jagomart
digital resources
picture1_Inventory Spread Sheet 24086 | Larp Jbc November 2013


 196x       Tipe PDF       Ukuran file 1.91 MB       Source: web.pln.co.id


File: Inventory Spread Sheet 24086 | Larp Jbc November 2013
land acquisition and resettlement plan project number november 2013 indonesia java bali 500 kv power transmission crossing project reviations abb ac alternate current adb asian development bank ah affected household ...

icon picture PDF Filetype PDF | Diposting 31 Jul 2022 | 3 thn lalu
Berikut sebagian tangkapan teks file ini.
Geser ke kiri pada layar.
         Land Acquisition and Resettlement Plan
         Project Number:  
         November 2013 
         Indonesia: Java-Bali 500 kV Power Transmission 
         Crossing Project  
                                                      REVIATIONS 
                                                 ABB
              AC                Alternate Current
              ADB               Asian Development Bank 
              AH                Affected Household
              AMDAL             Analisis Mengenai Dampak Lingkungan  
              AP                Affected People 
              CSR               Corporate Social Responsibility 
              DC                Double Circuit 
              DFR               Draft Final Report 
              DMS               Detailed Measurement Survey 
              DWRD              Department of Water Resources Development 
              EA                Executing Agency
              EIA               Environmental Impact Assessment
              EMF               Electromagnetic Field
              EHT               Elevated High Tension  
              GDP               Gross Domestic Product 
              GOI               Government of Indonesia
              ha                hectare
              HHs               Households
              HV                High Volt
              HVAC              High Volt Alternate Current 
              HVDC              High Volt Direct Current 
              IA                Implementing Agency
              IOL               Inventory of Losses 
              IPDP              Indigenous Peoples Development Plan  
              IPs               Indigenous peoples  
              IPSA              Initial Poverty and Social Analysis  
              KV                Kilo Volt
              LARP              Land Acquisition and Resettlement Plan 
              LV                Low Volt
              MOF               Ministry of Forestry  
              MVMC              Multi-Voltage Multi Circuit 
              NGOs              Non-governmental Organizations
              PDD               Project Design Document  
              PIB               Public Information Booklet 
              PLN               Perusahaan Listrik Negara 
              PLN UIP JJB       PLN Unit Induk Pembangunan Java – Bali 
              PMU               Project Management Unit 
              RKL               Rencana Pengelolaan Lingkungan 
              RoW               Right of Way 
              Rp                Rupiah
              SES               Socio-Economic Survey
              SPRSS             Summary Poverty Reduction and Social Strategy 
              SPS               Safeguard Policy Statement 
              SRPs              Summary Resettlement Plans 
              TL                Transmission Lines
              ToR               Terms of Reference 
                                                                                                  CONTENTS 
                          DEFINITION OF TERMS                                                                                                                                              1 
                          I.      EXECUTIVE SUMMARY                                                                                                                                        3 
                                                                            N                                                                                                              7 
                          II.     PROJECT DESCRIPTIO
                               A.  Background                                                                                                                                              7 
                               B.  Description of Project and Resettlement                                                                                                                 7 
                               C.  Scope of Land Acquisition and Resettlement Plan                                                                                                       11 
                          III.    SCOPE OF LAND ACQUISITION AND RESETTLEMENT                                                                                                             12 
                               A.  Potential Impacts                                                                                                                                     12 
                               B.  Measures to Minimize Resettlement Impacts                                                                                                             12 
                               C.  Resettlement Field Survey                                                                                                                             13 
                               D.  Cut-Off Date                                                                                                                                          13 
                               E.  Type of Impacts                                                                                                                                       13 
                               F.  Detailed Impacts by Components                                                                                                                        14 
                          IV.     SOCIOECONOMIC INFORMATION AND PROFILE                                                                                                                  20 
                               A.  Methodology Used for Socio-economic Survey                                                                                                            20 
                               B.  Project Areas                                                                                                                                         20 
                               C.  Socio-Economic Characteristic                                                                                                                         21 
                          V.      PUBLIC CONSULTATION, PARTICIPATION AND DISCLOSURE                                                                                                      23 
                               A.  Public Consultations                                                                                                                                  23 
                               B.  Grievance Redress Mechanisms                                                                                                                          31 
                          VI.     LEGAL FRAMEWORK                                                                                                                                        35 
                               A.  Policy and Regulatory Background of Government of Indonesia                                                                                           35 
                               B.  Asian Development Bank Policy                                                                                                                         36 
                               C.  Compensation and Resettlement Policy for the Project                                                                                                  38 
                               D.  Key Principles for Project                                                                                                                            38 
                          VII. ENTITLEMENTS AND ASSISTANCE                                                                                                                               40 
