jagomart
digital resources
picture1_Inventory Management Pdf 192640 | Artigo Marianacarvalho(65851)


 150x       Filetype PDF       File size 0.89 MB       Source: fenix.tecnico.ulisboa.pt


File: Inventory Management Pdf 192640 | Artigo Marianacarvalho(65851)
the optimization of production planning and scheduling a real case study in ice cream industry mariana pedroso casal ribeiro de carvalho1 1 master in industrial engineering and management instituto superior ...

icon picture PDF Filetype PDF | Posted on 05 Feb 2023 | 2 years ago
Partial capture of text on file.
                        The Optimization of Production Planning and Scheduling: 
                        A Real Case Study in Ice-cream Industry 
                        Mariana Pedroso Casal Ribeiro de Carvalho1 
                         
                        1 Master in Industrial Engineering and Management, Instituto Superior Técnico, Universidade Técnica de 
                    Lisboa-UTL 
                        Abstract 
                        As other segments of the food industry, the ice-cream industry has its own features that influence the production 
                    management of its processes. Amongst these we identify: changeover tasks, products shelf-life and perishability, 
                    multiple  deliveries during the planning horizon and RMs procurement and inventory control. These aspects have 
                    been often left out when studying the production planning and scheduling within the batch food industries. Thus, 
                    the problem seeks an optimal solution for the production planning and scheduling of a dairy food company, where 
                    a methodology was proposed to address the main features of this industry based on the integration of two supply 
                    contracts at the scheduling level. Two mixed  integer linear programming  (MILP)  models are developed where the 
                    RMs´ shelf-life  aspect is integrated in the operation scheduling, extending them to explore  different contractual 
                    relationships between suppliers and the company, applying the RTN  methodology. Both RTN  mathematical 
                    approaches are applied to the present case-study in order to evaluate which contract type is more suitable for the 
                    present production process, in terms of scheduling, raw-material  costs and final products’ quality. The obtained 
                    results as well as the computational statistics are analysed. 
                        Keywords: scheduling of production, perishable products, inventory control of RMs and supplier contracts. 
                    1. Introduction                                                    cream  industry  is  a  food  industry  niche  and  the 
                         The food industry has been growing throughout                 literature regarding this subject is very scarce. 
                    the  years.  This  growth  has  been  driven  by  the                  Nevertheless,  some  research  has  been  made 
                    increase of new market competitors, as well as by an               considering the problematic  of the optimization  of 
                                                                                       the  production  planning  and  scheduling  in  food 
                    increase     on    the    consumers’      demand      and          industry.  Entrup  et  al.  (2005)  have  developed  a 
                    requirements. These factors combined have changed                  MILP formulation considering shelf-life  restrictions 
                    the  trends  in  the  industry  and,  production                   for the final products applied to the yoghurt industry. 
                    optimization  is nowadays a need. In this context the              This aspect was accounted in the objective function, 
                    production scheduling became an important activity                 which  aims  to maximize  the  margin  contribution. 
                    for  companies,  allowing  them  to determine  when,               Considering the segment of seafood products, Cai et 
                    where and how a set of products should be produced                 al.  (2008)  proposed a  formulation  that takes  into 
                    considering the operational aspects.                               account the  RMs  perishability,  considering  three 
                         Thus, the scheduling activity has an important                type  of  decisions:  i)  the  type  of  products to  be 
                    role  for performance  improvement  while  adjusting               produced, ii)  the processing time of resources to be 
                    the  resources consumption/production to  demand                   allocated to each type of product, and finally, iii)  the 
                    through an accurate allocation.  In the artisanal ice-             sequence of products production . The authors stated 
                    creams production, the major  challenge is related to              that this model can be applied to any system that has 
                    the  raw-materials’  quality  aspects  as  the  final              limitations  in terms  of RM  and uncertainty in  the 
                    products’ qualities/freshness is deeply dependent on               delivery  dates.  Amorim  et  al.  (2011)  have  also 
                    these  characteristics.  Hence,  it  is  important  to             presented a MILP formulation exploring two cases; 
                    address this aspect at the scheduling level.                       i)  a  make-to-order  and; ii)  a  hybrid make-to-order 
                        RMs’ procurement and inventory control must                    /make-to-stock strategy.  
                    also be considered as part of the different contractual                Besides,  another  research  stream  has  been 
                    forms  that exist  between supplier  and companies,                explored  considering  the  inventory  models  for 
                    since  in  this  type of  industry the  RMs  price  and            perishable products such as the work developed by 
                    availability  suffers  a  high  volatility  which  has  a          Goyal (1994)  and Soman et al. (2004)  based on the 
                    direct impact in the way that RMs are purchased and                application  of  the  Economic  Lot  Size  Problem 
                    their costs.                                                       (ESLP).    However,  the  ESLP  has  in  its  base 
                    2. Related Literature                                              assumptions that are  unrealistic  for  the ice-cream 
                                                                                       industry namely the constant demand rate assumed 
                        A wide range of methodologies and techniques to                in these problems which is not realistic for fresh food 
                    deal with the production planning and scheduling is                industries with  seasonal products, as it  is  the ice-
                    available in the literature. However, the artisanal ice-           cream industry. 
                                                                                                                                                1 
                         
