services Services for Montopolis Neighorhood Park & Northwest District Park Pool Replacements | Parks and Recreation | Parks and Recreation | $1,450,000 | The project is for the replacement and upgrade of two pool facilities and associated improvements, one at the Monotpolis Neighborhood Park. Construction Manager at Risk Project. | Construction Manager at Risk | ||||
TBD | Brackenridge GIS Substation - Design Build | Austin Energy | Austin Energy | $15,000,000 | Rebuild the Brackenridge substation for complete operation at 138kV High Density Developments and Limited Property availability in the area will require that this substation be rebuilt as a gas-insulated substation to accommodate the new network transformers. | Design-Build | ||||
TBD | Burnet Road Corridor - Braker Lane Intersection Improvements | Austin Transportation | Austin Transportation | $375,580 | Install the equipment control enclosure at the Cistern Substation | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Chilled Water Piping Construction in Right Of Way and Customers Distribution Sites | Austin Energy | Austin Energy | $305,000 | The Work consists of The Work consists of construction of a new enclosed space within the existing District Cooling Plant #2 (DCP2) to house chemicals, including 93% sulfuric acid, for condenser water treatment. The project includes construction of the new enclosed space, associated fire protection system, integration into the fire alarm | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Cistern Substation Control Enclosure | Austin Energy | Austin Energy | $5,641,905 | The water system upgrades include approximately 10,260 linear feet of water line and 7,980 linear feet of wastewater | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Cistern Substation Cut-in and CKT 3121/3136 OPGW Addition | Austin Energy | Austin Energy | $5,403,226 | This project includes cutting into the existing CKT 3121 and connecting to the new Cistern Switchyard. It also replaces existing shield wire with 72 Fiber OPGW on the 50-mile CKT 3121 (25.74 miles) and CKT 3136 (24.77 miles | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | DCP2 Chemical Storage Addition | Austin Energy | Austin Energy | $1,617,660 | The work consists of installing approximately 2910 LF of 24" DI water line, 690 LF of 16" DI water line, 115 LF of 36" jacked or bored steel encasement pipe, 100 LF of 24" jacked or bored steel encasement pipe, four 24" gate valves, three 16" gate valves, three CARV's, three fire hydrants and appurtenances. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Facilities - Emergency and lift Station IDIQ | Public Works | Public Works | $4,000,000 | The Work generally consists of providing the following services, including but not limited to: a)Emergency On Call Response: The CONTRACTOR will provide on-call, emergency response service to repair/replace components of the distribution system due to failure, breakage etc. b)Rehabilitation of existing lift station facilities. c)Operations Support: The CONTRACTOR will provide support services to the City of Austin Operations Staff on an as-needed basis (e.g., exposing existing force mains or appurtenances which City crews are unable to perform). | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Harold Court Service Center 1 Renovations | Public Works | Public Works | $450,000 | Widen the drive to create better traffic flow on the east side of the building. Existing restrooms will be renovated to make them accessible, and second floor offices added. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Hyde Park Water and Wastewater Pipeline Renewal | Public Works | Public Works | $48,000,000 | Construct and rehabilitate Mobility Projects including sidewalks, bikeways, urban trails, safe routes to school | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | In Situ Wastewater Line Renewal Program IDIQ (2022 to 2024) | Public Works | Austin Water | $4,050,000 | Rehabilitation of deteriorated wastewater mains using cured in place pipe (CIPP) lining throughout the city using an indefinite delivery/indefinite quantity construction contract | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Johnny Morris/Hwy 290 Area Water Line Extensions | Public Works | Austin Water | $6,725,000 | Water and wastewater system renewal in the area of Treadwell St. This project is part of Austin Water’s efforts to replace aging and deteriorated water & wastewater infrastructure. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Local Mobility ADA Sidewalk & Ramp IMPS Grp 26 IDIQ | Public Works | Public Works | $1,000,000 | Street reconstruction and extension to include bike lanes, sidewalks, curb and gutters, drainage, landscaping and parking on Meadow Lake Blvd | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Longview Offsite Utilities Phase 1 | Public Works | Austin Water | Cost reimbursement project for the construction of approximately 4,270 feet of oversized 24-inch DI water main along Kellam Road north of Pearce Lane and approximately 4,575 feet of oversized 16-inch DI wastewater force main along Pearce Lane east of SH 13 | Invitation for Bid (Competitive Sealed Bid or Low Bid) | |||||
TBD | Mexic-Arte Museum Renovation Construction Manager at Risk | Parks and Recreation | Parks and Recreation | $12,000,000 | Improvements and renovations to the existing Mexic-Arte Museum. | Construction Manager at Risk | ||||
TBD | Montopolis Neighorhood Park & Northwest District Park Pool Replacements Construction Manager at Risk | Parks and Recreation | Parks and Recreation | $11,180,000 | The project is for the replacement and upgrade of two pool facilities and associated improvements, one at the Monotpolis Neighborhood Park. | Construction Manager at Risk | ||||
