jagomart
digital resources
picture1_Estimate Format In Excel Free Download 12421 | Supplier Bvr Tool | Business Form Tools


 193x       Filetype XLSX       File size 0.02 MB       Source: yukon.ca


File: Estimate Format In Excel Free Download 12421 | Supplier Bvr Tool | Business Form Tools
bid value reduction supplier estimate tool this tool can be used to provide estimates for applicable bid value reduction s bid value reductions are not guaranteed and will be applied ...

icon picture XLSX Filetype Excel XLSX | Posted on 08 Jul 2022 | 3 years ago
Partial file snippet.
               Bid Value Reduction Supplier Estimate Tool
        This tool can be used to provide estimates for applicable Bid Value Reduction(s). Bid Value 
        Reductions are not guaranteed and will be applied by Procurement Support Centre after a 
        verification process. Complete the relevant fields below in blue to calculate an Estimated Bid 
        Value Reduction. This tool can be used for both your business, and your subcontractors. The 
        Parts A through C align with the BVR form found within the electronic bidding system. For more 
        information on Bid Value Reductions, please visit:
        https://yukon.ca/en/bid-value-reductions
                                 Part A
        Yukon First Nation (YFN) Business Name
        Enter the YFN business name.
        YFN Business Ownership Percentage
        Select YFN Business ownership percentage from the three options in the drop down menu.
        *Note, not-for-profits and corporations, please select 50% for the calculation tool to apply 
        correct BVR percentages. 
        YFN Business Location
        To be eligible for the YFN Business location bid value reduction, the YFN primary business 
        location must be located outside of Whitehorse and in the Traditional Territory where some or all 
        of the Work will occur. If the YFN business does not meet these requirements, select no.
                                 Part B
        Total Dollar Value of work being completed by the YFN business
        Enter the total dollar value of the work to be performed by the YFN business. This value includes 
        the costs to perform the work, including labour costs for YFN and non-YFN employees. 
                                 Part C
        Total dollar value of wages to be paid to YFN Labour by YFN and non-YFN owned busin
        For each YFN owned business, enter the dollar value of the wages that will be paid to YFN 
        employees for labour. 
        If you or your subcontractors are a non-YFN business but have YFN employees, enter in the total 
        dollar value of those wages in Part C, leaving Part A and B blank. 
                          PART A
                                          Is the YFN Business 
                                          located in a Community 
                              YFN Business outside of Whitehorse 
          YFN Business Name   Ownership   and in the Traditional 
                              Percentage  Territory where some or 
                                          all of the Work will take 
                                          place?
Bid Value Reduction Supplier Estimate Tool
This tool can be used to provide estimates for applicable Bid Value Reduction(s). Bid Value 
Reductions are not guaranteed and will be applied by Procurement Support Centre after a 
 to calculate an Estimated Bid                          For more information or 
Value Reduction. This tool can be used for both your business, and your subcontractors. The questions please contact the 
Parts A through C align with the BVR form found within the electronic bidding system. For more Procurement Support Centre. 
                                                        867-667-5385
                                                        contracts@yukon.ca
Part A
Yukon First Nation (YFN) Business Name
Enter the YFN business name.
YFN Business Ownership Percentage
Select YFN Business ownership percentage from the three options in the drop down menu.
*Note, not-for-profits and corporations, please select 50% for the calculation tool to apply 
YFN Business Location
To be eligible for the YFN Business location bid value reduction, the YFN primary business 
location must be located outside of Whitehorse and in the Traditional Territory where some or all 
of the Work will occur. If the YFN business does not meet these requirements, select no.
Part B
Total Dollar Value of work being completed by the YFN business
Enter the total dollar value of the work to be performed by the YFN business. This value includes 
the costs to perform the work, including labour costs for YFN and non-YFN employees. 
Part C
Total dollar value of wages to be paid to YFN Labour by YFN and non-YFN owned busin
For each YFN owned business, enter the dollar value of the wages that will be paid to YFN 
If you or your subcontractors are a non-YFN business but have YFN employees, enter in the total 
dollar value of those wages in Part C, leaving Part A and B blank. 
                  PART B                 PART C
         Total dollar value of   Total dollar value 
         Work being              of wages to be 
         completed by the YFN paid to YFN            Estimated BVR 
         business (include YFN Labour
         labour costs)
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
                                                                 $0.00
         Total Bid Value Reduction Estimate                    $0.00
The words contained in this file might help you see if this file matches what you are looking for:

...Bid value reduction supplier estimate tool this can be used to provide estimates for applicable s reductions are not guaranteed and will applied by procurement support centre after a verification process complete the relevant fields below in blue calculate an estimated both your business subcontractors parts through c align with bvr form found within electronic bidding system more information on please visit httpsyukoncaenbidvaluereductions part yukon first nation yfn name enter ownership percentage select from three options drop down menu note notforprofits corporations calculation apply correct percentages location eligible primary must located outside of whitehorse traditional territory where some or all work occur if does meet these requirements no b total dollar being completed performed includes costs perform including labour nonyfn employees wages paid owned busin each that you but have those leaving blank is community take place questions contact contracts yukonca include...

no reviews yet
Please Login to review.