                          Notwithstanding,  the  research  on  production 
                      scheduling in the ice-cream  industry with perishable                       Raw Materials           Packaging           Solidification
                      goods inventory control is still at its beginning.                            Reception
                            Moreover, since in the dairy industry the RMs’ 
                      procurement plays an important role, the relationship                                             Intermediated 
                      between companies and suppliers becomes a crucial                            Preparation             Storage               Frozen 
                      aspect  to  be  integrated  in  the  planning  and                                                  (Cooling)              Storage
                      scheduling  production  mainly  because  of  the 
                      fluctuations on quality and price of RMs delivered.                            Blending           Pasteurize/Ho
                      Thus two supply contract types  are explored:  the                                                  mogenize
                      Fixed  Commitment  Contract  (FCC)  and the Spot 
                      Market Contract (SMC).  The FCC  is a long term                         Figure 1 – Generic Ice-cream/Sorbet  Production Process. 
                      contract where two aspects are defined a priori: i) 
                      quantity supplied and ii) price of RMs. As for i), the                  2.2. Methodology 
                      quantities of RMs delivered in the period are fixed.                         The  artisanal  ice-cream  industry  has  special 
                      Consequently,  in  industries  where  demand  is                        features,  such  as:  changeover  tasks  between 
                      uncertain, producers may take a significant risk  as                    productions,  multiple        deliveries,    shelf-life    of 
                      regards inventory management as they are unable to                      products,  procurement  and  inventory  control  of 
                      forecast the exact amount of RMs they will need. As                     RMs. All these features must be integrated in the 
                      regards to ii),  the price of RMs is negotiated by the                  scheduling process in order to make  it, as close to 
                      parties and remains  the  same  during the  contract.                   reality as possible. Moreover, due the importance of 
                      Thus,  the  buyer  does  not  benefit  from  the                        procurement and inventory control methods for this 
                      fluctuations of RMs’ price which may occur in the                       work, it will  be considered the integration of the two 
                      spot  market.       However,       the    purchase  price               supply contracts at the scheduling level.  To clarify 
                      established is  lower  than the average spot market                     the integration of  these aspects in  the scheduling, 
                      price.  Other  benefits can  arise  from  a  long  term                 Figure  2,  shows the methodology developed to be 
                      commitment  as Minner, S. (2003)  points out.                           followed in the next chapters of this work.  
                          The SMC is characterized both by allowing the                             
                      buyer to benefit from the fluctuations on RMs’ price 
                      and by granting the flexibility  of moving from  one 
                      supplier  to  another  without  any  investment. 
                      However,  even though one can benefit  from  the 
                      variations  on  price,  in  this  type  of  contract  the 
                      company pays the spot market price.    
                            Having  this  framework  and  exploring  the 
                      existent gap on the literature for addressing all these 
                      features at the scheduling of production level, in the 
                      present  work  are  developed  two  mathematical 
                      formulations  for  the  artisanal  ice-cream  batch 
                      multipurpose and multi-product process. The aim of 
                      the models is to explore  the characteristics of  this 
                      industry, accounting for RMs perishability and their 
                      inventory control,  changeover tasks  and  multiple 
                      deliveries  based on two different  supply contracts,                           Figure 2 - Framework of the present case study.  
                      simultaneously  with  the  planning  and  process                                                studystudy. 
                      scheduling.                                                                  The models consider the specific characteristics 
                                                                                              of  the  present  production  process.  The  multiple 
                      2.1. Description of Ice-cream Production  Process                       deliveries and changeover tasks will  be integrated at 
                          The ice-cream industry has different types of ice-                  the same time that it is considered the perishability 
                      creams production, which are often classified into                      of  RMs.  Taking  into  account  the  two  types  of 
                      four categories according to their main  ingredient:                    contracts, some features must be adapted to reflect 
                      vanilla, cream, yoghurt and fruits/sorbets. However,                    the reality of each contract, which is the case of the 
                      when considering the production process of these                        perishability of RMs. Thus, in the FCC,  it must be 
                      products they are mainly  divided in two categories:                    integrated  the  control  of  RMs’  shelf-life  in  the 
                      sorbets and other types of ice-creams  production.                      scheduling of production to account with the reduced 
                      Both categories differ in its production process until                  shelf-life  of these products. In this sense, the RMs’ 
                      frozen task is reached. For confidentiality reasons a                   shelf-life control concept will be applied (Figure 2). 
                      generic      ice-cream       production       process      is                 
                      characterized in Figure 1.                                                 
                                                                                                 
