196x Filetype XLSX File size 0.03 MB Source: mdot.ms.gov
Sheet 1: Instructions
INSTRUCTIONS AND INFORMATION | |
The forms in this workbook are to be used for Emergency Relief Work. | |
• | The spreadsheets can be duplicated on additional tabs by right clicking the tab at the bottom of one of the spreadsheets and using the Move or Copy command. |
• | All gray blanks require data entry, white blanks contain equations and will fill in automatically. |
• | Labor Rates will be the actual rate of wage. |
• | All overtime work must be approved in advance by the project engineer. If overtime is approved the overtime rate should be entered in the row immediately below the regular rate. |
• | The hourly rate for owned equipment, should adhere to the rates shown in the "MS Department of Transportation Equipment Rental Rates". |
• | The Department will if it is more effective to leave rental equipment on site and pay the invoice price, or pay for multiple mobilizations. |
• | The print range (A1 to R59) is set up to print the form as one page. |
If revision to this workbook is necessary please notify LPA Division. | |
NOTES |
no reviews yet
Please Login to review.