177x Filetype XLSX File size 0.03 MB Source: www.in.gov
APPENDIX "D" Compensation 1. The CONSULTANT shall receive as payment for the work performed under this Contract the total amount not to exceed $000,000.00. 2. The CONSULTANT will be paid for the unit price services described in Appendix “A” in accordance with the schedule listed below. Unit Unit Price Total GEOTECHNICAL FIELD 1. Mobilization and field coordination a. SPT Rig each b. CPT each c. Mileage mi 2. Truck mounted borings with split spoon sampling a. Standard f b. Night time f 3. Truck mounted borings with drilling fluid a. Standard f b. Night time f 4. Truck mounted rock core drilling a. Standard f b. Night time f 5. Truck mounted borings a. Truck mounted borings through bedrock or boulders or concrete pavement i. Standard f ii. Night time f b. Bridge deck coring and restoration i. Standard each ii. Night time each 6. Cone penetrometer testing a. Set up i. Standard each ii. Night time each b. Subsurface profiling i. Standard f ii. Night time f c. Profiling with pore pressure measurement i. Piezometric saturation a. Standard each b. Night time each ii. Penetration a. Standard f b. Night time f iii. Pore water dissipation test a. Standard hour b. Night time hour iv. Hydraulic conductivity and consolidation a. Standard each b. Night time each d. Profiling with shearwave velocity measurement i. Standard f ii. Night time f e. Sample i. Standard each ii. Night time each 7. Hand or truck soundings a. Standard f b. Night time f 8. Hand auger drilling a. Standard f b. Night time f 9. Skid mounted borings with split spoon sampling a. Standard f b. Night time f 10. Skid mounted borings using drilling fluid a. Standard f b. Night time f 11. Skid mounted rock core drilling a. Standard f b. Night time f 12. Skid mounted boring through bedrock or boulders a. Standard f b. Night time f 13. Skid mounted soundings a. Standard f b. Night time f 14. Skid mounted cone penetrometer testing (CPT) a. Set up i. Standard each ii. Night time each b. Subsurface profiling i. Standard f ii. Night time f c. Profiling with pore pressure measurement i. Piezometric saturation a. Standard each b. Night time each ii. Penetration a. Standard f b. Night time f iii. Pore water dissipation test a. Standard hour b. Night time hour iv. Hydraulic conductivity and consolidation a. Standard each b. Night time each d. Profiling with shearwave velocity measurement i. Standard f ii. Night time f e. Sample i. Standard each ii. Night time each 15. Furnishing of a boat 16. Barge set-up expenses a. Navigable water i. Barge set-up each ii. Rental of support equipment and/or boat each iii. Drill rig down time hour b. Non-navigable water barge set-up each 17. Additional disassembly and reassembly a. Navigable water each b. Non-navigable water each 18. Barge mounted borings with split spoon sampling f 19. Barge mounted rock core drilling f 20. Barge mounted boring through bedrock or boulders f 21. Barge mounted soundings f 22. Casing through water f 23. Uncased sounding through water f 24. Set up for borings and machine soundings a. Borings and machine soundings less than 20 f deep each b. Rock core borings each 25. Additional 2-in. split spoon sampling each 26. 3-in. split spoon samples each 27. 3-in. Shelby tube samples each 28. Bag Samples a. 25-lb sample each b. 5-lb sample each 29. Field vane shear test a. Standard each b. Night time each 30. 4 1/2-in. cased hole f 31. Installation of geotechnical instruments a. Inclinometer casing installation i. Standard f ii. Night time f b. Piezometer installation up to 25 f below surface each c. Piezometer installation deeper than 25 f below surface each d. Metal protective outer cover for inclinometer and piezometer casi each 32. Railroad expenses 33. Twenty-four hour water levels a. Field measurements per borehole i. Standard each ii. Night time each b. PVC slotted pipe f 34. Borehole backfilling a. 0 to 15 f i. SPT a. Standard each b. Night time each ii. CPT a. Standard each b. Night time each b. More than 15 f i. SPT a. Standard f b. Night time f ii. CPT a. Standard f b. Night time f c. Pavement restoration i. Standard each ii. Night time each 35. Equipment rental 36. Traffic control a. Flag crew day b. Equipment rental and professional traffic services c. Flag crew with equipment day 37. Centerline surveying 38. Percolation Test a. Granular Soils (A-1, A-2, A-3) each b. Cohesive Soils (A-4, A-5, A-6, A-7) each
no reviews yet
Please Login to review.