                                                                                                                                                          2 
                           
                                                                                                                                                                                                                   Selling price of ice-creams and sorbets; 
                                               Figure 3 - Schematic representation of RMs’ shelf-life.                                                                                                             The  production requirements  and  deliveries 
                                                                                                                                                                                                                          dates along the planning horizon. 
                                                                                                                                                                                                                  
                                                                                                                                                                                                                 Determine:   
                                                                                                                                                                                                                   The amount of each resource used;  
                                                                                                                                                                                                                   The task-unit assignment and the batch size; 
                                                                                                                                                                                                                   The optimal scheduling satisfying not only the 
                                                                                                                                                                                                                          multi-deliveries  along  horizon,  but  also,  the 
                                                   The RMs’ shelf-life  must be quantified from  the                                                                                                                      demand at final horizon;  
                                               beginning  of  the  planning  horizon  until  the                                                                                                                   Raw-materials  profile for the time horizon.  
                                               production  instant.  Considering  instant  t,  the                                                                                                                 The final quantity of RMs discarded at the end 
                                               moment  that a RM is required for production and,                                                                                                                          of the planning horizon by not respecting the 
                                                 its shelf-life.  If t ≤   its shelf-life  is greater                                                                                                             shelf-life restriction. 
                                                                                                                                                                                                                   