Summer 2021 | PARD PM Services for Montopolis & Northwest Aquatic Facilities (Montopolis Pool Replacement & NW Pool Replacement) | Parks and Recreation | Parks and Recreation | $681,500 | The City of Austin is soliciting Statements of Qualifications for the selection of one firm to provide Project Management Services (PM) for the design and construction of Montopolis Neighborhood Park Pool and the Northwest District Park Pool. | Professional Services | ||||
TBD | Pedestrian Safety & Transit Connections- CAMPO - PHBs -CSJ: 914-04-319 | Austin Transportation | Austin Transportation | $800,000 | Remove and replace the existing synthetic running track and base, install additional drainage to prevent damage to new track. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Public Safety Training Center Running Track | Building Services | Building Services | $11,400,000 | The Work consists of the construction of a 1.01 acre Gas Insulated Switchgear (GIS) electrical substation including: erosion controls, clearing/grubbing the site, importing/placing fill, placing base material, construction of a 12 foot architectural solid fence, installation of several sizes of duct bank, installation of a copper grounding grid, installation of equipment foundations and construction of a 40’x60’ building. The project also includes construction of two rain gardens, sidewalks, street trees, landscaping and temporary irrigation | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Sand Hill Energy Center Back up Power Addition | Austin Energy | Austin Energy | $585,725 | Make parking garage improvements at the Second Street parking garage. Exterior paint, canopies, signage and other security improvements. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Second Street Garage Improvements | Public Works | Austin Convention Center | $274,760 | Replace the Spring Lake #2 Lift Station flow control valves and actuators, drain valve and actuator, couplings, and pressure transmitters. Revise the control system for the wet weather pumps and drain line and add an access hatch to the wet well. These improvements will allow the lift station to operate in accordance with the original intent to provide flow to the Balcones WWTP for reuse irrigation at the Balcones County Club golf course. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Spring Lake #2 Lift Station Improvements | Public Works | Public Works | $274,760 | Replace the Spring Lake #2 Lift Station flow control valves and actuators, drain valve and actuator, couplings, and pressure transmitters. Revise the control system for the wet weather pumps and drain line and add an access hatch to the wet well. These improvements will allow the lift station to operate in accordance with the original intent to provide flow to the Balcones WWTP for reuse irrigation at the Balcones County Club golf course. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | St. Elmo Service Center 8 Renovations | Public Works | Austin Water | $725,000 | Driveway addition, parking lot re-asphalt/clean-up off of Sponberg & customer service addition to service center 8. Also new heavy vehicle parking lot and new pole yard (to replace Austin Energy pole yard taken by heavy vehicle parking lot). | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Tennis Facilities - Pharr Tennis Center Renovations | Public Works | Public Works | $2,600,000 | Project includes removal of existing bi-level courts and re-grading to one accessible level complying with ADA requirements, addition of one new court, re-location of backboard court and new court lighting. The tennis pro-shop structure will need abatement for asbestos and/or lead based paint in addition to bringing the interior restroom facilities up to ADA compliance which may require plumbing rerouting. The facility parking area will also need to be made fully accessible. Site drainage issues need to be addressed. Additional enhancements will include facility signage, shade structures and drinking fountains. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | Waller Creek Inlet Facility Catenary Screen Pilot | Public Works | Watershed Protection | $2,100,000 | The Work consists of the following:1.Installationoftwo (2) 8-foot catenary screen cleaning mechanisms. Installation of catenary screen cleaning equipment includes but is not limited to all rakes, chains, discharge chutes, motors, sprockets, and structural support structure.2.Providing equipment access by modifying existing walls on the operations deck. Providing maintenance access by modifying the existing waterfall trough.3.Installation of a new level sensor for pool elevation as shown on Plans. Set points will control the operation of the catenary cleaning equipment.4.Installation of sump in the existing Pool floor for maintenance.5.Installation of all power and control cables.6.Cleaning of screens on Bay 4 after each rain event that occurs during construction.7.Maintaining a diversion of natural dry weather creek flow away from Bay 4 working area during construction.8.Removal of all construction debris and site clean up.9.All remaining and associated items of work contained in the Contract Documents works as shown on PLANS. | Invitation for Bid (Competitive Sealed Bid or Low Bid) | ||||
TBD | WPD-Waller Creek Tunnel Slide Gate | Public Works | Public Works | $350,000 | The Work consists of removing the cover plates from the two inlet pipe collars on the lagoon side of the Waller Creek Tunnel outlet structure and replacing them with slide gates that match the existing cover plate bolt pattern. The design team will work with manufacturers and suppliers to attempt to incorporate an electric actuator for the gate assembly. | Invitation for Bid (Competitive Sealed Bid or Low Bid) |
no reviews yet