                               A.  Eligibility                                                                                                                                           40 
                               B.  Entitlements                                                                                                                                          40 
                          VIII. INCOME RESTORATION AND REHABILITATION                                                                                                                    44 
                          IX.     RESETTLEMENT BUDGET AND FINANCING                                                                                                                      46 
                               A.  Legal basis                                                                                                                                           46 
                               B.  Budget and financing plan                                                                                                                             47 
                               C.  Total estimated cost for LARP implementation                                                                                                          47 
                               D.  Institutional Arrangement                                                                                                                             48 
                          X.      IMPLEMENTATION ARRANGEMENT AND SCHEDULE                                                                                                                51 
                               A.  Capacity Building                                                                                                                                     51 
                               B.  LARP Updating Activities                                                                                                                              52 
                          XI.     MONITORING AND EVALUATION                                                                                                                              56 
                               A.  Internal Monitoring                                                                                                                                   56 
                               B.  External Monitoring                                                                                                                                   56 
                          ANNEXURE                                                                                                                                                       59 
                                                                                                       1 
                                                DEFINITION OF TERMS 
              Affected           All the people affected by the project through land acquisition, 
              persons (APs) /    relocation, or loss of incomes and include any person, household, 
              households         firms, or public or private institutions. APs/AHs therefore include: (i) 
              (AHs)              persons affected directly by the safety corridor, right-of-way, tower or 
                                 pole foundations or construction work area; (ii) persons whose 
                                 agricultural land or other productive assets such as trees or crops 
                                 are affected; (iii) persons whose businesses are affected and who 
                                 might experience loss of income due to the project; (iv) persons who 
                                 may lose work or employment as a result of project impact; and (v) 
                                 people who lose access to community resources as a result of the 
                                 project.  
              Compensation       Payment in cash or kind for an asset to be acquired or affected by a 
                                 project at replacement cost based on current market value. 
              Cut-off-date       The date prior to which the occupation or use of the project area 
                                 makes residents or users of the same eligible to be categorized as 
                                 AP. The cut-off date will coincide with the census of AP and the 
                                 inventory of losses (IOL) that will be conducted by the national 
                                 agency implementing land acquisition. Persons not covered in the 
                                 census would not be eligible for compensation and other 
                                 entitlements unless they can provide evidence that (i) they have 
                                 been inadvertently left out during the census and the IOL; or (ii) they 
                                 have lawfully acquired the affected assets following completion of 
                                 the census and the IOL and prior to the conduct of the detailed 
                                 measurement survey (DMS). 
              Eminent            The right of the state or the government using its sovereign power to 
              domain             acquire land for public interest in accordance with appropriate 
                                 regulatory provisions. 
              Encroachers        Those people who move into the project area after the cut-off date 
                                 and are therefore not eligible for compensation or other rehabilitation 
                                 measures provided by the project. 
              Entitlement        The range of measures for compensation and other forms of 
                                 assistance provided to the APs in the respective eligibility criteria.  
              Income             This is the re-establishment of sources of income and livelihood of 
              restoration        the affected households. 
              Inventory of       The process where all fixed assets and sources of income and 
              losses (IOL)       livelihood inside the project right-of-way (ROW) are identified, 
                                 measured, their owners identified, their exact location pinpointed, 
                                 and their replacement costs calculated.  
              Land               The process of acquiring all or part of the land and other assets 
              acquisition        attached to the land owns or possesses, to the ownership and 
                                 possession of that agency, for public purposes, in return for fair 
                                 compensation. The land acquisition and resettlement plan is known 
                                 as LARP. 
              Meanigful          A process that (i) begins early in the project preparation stage and is 
                                 carried out on ongoing basis throughout the project cycle; (ii) 
               
Kata-kata yang terdapat di dalam file ini mungkin membantu anda melihat apakah file ini sesuai dengan yang dicari :

...Land acquisition and resettlement plan project number november indonesia java bali kv power transmission crossing reviations abb ac alternate current adb asian development bank ah affected household amdal analisis mengenai dampak lingkungan ap people csr corporate social responsibility dc double circuit dfr draft final report dms detailed measurement survey dwrd department of water resources ea executing agency eia environmental impact assessment emf electromagnetic field eht elevated high tension gdp gross domestic product goi government ha hectare hhs households hv volt hvac hvdc direct ia implementing iol inventory losses ipdp indigenous peoples ips ipsa initial poverty analysis kilo larp lv low mof ministry forestry mvmc multi voltage ngos non governmental organizations pdd design document pib public information booklet pln perusahaan listrik negara uip jjb unit induk pembangunan pmu management rkl rencana pengelolaan row right way rp rupiah ses socio economic sprss summary reducti...

no reviews yet
Please Login to review.