                                               than the production date and the RM has the safety                                                                                                                      3.1 Mathematical  formulation  for FCC 
                                               and quality properties to be processed. However, in                                                                                                                     In  this  section is  presented the  FCC  model’s 
                                               periods that t >   is verified,  the the production 
                                                                                                                                                                                                          formulation. The problem can be defined as follows: 
                                               date t is greater than the RM  shelf-life,  it will  not                                                                                                               
                                               fulfil  the safety and quality patterns, going to the                                                                                                                 3.1.1. Indexes 
                                               disposal. All the reaming  quantity of RMs that have 
                                               already overcome its shelf-life  and consequently, is                                                                                                                 d             Deliveries 
                                               deteriorated, will  be not used in production.                                                                                                                        k             Tasks 
                                                   Finally,  for  the  SMC,  this  feature  will  not  be                                                                                                            r             Resources   
                                               explicitly  considered in the model since in this case                                                                                                                t             Time  
                                               the company will  work in a JIT production strategy.                                                                                                                  θ             Relative time to define the start of a task 
                                               3. Problem Statement                                                                                                                                                   
                                                                                                                                                                                                                     3.1.2. Sets 
                                                   In this section with the objective of supporting the                                                                                                               
                                               production  scheduling  in  an  artisanal  ice-cream                                                                                                         Cr                     {rϵR: set of all material  resources, such as: 
                                               production line of a multiproduct dairy batch plant,                                                                                                                                RMs, intermediate products and final 
                                               it  will  be developed and characterized  both MILP                                                                                                                                 products} 
                                                                                                                                                                                                            D                      {rϵR: set of all equipment and human 
                                               models based on the RTN approach.                                                                                                                                 r
                                                                                                                                                                                                                                   resources} 
                                                   In  most  dairy  industries,  the  quantity  of  final                                                                                                   D                      {rϵD : the equipment resources used for 
                                                                                                                                                                                                                 chg                           r
                                               products to  produce is  known  at  the  start of  the                                                                                                                              the changeover tasks} 
                                               planning horizon. Some assumptions are considered                                                                                                            K                      {k: Set of all tasks} 
                                               to develop the mathematical formulations, such as:                                                                                                                proc
                                                                                                                                                                                                            K                      {kϵK, rϵD : set of all processing tasks, k, 
                                                                                                                                                                                                                                                            r
                                                                                                                                                                                                                                   operating in an equipment resource, r} 
                                                     All RMs used in the process are received at the                                                                                                       Kchg                   {kϵK: set of all changeover tasks, k, to be 
                                                            begging of the planning horizon.                                                                                                                                       performed in an equipment resource, r} 
                                                     The quantity of RMs received will  fulfill  the                                                                                                       R                      {r: set of all resources} 
                                                            weekly production.                                                                                                                              Rp                     {rϵCr: set of final products} 
                                                     The RMs have different shelf-lives.                                                                                                                   Rrm         {rϵCr: set of RMs}                                                                                       
                                                     The RMs are available for production until they                                                                                                       Sr                     {rϵCr: set of material  resources with 
                                                            reach their shelf-life (t ≤   ).                                                                                                                                   storage} 
                                                                                                                                                                                                          Τ                      {kϵK,rϵD : set of all tasks, k, that uses 
                                                                                                                                                                                                                hr                                         r
                                                          The optimal  scheduling of production can be                                                                                                                             operators teams as resources} 
                                               obtained by solving the following problem:                                                                                                                            3.1.3. Parameters 
                                                        Given:                                                                                                                                                                 Spoilage cost of deteriorating RMs. 
                                                     Process description by a RTN representation;                                                                                                                               Storage cost of deteriorating RMs. 
                                                     The maximum  amount of each type of resource                                                                                                               H                               Planning horizon; 
                                                            available;                                                                                                                                                             Selling price of final products;  
                                                     Resource characteristics and capacities;                                                                                                                                  
                                                                                                                                                                                                                                   Acquisition cost of RMs;  
                                                     Time horizon of planning;                                                                                                                                                 
                                                                                                                                                                                                                         min             max 
                                                                                                                                                                                                                 Q               Q               Minimum  /Maximum  amount of 
                                                     Task and resources operating data;                                                                                                                             rd              rd
                                                     RMs’ shelf-life;                                                                                                                                                                           resource r Rp to deliver in instant d.  
                                                     RM’s spoilage, purchase and storage costs;                                                                                                                 Rrdemand                        Demand of final resource r; 
                                                     Quantities contracted of raw-materials;                                                                                                                    R0r                             Resource, rϵR, available initially; 
                                                                                                                                                                                                                                                                                                                                                 3 
                                                         
                                                      Shelf-life  of RMs;                                                                       Binary Variables 
                                   ed  ld                                                                                                   N  Binary variable that takes the value 1  if  task k 
                                T         T               The earliest/latest time to deliver, r                                                kt
                                      rd       rd                                                                                                   starts at time t, otherwise is 0; 
                                                          R , in instant d.
                                                             p                                                                                   chg
                                      min        max                                                                                          N kt             Binary  variable  that takes  the value  1  if 
                                Vkr         Vkr           Minimum/Maximum  allowed 
                                                          capacity of resource r to perform  task                                                   changeover task k starts at time t, otherwise is 0;  
                                                          k;                                                                                         
                                   ℎ              Processing time for task k/Processing                                                     Continuous Variables 
                                                                                                                                          Inv             Raw-materials  inventory level 
                                                          time for changeover task k;                                                               rm
                                μchg                      Resource (processing unit) r                                                        ξkt             Quantity of material  undergoing task k  at 
                                        krθ                                                                                                                   the beginning of instant t; 
                                                          consumed at the start/end of the                                                    R               Quantifies the amount of available resource 
                                                                                          chg                                                   rt
                                                          changeover task k                     and at time                                                   r at the instant t; 
                                                          relative θ;                                                                         ∏               Total amount of final product, r, delivered 
                                μ         ν               Resource produced/consumed of task                                                     rt
                                   krθ /   krθ                                                                                                                at instant t. 
                                                          k at the start/ end of time relative θ;                                             IDisposal  Quantity of RM r that has to be discarded 
                                                                                                                                                               r
                                       3.1.4. Variables                                                                                                       by not respect the shelf-life restriction 
                                       In the model it  is necessary to considered both                                                       Z               Quantifies the profit 
                                binary and continuous variables, as presented below.  
                                        
