230x Filetype DOCX File size 0.07 MB Source: mhb.com.my
Ref. No.: MHHE/ITB/SCM/11-REV0 CONTRACT EXHIBIT 6 Page 1 of 11 ___________________________________________________________________________________________________________________ SUPPLIER DOCUMENT INSTRUCTIONS TABLE OF CONTENT ITEM SUBJECT PAGE 1.0 PURPOSE 2 2.0 REFERENCE DOCUMENTS 2 3.0 DEFINITIONS 2 4.0 COMMUNICATION ADDRESS AND FACSMILE 2 5.0 MEETINGS 3 6.0 REPORTING 3 7.0 DRAWING AND DOCUMENT SUBMISSION PROCEDURES 4 8.0 EQUIPMENT VENDOR MANUALS 7 9.0 PAYMENT AND INVOICING 7 10.0 WAREHOUSE OPERATING FOR RECEIVING 8 11.0 VARIATION ORDER 9 12.0 SUPPLIER DOCUMENT REQUIRED LIST (SDRL) 9 13.0 CONTRACT CLOSURE 9 APPENDIX 5 SAMPLE OF CUSTOMER PROGRESS REPORT APPENDIX 6 ONLINE CERTIFICATE PROGRESS CLAIM (CPC) SUBMISSION MATERIAL PURCHASES (MILESTONE PAYMENT) APPENDIX 7 ONLINE INVOICE SUBMISSION APPENDIX 8 SPARE PARTS INTERCHANGEABLE RECORDS (SPIR) APPENDIX 9 VARIATION ORDER PROPOSAL FORMS (VOPF) APPENDIX 10 FORMAT FOR CONTRACT CLOSURE LETTER APPENDIX 11 FORMAT FOR CONTRACT CLOSURE CERTIFICATE APPENDIX 12 SUPPLIER DOCUMENT REQUIREMENTS LISTING (SDRL) 1.0 PURPOSE The purpose of this guideline is to describe the required method of CONTRACT implementation between MMHE and SUPPLIER with respect to documentation submissions specified in CONTRACT. All costs for the fulfilment of the requirements of this Exhibit 6: Supplier Document Instructions shall be included in Exhibit 5: Schedule of Compensation. Ref. No.: MHHE/ITB/SCM/11-REV0 CONTRACT EXHIBIT 6 Page 2 of 11 ___________________________________________________________________________________________________________________ 2.0 REFERENCE DOCUMENTS This section must be read together with the PURCHASE ORDER and Exhibit 4: Scope of Supply. 3.0 DEFINITIONS MMHE – Malaysia Marine and Heavy Engineering Sdn Bhd who will issue the CONTRACT. SUPPLIER - any person or company to whom the CONTRACT/PURCHASE ORDER is issued for the supply of WORK. 4.0 COMMUNICATION ADDRESSES AND FACSIMILE Any notices and communications required to be given under this CONTRACT shall be in writing. Such notices and communication shall be deemed to be duly given when they shall have been delivered by hand, E-mail, or facsimile, to the parties to which they are required to be given such party’s address as specified following: 4.1 Malaysia Marine and Heavy Engineering Sdn. Bhd. MMHE Representative :Address : Telephone : Telefax : E-mail Address : SITE Representative : Address : Telephone : Telefax : E-mail Address : 4.2 SUPPLIER Representative : Address : Telephone : Telefax : E-mail Address : PROJECT Representative : Address : Telephone : Telefax : E-mail Address : 5.0 MEETINGS 5.1. The SUPPLIER shall hold meetings on the dates set by MMHE and in accordance with the CONTRACT, and additionally, as often as is necessary for keeping all parties fully informed with respect to the progress of the WORK and for discussing technical subjects and resolving such problems as may arise in the execution of the WORK. MMHE shall advise the Ref. No.: MHHE/ITB/SCM/11-REV0 CONTRACT EXHIBIT 6 Page 3 of 11 ___________________________________________________________________________________________________________________ scheduling of meetings in writing. 5.2. All meetings scheduled throughout the performance of the CONTRACT shall be minuted by MMHE and the minutes of each meeting shall be issued to the SUPPLIER within 2 working days. 5.3. When resolution of issues is not possible within the meeting, or where the matter requires some action on the part of the SUPPLIER or MMHE, then this shall be indicated in the minutes, and MMHE or the SUPPLIER shall subsequently respond in writing providing the necessary information and/or confirming the course of action, as appropriate. 5.4. The SUPPLIER shall advise MMHE by giving two (2) days written notice of all meetings of a technical nature to be held between the SUPPLIER and its SUBSUPPLIERS. MMHE reserves the right to attend all such meetings in order to ensure that the WORK is completed in accordance with the CONTRACT. Attendance by MMHE shall in no way relieve the SUPPLIER of any of its responsibilities as set forth in the CONTRACT. 5.5. In general, all meetings after the EFFECTIVE DATE shall be conducted at MMHE'S SITE Office. However, there may be a requirement for monthly management meetings between MMHE REPRESENTATIVE and the SUPPLIER REPRESENTATIVE, which may be held at MMHE'S office in Kuala Lumpur and/or Pasir Gudang Yard. 6.0 REPORTING 6.1. General The SUPPLIER shall keep MMHE fully informed on all aspects of the WORK that affect progress. The SUPPLIER shall provide the following reports as required by the CONTRACT: 6.1.1. Weekly Progress Report (Refer to Exhibit 6 – Appendix 5: Sample of Customer Progress Report). 6.1.2. Ad-hoc reports: any reports required due to unforeseen circumstances. 6.1.3. All reports shall be addressed to MMHE REPRESENTATIVE. 6.1.4. All reports shall be in standard ISO A4 size. 6.2. Weekly Progress Report 6.2.1. Throughout the performance of the WORK, the SUPPLIER shall prepare and submit a Weekly Progress Report to MMHE within two (2) days of the weekly cut-off date. 6.2.2. The Weekly Progress Report shall be in narrative, tabulation and Ref. No.: MHHE/ITB/SCM/11-REV0 CONTRACT EXHIBIT 6 Page 4 of 11 ___________________________________________________________________________________________________________________ graphical form and shall report on the following aspects of the WORK: (a) Progress narrative covering all areas of operation. (b) Areas of concern, including impact and proposed mitigation measures. (c) Schedule bar chart including all activities within the logic network, showing planned and actual starts and finishes, sorted by WBS and scheduled start in a format agreed with MMHE. (d) Progress S-curve showing planned, actual and forecast progress for each of the major elements of the WORK, down to Level 2. (e) A summary procurement tabulation for requisitions and purchase orders detailing total identified and status of enquiry and award activities. (f) Project photographs both in hard and soft copy. 6.3Materials Report The Materials Report section shall include, as a minimum, the following information: (a) A material progress and tracking report for all materials to be supplied by the SUPPLIER and MMHE (separately) giving details of the requisition or order number, the description of the material, the quantities ordered, the quantities required to complete the WORK, the quantities ordered for spare, the date ordered, the supplier, the date due or actually delivered and the certificate or inspection report number. (b) The Materials Report shall also include the planned and actual progress of manufacturing and the planned and forecast delivery dates. 6.4 Final Report 6.4.1 The Final Report as per SDRL in the Approved for Purchase Specification. 7.0 DRAWING AND DOCUMENT SUBMISSION PROCEDURES 7.1. All drawings and required documents shall be submitted via uploading the file in MMHE online Vendor Data Management System (VDMS). 7.2. Drawings
no reviews yet
Please Login to review.