280x Filetype PDF File size 0.08 MB Source: www.imperial.ac.uk
NEC 3 The Accepted Programme Submitting and revising the Accepted Programme Clause 31 and 32 NEC3 The programme identified in the Contract Data is the When must the Contractor submit a programme ? Is there a programme identified in Yes “Accepted Programme” the contract data ? NEC 3 Clause 31.2 The Contractor Must submit a first programme for acceptance to the Project No Has the Project Manager instructed Contractor to When should the Manager, within the period stated in the submit a revised Programme contractor revise Contract Data the accepted Programme? Has the Contractor Yes No NEC 3 Clause 31.2 submitted the first The programme submitted Mustshow: programme for acceptance showing Contractor must The starting date, access dates, key dates all the information submit a revised Even if there is no instruction the and completion date. required ? programme within contractor must submit a revised Planned completion this period for reply programme on a periodic basis. The The period for reply is max interval between programmes Order / timing of operations set out in contract being submitted is set out in the Order / timing of work the employer and No data part 1 contract data part 1 any others, and the dates when the contractor plans to complete work required Yes to allow others to carry out works 25% of payment The dates when the contractor plans to withheld until a Contractor Submits a Revised Programme to the Project meet each condition stated for the key correct Manager dates programme is Dates when the Contractor needs access to submitted part, of the site if later than its access dates Acceptances, plant, materials and other Has the Project Manager accepted the programme or notified things to be provided by the employer and reasons for not accepting within 2 weeks information from others Yes There is an “Accepted Programme “ For each operation, a statement of how the No contractor pans to do the work (including Contractor to revise and issue equipment and resources) Project Manager Does Project Manager Accepts Provisions for Float, Time risk allowances, Neither the programme contractually compliant Health and safety requirements, contract programme procedures, information showing how each Project manager notifies Yes activity on the activity schedule relates to Contractor notifies a reason for not accepting Contractor notifies and operation when using Option A or Option C compensation event the programme. Is the compensation event under under Clause 60.1(6) reason listed in Clause 31.3 No clause 60.1(9)
no reviews yet
Please Login to review.