                                       3.1.5. Mathematical  formulation  for FCC Model 
                                       After being defined all the indexes, sets, parameters and variables, the mathematical  formulation  for the FCC 
                                is developed, to be applied to the case study comprising the following constraints: 
                                       Objective  Function 
                                                                                                                                                                           
                                                                                                 fp                            (                       rm)                                                   Spoilage
                                         = ∑ ∑(∏  × Price )  –[ ∑ ∑ R0  ×Price                                                                          +  ∑ (IDisposal × C                                       )
                                                                                             r                                   r                 r                                           r
                                                          ∈                                           ∈                                            ∈
                                                                              ∑ ∑(                                        storage)
                                                                       +r ∈           IDisposalr × C                              ]                                                                                     [1]  
                                         Subject to: 
                                                                                                                                        chg
                                                                                                                                       τ
                                                                                            τk                                          k
                                                                                                                                                  chg       chg
                                Rrt = Rro|t=1 + Rrt−1|t>2 + ∑∑(μ                                          Nkt−θ) + ∑ ∑(μ  N                                         )∀r ∈ DR,t ∈ H                               [2] 
                                                                                                     krθ                                          krθ       kt−θ
                                                                                      k θ=0                                      chg θ=0
                                                                                                                            kϵ k
                                                                  τk
                                R =R0 + ∑ ∑(ν ξ                                          )  ∀ r ∈ R             , t = 1                                                                                                     [3] 
                                   rt            r                         krθ kt−θ                        rm
                                                        k∈K θ=0
                                                              r
                                                                           τk
                                Rrt = Rrt−1|t≥2 + ∑ ∑(νkrθξ                                       )  ∀ r ∈ Rrm,t ≤                                                                                         [4] 
                                                                                           kt−θ
                                                                 k∈K θ=0
                                                                       r
                                                                                τk                                                                  τk
                                                                 ∑ ∑(                                   )                             ∑ ∑(                                  )      (            )
                                R =R                   +                              ν       ξ           │ ≤  +                                     ν      ξ           − −∏    ∀ r\R ,t ϵ H   [5] 
                                   rt          rt−1                                     krθ kt−θ                                                           krθ kt−θ                                     rm
                                                           k∈K =Sto1 θ=0                                                         k∈K \Sto          θ=0
                                                                 r          k                                                         r       1k
                                IDisposal = R   ∀ r ∈ R                              , t =        −1                                                                                                                    [6] 
                                                  r          rt                 rm                 
                                                                                                         
                                              ≤        ≤                         ∀ ∈ ,  ∈                  ,  ∈                                                                                         [7] 
                                                               
                                                                 
                                  
                                ∑(− ∏ )≥      ∀ ∈  , ∈                                                                                                                     [8] 
                                                                                        
                                 =1
                                                                                                                                                               
                                                  
                                 ≤        ∑ (−∏ )≤ ∀ ∈  , ∈ , ∈                                                                                                [9] 
                                                                                           
                                                =Ted
                                                                                         
                                                                                                                                                                                                                                          4 
                                        
The words contained in this file might help you see if this file matches what you are looking for:

...The optimization of production planning and scheduling a real case study in ice cream industry mariana pedroso casal ribeiro de carvalho master industrial engineering management instituto superior tecnico universidade tecnica lisboa utl abstract as other segments food has its own features that influence processes amongst these we identify changeover tasks products shelf life perishability multiple deliveries during horizon rms procurement inventory control aspects have been often left out when studying within batch industries thus problem seeks an optimal solution for dairy company where methodology was proposed to address main this based on integration two supply contracts at level mixed integer linear programming milp models are developed aspect is integrated operation extending them explore different contractual relationships between suppliers applying rtn both mathematical approaches applied present order evaluate which contract type more suitable process terms raw material costs f...

no reviews yet
Please Login to review.